Semua | Belum e-Kontrak | Belum Penilaian Kinerja | Selesai | |||||
---|---|---|---|---|---|---|---|---|
Jenis | Paket | Pagu | Paket | Pagu | Paket | Pagu | Paket | Pagu |
Tender | 216 | 263.434.045.164 | 53 | 41.851.283.971 | 216 | 263.434.045.164 | 0 | 0 |
Seleksi | 17 | 7.545.165.000 | 3 | 1.732.500.000 | 17 | 7.545.165.000 | 0 | 0 |
Tender Cepat | 17 | 16.507.835.329 | 7 | 9.717.431.569 | 17 | 16.507.835.329 | 0 | 0 |
Total | 251 | 287.883.304.356 | 64 | 53.697.474.403 | 251 | 287.883.304.356 | 0 | 0 |
Persentase | 25.5 % | 100 % | 0 % |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembangunan Gedung kantor Camat Tambang Ulang | Tender | Pekerjaan Konstruksi | 3715172 | 26878850 | APBD | 3,186,414,000 | 3,186,334,867 | 3,170,925,586 | 3,170,925,586 | 3,168,180,000 | 3,168,180,000 | 0 | 0 | 2021-02-04 | 2021-02-22 | 2021-03-18 | 31.791.613.8-322.000 | PT. INSAN KHARISMA ABADI | 31.791.613.8-322.000 | PT. INSAN KHARISMA ABADI | 15,488,414 | 0.49 % | Belum dinilai |
2 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembangunan Gedung Kantor Camat Panyipatan | Tender | Pekerjaan Konstruksi | 3716172 | 26878696 | APBD | 3,216,906,000 | 3,216,588,562 | 3,168,339,733 | 3,168,339,733 | 3,165,514,000 | 3,165,514,000 | 0 | 0 | 2021-02-04 | 2021-02-22 | 2021-03-17 | 31.791.613.8-322.000 | PT. INSAN KHARISMA ABADI | 31.791.613.8-322.000 | PT. INSAN KHARISMA ABADI | 48,566,267 | 1.51 % | Belum dinilai |
3 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembangunan Gedung Kantor Camat Batu Ampar | Tender | Pekerjaan Konstruksi | 3717172 | 26878563 | APBD | 3,186,414,000 | 3,186,306,611 | 3,143,225,106 | 3,143,225,106 | 3,140,653,000 | 3,140,653,000 | 0 | 0 | 2021-02-04 | 2021-02-22 | 2021-03-18 | 01.124.888.7-731.000 | PT. TRIASA PUTRA ABADI | 01.124.888.7-731.000 | PT. TRIASA PUTRA ABADI | 43,188,894 | 1.36 % | Belum dinilai |
4 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Konsolidasi Pekerjaan Pengoptimalan SPAM IKK Pelaihari IPA Kap 20 lpd dan perluasan jaringan perpipaan IKK Bajuin (DDUBNUWSP) | Tender | Pekerjaan Konstruksi | 3726172 | 26973551 | APBD | 7,320,000,732 | 7,313,336,556 | 7,039,810,022 | 7,084,067,848 | 7,084,067,848 | 7,084,067,848 | 7,039,810,022 | 0 | 2021-04-26 | 2021-05-12 | 2021-05-28 | 31.693.768.9-731.000 | PT. PUTRA KALIMANTAN BERSATU | 31.693.768.9-731.000 | PT. PUTRA KALIMANTAN BERSATU | 280,190,710 | 3.83 % | Belum dinilai |
5 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Konsolidasi Pengoptimalan Jaringan Perpipaan Kec. Kurau dan Kec. Bumi Makmur (SPAM Regional Banjarbakula) | Tender | Pekerjaan Konstruksi | 3727172 | 26884450 | APBD | 8,300,000,830 | 8,296,619,583 | 8,111,517,072 | 8,111,517,072 | 8,111,517,072 | 8,111,517,072 | 8,111,517,072 | 0 | 2021-04-26 | 2021-05-12 | 2021-05-28 | 31.693.768.9-731.000 | PT. PUTRA KALIMANTAN BERSATU | 31.693.768.9-731.000 | PT. PUTRA KALIMANTAN BERSATU | 188,483,758 | 2.27 % | Belum dinilai |
6 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Penambahan Gedung Kantor Inspektorat Kabupaten Tanah Laut | Tender | Pekerjaan Konstruksi | 3728172 | 26924406 | APBD | 2,515,590,000 | 2,515,572,528 | 2,486,944,346 | 2,486,944,346 | 2,483,941,000 | 2,483,941,000 | 0 | 0 | 2021-02-04 | 2021-02-22 | 2021-03-15 | 01.124.865.5-731.000 | PT. PARTNER KEMENANGAN | 01.124.865.5-731.000 | PT. PARTNER KEMENANGAN | 28,645,654 | 1.14 % | Belum dinilai |
7 | 2021 | Badan Pengelolaan Keuangan dan Aset Daerah | Belanja Sewa Kendaraan Bermotor Angkutan Barang | Tender | Jasa Lainnya | 3731172 | 27048901 | APBD | 1,107,360,000 | 1,107,359,986 | 1,051,991,978 | 1,051,991,978 | 1,029,845,520 | 1,029,845,520 | 0 | 0 | 2020-12-17 | 2020-12-30 | 2021-01-11 | 01.357.583.2-046.000 | PT SERASI AUTORAYA | 01.357.583.2-046.000 | PT SERASI AUTORAYA | 55,368,022 | 5 % | Belum dinilai |
8 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembangunan Puskesmas Baru Desa Bentok Kampung Kecamatan Bati - Bati | Tender | Pekerjaan Konstruksi | 3732172 | 26924547 | APBD | 6,361,647,600 | 6,361,311,000 | 6,085,660,894 | 6,085,660,894 | 6,080,159,000 | 6,080,159,000 | 0 | 0 | 2021-02-04 | 2021-02-22 | 2021-03-15 | 02.614.268.7-731.000 | PT. KENCANA MURNI KARYA MANDIRI | 02.614.268.7-731.000 | PT. KENCANA MURNI KARYA MANDIRI | 275,986,706 | 4.34 % | Belum dinilai |
9 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembangunan Puskesmas Baru Desa Durian Bungkuk Kecamatan Batu Ampar | Tender | Pekerjaan Konstruksi | 3733172 | 26924613 | APBD | 6,361,647,600 | 6,361,527,000 | 6,118,310,698 | 6,118,310,698 | 6,112,807,000 | 6,112,807,000 | 0 | 0 | 2021-02-04 | 2021-02-22 | 2021-03-15 | 01.141.461.2-731.000 | PT. PELITA ANDIKA AMBAR LESTARI | 01.141.461.2-731.000 | PT. PELITA ANDIKA AMBAR LESTARI | 243,336,902 | 3.83 % | Belum dinilai |
10 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembangunan Gedung Dinas Kependudukan dan Pencatatan Sipil Kabupaten Tanah Laut | Tender | Pekerjaan Konstruksi | 3749172 | 26924235 | APBD | 3,298,218,000 | 3,298,051,000 | 3,158,777,806 | 3,277,275,000 | 3,277,275,000 | 3,277,275,000 | 0 | 0 | 2021-04-26 | 2021-05-12 | 2021-06-28 | 82.114.778.2-731.000 | PT. BANUA JAYA GROUP | 82.114.778.2-731.000 | PT. BANUA JAYA GROUP | 139,440,194 | 4.23 % | Belum dinilai |
11 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembangunan Gedung Command Center Dinas Komunikasi dan Informatika Kabupaten Tanah Laut | Tender | Pekerjaan Konstruksi | 3750172 | 26924143 | APBD | 3,415,500,000 | 3,413,794,342 | 3,356,798,449 | 3,356,798,449 | 3,353,490,000 | 3,353,490,000 | 0 | 0 | 2021-03-25 | 2021-04-07 | 2021-04-21 | 03.018.148.1-732.000 | PT. ADJI PERKASA | 03.018.148.1-732.000 | PT. ADJI PERKASA | 58,701,551 | 1.72 % | Belum dinilai |
12 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pengembangan Jaringan Distribusi dan Sambungan Rumah Desa Handil Babirik Kecamatan Bumi Makmur | Tender | Pekerjaan Konstruksi | 3754172 | 28465286 | APBD | 6,045,000,000 | 6,041,102,280 | 5,954,154,839 | 5,954,154,839 | 5,954,154,839 | 5,954,154,839 | 5,596,905,548 | 0 | 2021-04-26 | 2021-05-12 | 2021-05-28 | 90.162.951.9-731.000 | PT. BERKAT EMPAT SAUDARA | 90.162.951.9-731.000 | PT. BERKAT EMPAT SAUDARA | 90,845,162 | 1.5 % | Belum dinilai |
13 | 2021 | Dinas Komunikasi, Informatika, Statistik dan Persandian | Biaya berlangganan internet dan IP publik | Tender Cepat | Jasa Lainnya | 3755172 | 27410584 | APBD | 2,500,000,000 | 2,424,419,987 | 2,380,419,987 | 2,380,419,987 | 2,380,419,987 | 2,380,419,987 | 0 | 0 | 2021-02-26 | 2021-02-26 | 2021-03-02 | 01.000.013.1-093.000 | PT. Telekomunikasi Indonesia, Tbk. | 01.000.013.1-093.000 | PT. Telekomunikasi Indonesia, Tbk. | 119,580,013 | 4.78 % | Belum dinilai |
14 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Studi Komprehensif Pengendalian Banjir DAS Tabanio | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3756172 | 27445221 | APBD | 1,499,999,600 | 1,499,924,319 | 1,350,580,000 | 1,350,580,000 | 1,350,580,000 | 1,350,000,000 | 0 | 0 | 2021-03-01 | 2021-04-13 | 2021-05-03 | 02.241.591.3-424.000 | PT. WINAGUNA SARANA TEKNIK | 02.241.591.3-424.000 | PT. WINAGUNA SARANA TEKNIK | 149,419,600 | 9.96 % | Belum dinilai |
15 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembuatan Desain Pengembangan Daerah Irigasi Desa Benua Raya Kecamatan Bati-Bati | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3758172 | 27446357 | APBD | 349,999,100 | 349,949,294 | 346,280,000 | 346,280,000 | 346,280,000 | 344,720,000 | 0 | 0 | 2021-03-08 | 2021-04-21 | 2021-05-07 | 02.049.336.7-606.000 | CV. Intishar Karya | 02.049.336.7-606.000 | CV. Intishar Karya | 3,719,100 | 1.06 % | Belum dinilai |
16 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembuatan Desain Pengembangan Daerah Irigasi Kintap Kecil Kecamatan Kintap | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3759172 | 27446692 | APBD | 249,999,200 | 249,935,800 | 247,390,000 | 247,390,000 | 247,390,000 | 246,415,000 | 0 | 0 | 2021-03-08 | 2021-04-21 | 2021-05-07 | 02.778.681.3-423.000 | PT. Gumilang Sajati | 02.778.681.3-423.000 | PT. Gumilang Sajati | 2,609,200 | 1.04 % | Belum dinilai |
17 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembuatan Dokumen Lingkungan Pengembangan Irigasi Desa Banua Raya Kecamatan Bati-Bati | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3760172 | 27547776 | APBD | 199,999,800 | 199,980,000 | 197,450,000 | 197,450,000 | 197,450,000 | 196,256,500 | 0 | 0 | 2021-03-08 | 2021-04-21 | 2021-05-07 | 01.534.559.8-731.000 | PT TECTAMA KARYA | 01.534.559.8-731.000 | PT TECTAMA KARYA | 2,549,800 | 1.27 % | Belum dinilai |
18 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembuatan Desain Bangunan Pelindung Pantai Desa Swarangan Kecamatan Jorong | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3767172 | 27444642 | APBD | 249,999,200 | 249,993,133 | 245,135,000 | 245,135,000 | 244,035,000 | 244,035,000 | 0 | 0 | 2021-03-16 | 2021-05-07 | 2021-06-03 | 02.778.681.3-423.000 | PT. Gumilang Sajati | 02.778.681.3-423.000 | PT. Gumilang Sajati | 4,864,200 | 1.95 % | Belum dinilai |
19 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembuatan Desain Konstruksi Embung Dusun Riam Pinang Desa Tanjung Kecamatan Bajuin | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3769172 | 27434729 | APBD | 299,999,700 | 299,910,866 | 295,020,000 | 295,020,000 | 293,920,000 | 293,920,000 | 0 | 0 | 2021-03-16 | 2021-05-07 | 2021-07-03 | 02.778.681.3-423.000 | PT. Gumilang Sajati | 02.778.681.3-423.000 | PT. Gumilang Sajati | 4,979,700 | 1.66 % | Belum dinilai |
20 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembuatan Desain Bangunan Pelindung Pantai Desa Takisung Kecamatan Takisung | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3770172 | 27444803 | APBD | 249,999,200 | 249,993,133 | 245,178,000 | 245,178,000 | 244,073,000 | 244,073,000 | 0 | 0 | 2021-03-16 | 2021-05-07 | 2021-06-03 | 92.804.430.4-424.000 | PT. EKUILAPATTRA ENJINEERING KONSULTAN | 92.804.430.4-424.000 | PT. EKUILAPATTRA ENJINEERING KONSULTAN | 4,821,200 | 1.93 % | Belum dinilai |
21 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembuatan SID Peningkatan Jaringan Irigasi Rawa Kandangan Baru Kecamatan Panyipatan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3771172 | 27446014 | APBD | 499,999,500 | 499,899,778 | 475,200,000 | 475,200,000 | 474,375,000 | 474,375,000 | 474,375,000 | 0 | 2021-03-16 | 2021-05-07 | 2021-06-03 | 02.049.336.7-606.000 | CV. Intishar Karya | 02.049.336.7-606.000 | CV. Intishar Karya | 24,799,500 | 4.96 % | Belum dinilai |
22 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Survey Investigasi dan Desain Bangunan Pelindung Pantai Desa Tabanio Kecamatan Takisung | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3772172 | 27444278 | APBD | 299,999,700 | 299,907,070 | 295,460,000 | 295,460,000 | 294,140,000 | 294,140,000 | 0 | 0 | 2021-03-16 | 2021-05-07 | 2021-06-03 | 02.043.129.2-731.000 | CV. GANESHA TEKNIK | 02.043.129.2-731.000 | CV. GANESHA TEKNIK | 4,539,700 | 1.51 % | Belum dinilai |
23 | 2021 | Dinas Kepemudaan dan Olah Raga | Pengadaan Pakaian Olahraga Untuk Kontingen POPDA | Tender Cepat | Jasa Lainnya | 3785172 | 28967509 | APBD | 255,835,800 | 255,835,800 | 217,800,000 | 217,800,000 | 217,800,000 | 217,800,000 | 100 | 0 | 2021-03-31 | 2021-04-05 | 2021-04-19 | 02.487.114.7-412.000 | PT. Pendopo Multi Karya | 02.487.114.7-412.000 | PT. Pendopo Multi Karya | 38,035,800 | 14.87 % | Belum dinilai |
24 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembangunan Jembatan Bawah Sawo Kec. Jorong | Tender | Pekerjaan Konstruksi | 3790172 | 27541340 | APBD | 3,484,444,390 | 3,484,255,250 | 3,387,741,032 | 3,387,741,032 | 3,385,431,000 | 3,385,431,000 | 0 | 0 | 2021-04-28 | 2021-05-20 | 2021-06-03 | 01.124.402.7-731.000 | PT. HASRAT JAYA UTAMA | 01.124.402.7-731.000 | PT. HASRAT JAYA UTAMA | 96,703,358 | 2.78 % | Belum dinilai |
25 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Modal Gedung Laboratorium Lingkungan | Tender | Pekerjaan Konstruksi | 3791172 | 28815553 | APBD | 645,150,000 | 642,056,829 | 513,437,103 | 513,437,103 | 513,437,103 | 513,437,103 | 0 | 0 | 2021-04-01 | 2021-04-16 | 2021-04-29 | 03.282.508.5-732.000 | cv.tata laksana konstruksi | 03.282.508.5-732.000 | cv.tata laksana konstruksi | 131,712,897 | 20.42 % | Belum dinilai |
26 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembangunan Jembatan Sumber Mulia - Tajau Pecah Kec. Pelaihari | Tender | Pekerjaan Konstruksi | 3792172 | 27541719 | APBD | 3,911,111,050 | 3,911,098,167 | 3,826,227,124 | 3,826,227,124 | 3,823,498,000 | 3,823,498,000 | 0 | 0 | 2021-04-28 | 2021-05-20 | 2021-06-04 | 01.124.402.7-731.000 | PT. HASRAT JAYA UTAMA | 01.124.402.7-731.000 | PT. HASRAT JAYA UTAMA | 84,883,926 | 2.17 % | Belum dinilai |
27 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Penggantian Jembatan Trans 300 Kec. Jorong | Tender | Pekerjaan Konstruksi | 3793172 | 27546486 | APBD | 2,986,666,620 | 2,986,628,688 | 2,924,113,638 | 2,924,113,638 | 2,924,113,638 | 2,924,113,638 | 0 | 0 | 2021-04-28 | 2021-05-20 | 2021-06-04 | 01.860.696.2-731.000 | PT. SALSABILA ONIRESH NUSANTARA | 01.860.696.2-731.000 | PT. SALSABILA ONIRESH NUSANTARA | 62,552,982 | 2.09 % | Belum dinilai |
28 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Rehabilitasi Jalan Maluka Baulin - Tabanio Kec. Kurau | Tender | Pekerjaan Konstruksi | 3794172 | 27569799 | APBD | 4,899,400,000 | 4,899,015,359 | 4,757,898,547 | 4,757,898,547 | 4,755,395 | 4,755,395 | 0 | 0 | 2021-04-28 | 2021-05-20 | 2021-06-03 | 01.141.578.3-732.000 | PT. SARANA DOA BERSAMA | 01.141.578.3-732.000 | PT. SARANA DOA BERSAMA | 141,501,453 | 2.89 % | Belum dinilai |
29 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Rekonstruksi/Peningkatan Struktur Jalan Kintap - Bukit Mulya (Ruas No. 56) | Tender | Pekerjaan Konstruksi | 3795172 | 28521727 | APBD | 9,648,472,505 | 9,646,571,876 | 9,495,120,704 | 9,495,120,704 | 9,491,839,000 | 9,491,839,000 | 0 | 0 | 2021-05-18 | 2021-06-04 | 2021-06-21 | 80.925.190.3-731.000 | PT. CENDANA PRIMA PERKASA | 80.925.190.3-731.000 | PT. CENDANA PRIMA PERKASA | 153,351,801 | 1.59 % | Belum dinilai |
30 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Rekonstruksi/Peningkatan Struktur Jalan Lingkungan Desa Sumber Jaya (Ruas No. 348) | Tender | Pekerjaan Konstruksi | 3797172 | 28521744 | APBD | 5,095,307,494 | 5,094,278,535 | 5,083,460,202 | 5,083,460,202 | 5,080,970,000 | 5,080,970,000 | 0 | 0 | 2021-05-18 | 2021-06-04 | 2021-06-22 | 75.099.887.4-732.000 | PT. RADHIKA UTAMA JAYA | 75.099.887.4-732.000 | PT. RADHIKA UTAMA JAYA | 11,847,292 | 0.23 % | Belum dinilai |
31 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Rehabilitasi Gedung Kantor StafKODIM 1009/PLH | Tender | Pekerjaan Konstruksi | 3801172 | 26948172 | APBD | 943,740,000 | 943,629,000 | 919,501,000 | 922,215,000 | 918,038,000 | 918,038,000 | 0 | 0 | 2021-04-26 | 2021-05-12 | 2021-05-28 | 72.078.255.6-731.000 | CV. RINKEI KHAL NUSANTARA | 72.078.255.6-731.000 | CV. RINKEI KHAL NUSANTARA | 24,239,000 | 2.57 % | Belum dinilai |
32 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembangunan Pos Penjagaan TNI AL Desa Tabanio Kab. Tanah Laut | Tender | Pekerjaan Konstruksi | 3802172 | 26948351 | APBD | 335,000,000 | 334,722,000 | 328,025,498 | 329,488,000 | 329,488,000 | 329,488,000 | 0 | 0 | 2021-04-26 | 2021-05-12 | 2021-05-28 | 01.961.550.9-732.000 | CV.WULAN | 01.961.550.9-732.000 | CV.WULAN | 6,974,502 | 2.08 % | Belum dinilai |
33 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembangunan Fasilitas Pelayanan WBP Rutan Kelas II B Pelaihari dan Rehabilitasi Rumah Dinas Kepala Rutan | Tender | Pekerjaan Konstruksi | 3803172 | 26948289 | APBD | 1,206,810,163 | 1,206,220,000 | 1,181,609,446 | 1,181,609,446 | 1,180,509,000 | 1,180,509,000 | 0 | 0 | 2021-04-26 | 2021-05-12 | 2021-05-28 | 66.157.544.9-732.000 | ANANDA NINA PRATAMA | 66.157.544.9-732.000 | ANANDA NINA PRATAMA | 25,200,717 | 2.09 % | Belum dinilai |
34 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembangunan Gedung Aula/ Alsintan Dinas Tanaman Pangan Holtikultura dan Perkebunan Kabupaten Tanah Laut | Tender | Pekerjaan Konstruksi | 3804172 | 26924070 | APBD | 1,016,400,000 | 1,016,380,000 | 997,041,841 | 997,110,000 | 995,730,000 | 995,730,000 | 0 | 0 | 2021-04-26 | 2021-05-12 | 2021-05-28 | 72.078.255.6-731.000 | CV. RINKEI KHAL NUSANTARA | 72.078.255.6-731.000 | CV. RINKEI KHAL NUSANTARA | 19,358,159 | 1.9 % | Belum dinilai |
35 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pelebaran Jalan Desa Sungai Bakar Rt.01 - Rt. 07 Kec. Bajuin | Tender | Pekerjaan Konstruksi | 3811172 | 27538692 | APBD | 898,640,000 | 898,265,244 | 887,800,410 | 887,800,410 | 887,800,410 | 887,800,410 | 887,800,410 | 0 | 2021-04-28 | 2021-05-20 | 2021-06-04 | 02.660.197.1-732.000 | CV. REPAI | 02.660.197.1-732.000 | CV. REPAI | 10,839,590 | 1.21 % | Belum dinilai |
36 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembangunan Jalan Desa Bati-Bati RT. 1 Kec. Bati-Bati | Tender | Pekerjaan Konstruksi | 3812172 | 27538830 | APBD | 494,760,000 | 494,197,358 | 488,603,590 | 488,603,590 | 488,603,590 | 488,603,590 | 488,603,590 | 0 | 2021-04-28 | 2021-05-20 | 2021-06-03 | 80.948.780.4-732.000 | CV.ANUGRAH JAYA PRATAMA | 80.948.780.4-732.000 | CV.ANUGRAH JAYA PRATAMA | 6,156,410 | 1.24 % | Belum dinilai |
37 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pengaspalan Jalan Desa Gunung Makmur Rt.01,03 Kec. Takisung | Tender | Pekerjaan Konstruksi | 3813172 | 27549218 | APBD | 608,880,000 | 608,113,197 | 601,654,548 | 601,654,548 | 601,654,548 | 601,654,548 | 601,654,548 | 0 | 2021-04-28 | 2021-05-20 | 2021-06-03 | 80.948.780.4-732.000 | CV.ANUGRAH JAYA PRATAMA | 80.948.780.4-732.000 | CV.ANUGRAH JAYA PRATAMA | 7,225,452 | 1.19 % | Belum dinilai |
38 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pengaspalan Jalan Desa Kintap Jl. Kasih Dangsanak Kec. Kintap | Tender | Pekerjaan Konstruksi | 3814172 | 27549753 | APBD | 599,400,000 | 599,390,131 | 580,629,764 | 580,629,764 | 580,629,764 | 580,629,764 | 0 | 0 | 2021-04-28 | 2021-05-21 | 2021-06-07 | 72.831.285.1-732.000 | CV. Anindya | 72.831.285.1-732.000 | CV. Anindya | 18,770,236 | 3.13 % | Belum dinilai |
39 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pengaspalan Jalan Desa Panggung Baru Jl. Keramat Kec. Pelaihari | Tender | Pekerjaan Konstruksi | 3815172 | 27550016 | APBD | 466,400,000 | 466,209,274 | 455,811,168 | 455,811,168 | 455,811,168 | 455,811,168 | 455,811,168 | 0 | 2021-04-28 | 2021-05-21 | 2021-06-04 | 31.683.055.3-732.000 | CV.RINALDI | 31.683.055.3-732.000 | CV.RINALDI | 10,588,832 | 2.27 % | Belum dinilai |
40 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pengaspalan Jalan Desa Tajau Mulya RT. 4 Kec. Batu Ampar | Tender | Pekerjaan Konstruksi | 3816172 | 27550596 | APBD | 399,200,000 | 398,271,868 | 393,033,381 | 393,033,381 | 392,715,000 | 392,715,000 | 0 | 0 | 2021-04-28 | 2021-05-21 | 2021-06-07 | 03.063.181.6-731.000 | CV. ARTA UTAMA | 03.063.181.6-731.000 | CV. ARTA UTAMA | 6,166,619 | 1.54 % | Belum dinilai |
41 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Jalan Desa Batu Ampar Rt. 3 Kec. Batu Ampar | Tender | Pekerjaan Konstruksi | 3817172 | 27569996 | APBD | 1,949,360,000 | 1,948,674,492 | 1,928,907,486 | 1,928,907,486 | 1,928,907,486 | 1,928,907,486 | 1,928,907,486 | 0 | 2021-04-28 | 2021-05-20 | 2021-06-04 | 02.709.161.0-732.000 | CV. DELTA UTAMA | 02.709.161.0-732.000 | CV. DELTA UTAMA | 20,452,514 | 1.05 % | Belum dinilai |
42 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembangunan Sarana dan Prasarana Infrastruktur di Lingkungan Asrama Polres Tanah Laut | Tender | Pekerjaan Konstruksi | 3818172 | 29099973 | APBD | 3,200,000,000 | 3,199,280,000 | 3,119,387,499 | 3,127,630,000 | 3,118,830,000 | 3,118,830,000 | 0 | 0 | 2021-04-29 | 2021-05-12 | 2021-06-04 | 02.215.595.6-732.000 | PT. CITRA MEGAH UTAMA | 02.215.595.6-732.000 | PT. CITRA MEGAH UTAMA | 80,612,501 | 2.52 % | Belum dinilai |
43 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Jalan Desa Kandangan Lama Kec. Panyipatan | Tender | Pekerjaan Konstruksi | 3819172 | 27570274 | APBD | 646,040,000 | 645,999,486 | 638,761,631 | 638,761,631 | 638,761,631 | 638,761,631 | 638,761,631 | 0 | 2021-04-28 | 2021-05-20 | 2021-06-03 | 75.004.987.6-732.000 | CV. 3R | 75.004.987.6-732.000 | CV. 3R | 7,278,369 | 1.13 % | Belum dinilai |
44 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Jalan Desa Ketapang Kec. Bajuin | Tender | Pekerjaan Konstruksi | 3820172 | 27598618 | APBD | 899,160,000 | 899,100,682 | 888,834,488 | 888,834,488 | 888,834,488 | 888,834,488 | 888,834,488 | 0 | 2021-04-28 | 2021-05-20 | 2021-06-03 | 81.299.631.2-732.000 | CV.RICKY PERDANA PERTAMA | 81.299.631.2-732.000 | CV.RICKY PERDANA PERTAMA | 10,325,512 | 1.15 % | Belum dinilai |
45 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Jalan Desa Liang Anggang Kec. Bati-Bati | Tender | Pekerjaan Konstruksi | 3821172 | 27598711 | APBD | 494,760,000 | 494,682,508 | 489,139,937 | 489,139,937 | 489,139,937 | 489,139,937 | 489,139,937 | 0 | 2021-04-28 | 2021-05-21 | 2021-06-04 | 81.299.631.2-732.000 | CV.RICKY PERDANA PERTAMA | 81.299.631.2-732.000 | CV.RICKY PERDANA PERTAMA | 5,620,063 | 1.14 % | Belum dinilai |
46 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Jalan Desa Tanjung Kec. Bajuin | Tender | Pekerjaan Konstruksi | 3822172 | 27619700 | APBD | 999,460,000 | 999,031,254 | 967,776,966 | 967,776,966 | 967,776,966 | 967,776,966 | 0 | 0 | 2021-04-28 | 2021-05-21 | 2021-06-04 | 01.124.716.0-731.000 | CV. DUA MAS | 01.124.716.0-731.000 | CV. DUA MAS | 31,683,034 | 3.17 % | Belum dinilai |
47 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Jalan Desa Ujung Kec. Bati-Bati | Tender | Pekerjaan Konstruksi | 3823172 | 27619785 | APBD | 494,760,000 | 494,256,839 | 488,507,594 | 488,507,594 | 488,507,594 | 488,507,594 | 488,507,594 | 0 | 2021-04-28 | 2021-05-21 | 2021-06-04 | 02.709.161.0-732.000 | CV. DELTA UTAMA | 02.709.161.0-732.000 | CV. DELTA UTAMA | 6,252,406 | 1.26 % | Belum dinilai |
48 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Jalan Dusun III Tembus Dusun IV Desa Tebing Siring Kec. Bajuin | Tender | Pekerjaan Konstruksi | 3824172 | 27619816 | APBD | 798,860,000 | 798,319,006 | 789,563,829 | 789,563,829 | 789,563,829 | 789,563,829 | 789,563,829 | 0 | 2021-04-28 | 2021-05-21 | 2021-06-04 | 31.683.055.3-732.000 | CV.RINALDI | 31.683.055.3-732.000 | CV.RINALDI | 9,296,171 | 1.16 % | Belum dinilai |
49 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Jalan Lingkungan Dusun I s.d IV Desa Bukit Mulya Kec. Kintap | Tender | Pekerjaan Konstruksi | 3825172 | 27620824 | APBD | 600,000,000 | 599,963,712 | 578,998,735 | 578,998,735 | 578,998,735 | 578,998,735 | 0 | 0 | 2021-04-28 | 2021-05-21 | 2021-06-07 | 66.157.544.9-732.000 | ANANDA NINA PRATAMA | 66.157.544.9-732.000 | ANANDA NINA PRATAMA | 21,001,265 | 3.5 % | Belum dinilai |
50 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Konsolidasi Konsultansi Pengawasan Rekonstruksi/Peningkatan Struktur Jalan Lingkungan Desa Sumber Jaya (Ruas No. 348) dan Konsultansi Pengawasan Rekonstruksi/Peningkatan Struktur Jalan Kintap - Bukit Mulya (Ruas Nomor 56) | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 3826172 | 29111169 | APBD | 200,000,000 | 199,977,800 | 196,391,360 | 196,391,360 | 196,336,360 | 196,336,360 | 196,336,360 | 0 | 2021-04-22 | 2021-06-02 | 2021-06-21 | 02.089.773.2-733.000 | PT. TECHNIKATAMA JASA KONSULTAN | 02.089.773.2-733.000 | PT. TECHNIKATAMA JASA KONSULTAN | 3,608,640 | 1.8 % | Belum dinilai |
51 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Rencana Pencegahan dan Peningkatan Kualitas Permukiman Kumuh Perkotaan (RP2KPKP) | Tender | Jasa Konsultansi Badan Usaha Non Konstruksi | 3828172 | 28186805 | APBD | 1,000,000,000 | 1,000,000,000 | 950,015,000 | 950,015,000 | 948,655,000 | 0 | 0 | 0 | 2021-04-12 | 2021-05-28 | 01.118.674.9-441.000 | PT. HEGAR DAYA | 49,985,000 | 5 % | Belum dinilai | |||
52 | 2021 | Dinas Pariwisata | Pembuatan Jembatan obyek wisata Mangrove Desa Tanjung Dewa | Tender | Pekerjaan Konstruksi | 3829172 | 27841585 | APBD | 577,699,999 | 577,452,899 | 574,034,571 | 574,034,571 | 573,429,000 | 0 | 0 | 0 | 2021-06-28 | 2021-07-14 | 72.657.370.2-732.000 | CV.KEMBAR UTAMA | 3,665,428 | 0.63 % | Belum dinilai | |||
53 | 2021 | Dinas Pariwisata | Pembangunan Menara pandang Destinasi Gunung Kayangan | Tender | Pekerjaan Konstruksi | 3830172 | 27840022 | APBD | 1,426,000,001 | 1,425,359,799 | 1,414,585,884 | 1,414,585,884 | 1,413,485,000 | 0 | 0 | 0 | 2021-06-28 | 2021-07-14 | 92.898.532.4-732.000 | cv.amarta berkarya jaya | 11,414,117 | 0.8 % | Belum dinilai | |||
54 | 2021 | Dinas Pariwisata | Pembangunan Food Court Destinasi AIr Terjun Bajuin | Tender | Pekerjaan Konstruksi | 3831172 | 27837105 | APBD | 369,600,000 | 369,329,938 | 364,401,450 | 364,401,450 | 364,401,450 | 0 | 0 | 0 | 2021-06-28 | 2021-07-14 | 76.853.698.9-732.000 | CV BERKAT USAHA MANDIRI | 5,198,550 | 1.41 % | Belum dinilai | |||
55 | 2021 | Dinas Kesehatan | Pembangunan Pustu Batilai | Tender | Pekerjaan Konstruksi | 3834172 | 28975723 | APBD | 368,445,000 | 366,741,504 | 362,867,689 | 362,867,689 | 362,867,689 | 362,867,689 | 0 | 0 | 2021-04-19 | 2021-05-04 | 2021-05-19 | 90.511.879.0-732.000 | CV. ULFAH | 90.511.879.0-732.000 | CV. ULFAH | 5,577,311 | 1.51 % | Belum dinilai |
56 | 2021 | Dinas Kesehatan | Pembangunan Poskesdes Tajau Pecah | Tender | Pekerjaan Konstruksi | 3835172 | 28975665 | APBD | 254,100,000 | 253,389,974 | 248,265,180 | 248,265,180 | 248,265,180 | 248,265,180 | 248,265,180 | 0 | 2021-04-19 | 2021-05-04 | 2021-05-19 | 03.169.385.6-734.000 | CV. ZABRINA PUTRI MANDIRI | 03.169.385.6-734.000 | CV. ZABRINA PUTRI MANDIRI | 5,834,820 | 2.3 % | Belum dinilai |
57 | 2021 | Dinas Kesehatan | Peningkatan Mutu Dinas Kesehatan | Tender | Pekerjaan Konstruksi | 3836172 | 28975848 | APBD | 670,824,000 | 667,909,028 | 657,950,519 | 657,950,519 | 657,950,519 | 657,950,519 | 328,975,260 | 0 | 2021-04-19 | 2021-05-04 | 2021-05-20 | 66.157.544.9-732.000 | ANANDA NINA PRATAMA | 66.157.544.9-732.000 | ANANDA NINA PRATAMA | 12,873,481 | 1.92 % | Belum dinilai |
58 | 2021 | Dinas Kesehatan | Pembangunan Aula Puskesmas Tambang Ulang | Tender | Pekerjaan Konstruksi | 3837172 | 28975796 | APBD | 498,036,000 | 496,054,544 | 490,259,270 | 490,259,270 | 490,259,270 | 490,259,270 | 490,259,270 | 0 | 2021-04-19 | 2021-05-04 | 2021-05-19 | 01.860.233.4-732.000 | KARYA ABADI | 01.860.233.4-732.000 | KARYA ABADI | 7,776,731 | 1.56 % | Belum dinilai |
59 | 2021 | Dinas Kesehatan | Pembangunan Pustu Bawah Layung | Tender | Pekerjaan Konstruksi | 3838172 | 28975697 | APBD | 368,445,000 | 366,775,843 | 359,393,736 | 359,393,736 | 359,393,736 | 359,393,736 | 179,696,868 | 0 | 2021-04-19 | 2021-05-04 | 2021-05-20 | 03.138.523.0-732.000 | CV.HBP(Haji Budi Pelaihari) | 03.138.523.0-732.000 | CV.HBP(Haji Budi Pelaihari) | 9,051,264 | 2.46 % | Belum dinilai |
60 | 2021 | Dinas Kesehatan | Pembangunan Poskesdes Pasir Putih | Tender | Pekerjaan Konstruksi | 3839172 | 28975630 | APBD | 254,100,000 | 252,583,424 | 247,254,469 | 247,639,400 | 247,639,400 | 247,639,400 | 247,254,469 | 0 | 2021-04-19 | 2021-05-04 | 2021-05-20 | 86.386.465.8-732.000 | CV MITRA USAHA SUKSES | 86.386.465.8-732.000 | CV MITRA USAHA SUKSES | 6,845,531 | 2.69 % | Belum dinilai |
61 | 2021 | Dinas Kesehatan | Pembangunan Aula Puskesmas Bumi Makmur | Tender | Pekerjaan Konstruksi | 3840172 | 28975779 | APBD | 406,560,000 | 405,697,761 | 401,513,328 | 401,513,328 | 400,135,543 | 400,135,543 | 400,135,543 | 0 | 2021-04-19 | 2021-05-04 | 2021-05-20 | 02.709.163.6-732.000 | KARYA DILLA ADITAMA | 02.709.163.6-732.000 | KARYA DILLA ADITAMA | 5,046,672 | 1.24 % | Belum dinilai |
62 | 2021 | Dinas Kesehatan | Konsolidasi Pembangunan Rumah Dinas Dokter RS KH Mansyur 1, RS KH Mansyur 2, dan RS KH Mansyur 3 | Tender | Pekerjaan Konstruksi | 3841172 | 28975571 | APBD | 1,067,220,000 | 1,062,451,790 | 1,032,351,760 | 1,032,351,760 | 1,031,345,000 | 1,031,345,000 | 0 | 0 | 2021-04-19 | 2021-05-04 | 2021-05-20 | 86.381.875.3-732.000 | CV MAJU KARYA BERSAMA | 86.381.875.3-732.000 | CV MAJU KARYA BERSAMA | 34,868,240 | 3.27 % | Belum dinilai |
63 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Rehabilitasi Jaringan Irigasi D.I. Banua Lawas Kecamatan Takisung | Tender | Pekerjaan Konstruksi | 3861172 | 29207584 | APBD | 1,299,999,958 | 1,299,725,000 | 1,273,009,067 | 1,273,009,067 | 1,273,009,067 | 1,273,009,067 | 1,272,129,000 | 0 | 2021-04-20 | 2021-05-19 | 2021-06-09 | 86.381.875.3-732.000 | CV MAJU KARYA BERSAMA | 86.381.875.3-732.000 | CV MAJU KARYA BERSAMA | 26,990,891 | 2.08 % | Belum dinilai |
64 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Rehabilitasi Jaringan Irigasi D.I. Sukaramah Kecamatan Panyipatan | Tender | Pekerjaan Konstruksi | 3866172 | 29207440 | APBD | 2,599,999,917 | 2,599,945,000 | 2,546,610,200 | 2,546,610,200 | 2,544,520,000 | 2,544,520,000 | 2,544,520,000 | 0 | 2021-04-20 | 2021-05-19 | 2021-06-03 | 95.691.082.2-732.000 | PT MANDIRI PERKASA PLANT | 95.691.082.2-732.000 | PT MANDIRI PERKASA PLANT | 53,389,717 | 2.05 % | Belum dinilai |
65 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Rehabilitasi Jaringan Irigasi D.I. Kunyit Kecamatan Bajuin (DAK) | Tender | Pekerjaan Konstruksi | 3867172 | 29207483 | APBD | 1,199,999,962 | 1,199,896,000 | 1,185,575,285 | 1,186,300,614 | 1,185,200,000 | 1,185,200,000 | 0 | 0 | 2021-04-20 | 2021-05-19 | 2021-06-04 | 90.480.522.3-732.000 | CV. IDZMA | 90.480.522.3-732.000 | CV. IDZMA | 14,424,677 | 1.2 % | Belum dinilai |
66 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Penambah Daya Tahan Tubuh | Tender | Jasa Lainnya | 3871172 | 28178203 | APBD | 904,365,000 | 674,696,000 | 673,117,500 | 673,117,500 | 671,990,000 | 671,990,000 | 671,990,000 | 0 | 2021-04-23 | 2021-05-06 | 2021-05-20 | 86.495.751.9-732.000 | CV. ZAINA MADINA | 86.495.751.9-732.000 | CV. ZAINA MADINA | 231,247,500 | 25.57 % | Belum dinilai |
67 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pengaspalan Jalan Poros Desa Mekarsari Jl. Pantai Love Sari RT. 05 Kec. Kintap | Tender | Pekerjaan Konstruksi | 3874172 | 27569700 | APBD | 599,400,000 | 598,863,943 | 588,991,957 | 588,991,957 | 588,410,000 | 588,410,000 | 0 | 0 | 2021-06-24 | 2021-07-14 | 2021-07-26 | 86.386.465.8-732.000 | CV MITRA USAHA SUKSES | 86.386.465.8-732.000 | CV MITRA USAHA SUKSES | 10,408,043 | 1.74 % | Belum dinilai |
68 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pengaspalan Jalan Poros Desa Sebamban Baru Kec. Kintap | Tender | Pekerjaan Konstruksi | 3875172 | 27569707 | APBD | 599,400,000 | 598,391,343 | 587,116,343 | 587,116,343 | 586,510,000 | 586,510,000 | 0 | 0 | 2021-06-24 | 2021-07-13 | 2021-07-26 | 90.695.223.9-732.000 | CV.AWI BATAKAN UTAMA | 90.695.223.9-732.000 | CV.AWI BATAKAN UTAMA | 12,283,657 | 2.05 % | Belum dinilai |
69 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Jalan Desa Kebun Raya Kec. Kintap | Tender | Pekerjaan Konstruksi | 3876172 | 27598533 | APBD | 600,000,000 | 599,883,561 | 590,831,575 | 590,831,575 | 590,237,000 | 590,237,000 | 0 | 0 | 2021-06-24 | 2021-07-14 | 2021-07-26 | 86.380.418.3-732.000 | CV BERSAMA KAWAN SEJAHTERA | 86.380.418.3-732.000 | CV BERSAMA KAWAN SEJAHTERA | 9,168,425 | 1.53 % | Belum dinilai |
70 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Jalan Desa Pandan Sari Kec. Kintap | Tender | Pekerjaan Konstruksi | 3877172 | 27619474 | APBD | 399,600,000 | 398,989,343 | 393,617,590 | 393,617,590 | 393,214,881 | 393,214,881 | 0 | 0 | 2021-06-24 | 2021-07-14 | 2021-07-26 | 86.380.418.3-732.000 | CV BERSAMA KAWAN SEJAHTERA | 86.380.418.3-732.000 | CV BERSAMA KAWAN SEJAHTERA | 5,982,410 | 1.5 % | Belum dinilai |
71 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Jalan Lingkungan Desa Sumber Jaya Dusun 1,2,3 Kec. Kintap | Tender | Pekerjaan Konstruksi | 3879172 | 27620657 | APBD | 600,000,000 | 599,909,942 | 595,867,442 | 595,867,442 | 595,308,205 | 595,308,205 | 0 | 0 | 2021-06-24 | 2021-07-14 | 2021-07-26 | 90.480.522.3-732.000 | CV. IDZMA | 90.480.522.3-732.000 | CV. IDZMA | 4,132,558 | 0.69 % | Belum dinilai |
72 | 2021 | Dinas Pariwisata | Pembangunan Dermaga di Destinasi Pantai Batakan Baru | Tender | Pekerjaan Konstruksi | 3880172 | 27841334 | APBD | 1,061,750,000 | 1,060,821,825 | 1,056,077,676 | 1,056,077,676 | 1,054,620,000 | 0 | 0 | 0 | 2021-06-28 | 2021-07-14 | 75.129.882.9-731.000 | PT. ARTA ANUGERAH ADHI PERKASA | 5,672,324 | 0.53 % | Belum dinilai | |||
73 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Penggantian Box Culvert Desa Ambungan RT. 05 Kec. Pelaihari | Tender | Pekerjaan Konstruksi | 3881172 | 27543121 | APBD | 466,666,667 | 466,017,492 | 461,303,992 | 461,303,992 | 460,858,000 | 460,858,000 | 0 | 0 | 2021-06-24 | 2021-07-14 | 2021-07-26 | 90.695.174.4-732.000 | CV.RAMA HARAPAN BUNDA | 90.695.174.4-732.000 | CV.RAMA HARAPAN BUNDA | 5,362,675 | 1.15 % | Belum dinilai |
74 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Penggantian Box Culvert Desa Galam RT 06 Kec. Bajuin | Tender | Pekerjaan Konstruksi | 3882172 | 27543810 | APBD | 300,000,000 | 299,973,353 | 296,335,198 | 296,335,198 | 295,862,000 | 295,862,000 | 0 | 0 | 2021-06-24 | 2021-07-14 | 2021-07-26 | 76.853.698.9-732.000 | CV BERKAT USAHA MANDIRI | 76.853.698.9-732.000 | CV BERKAT USAHA MANDIRI | 3,664,802 | 1.22 % | Belum dinilai |
75 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Penggantian Box Culvert Desa Gunung Mas RT. 7 Kec. Batu Ampar | Tender | Pekerjaan Konstruksi | 3883172 | 27544040 | APBD | 500,000,000 | 499,511,885 | 495,804,885 | 495,804,885 | 495,395,000 | 495,395,000 | 0 | 0 | 2021-06-24 | 2021-07-13 | 2021-07-26 | 90.511.879.0-732.000 | CV. ULFAH | 90.511.879.0-732.000 | CV. ULFAH | 4,195,115 | 0.84 % | Belum dinilai |
76 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Penggantian Box Culvert Desa Desa Padang RT.9 Kec. Bati-Bati | Tender | Pekerjaan Konstruksi | 3884172 | 27544452 | APBD | 233,333,333 | 233,255,924 | 226,123,608 | 226,123,608 | 225,874,000 | 225,874,000 | 0 | 0 | 2021-06-24 | 2021-07-13 | 2021-07-26 | 02.709.123.0-732.000 | CV. MEDIA MULTI MITRA | 02.709.123.0-732.000 | CV. MEDIA MULTI MITRA | 7,209,725 | 3.09 % | Belum dinilai |
77 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Penggantian Box Culvert Desa Pantai Linuh 2 Kec. Batu Ampar | Tender | Pekerjaan Konstruksi | 3885172 | 27544603 | APBD | 400,000,000 | 399,981,818 | 396,055,574 | 396,055,574 | 395,538,000 | 395,538,000 | 0 | 0 | 2021-06-24 | 2021-07-14 | 2021-07-26 | 86.381.875.3-732.000 | CV MAJU KARYA BERSAMA | 86.381.875.3-732.000 | CV MAJU KARYA BERSAMA | 3,944,426 | 0.99 % | Belum dinilai |
78 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Penggantian Box Culvert Desa Pemalongan RT.03 Kec. Bajuin | Tender | Pekerjaan Konstruksi | 3886172 | 27545162 | APBD | 500,000,000 | 499,455,477 | 494,950,977 | 494,950,977 | 494,574,000 | 494,574,000 | 0 | 0 | 2021-06-24 | 2021-07-13 | 2021-07-26 | 90.695.174.4-732.000 | CV.RAMA HARAPAN BUNDA | 90.695.174.4-732.000 | CV.RAMA HARAPAN BUNDA | 5,049,023 | 1.01 % | Belum dinilai |
79 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Penggantian Box Culvert Desa Sungai Bakau RT 2,3 Kec. Kurau | Tender | Pekerjaan Konstruksi | 3887172 | 27545827 | APBD | 300,000,000 | 299,984,103 | 296,082,213 | 296,082,213 | 295,790,000 | 295,790,000 | 0 | 0 | 2021-06-24 | 2021-07-14 | 2021-07-26 | 86.381.875.3-732.000 | CV MAJU KARYA BERSAMA | 86.381.875.3-732.000 | CV MAJU KARYA BERSAMA | 3,917,787 | 1.31 % | Belum dinilai |
80 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Penggantian Box Culvert Desa Tirtajaya Rt. 02 Kec. Bajuin | Tender | Pekerjaan Konstruksi | 3888172 | 27545924 | APBD | 500,000,000 | 499,603,564 | 495,440,064 | 495,440,064 | 494,287,000 | 494,287,000 | 0 | 0 | 2021-06-24 | 2021-07-13 | 2021-07-26 | 72.657.370.2-732.000 | CV.KEMBAR UTAMA | 72.657.370.2-732.000 | CV.KEMBAR UTAMA | 4,559,936 | 0.91 % | Belum dinilai |
81 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Penggantian Jembatan Desa Bumi Asih Kec. Panyipatan | Tender | Pekerjaan Konstruksi | 3890172 | 27546284 | APBD | 244,444,444 | 244,396,951 | 236,871,824 | 236,871,824 | 236,143,000 | 236,143,000 | 0 | 0 | 2021-06-24 | 2021-07-13 | 2021-07-26 | 02.709.123.0-732.000 | CV. MEDIA MULTI MITRA | 02.709.123.0-732.000 | CV. MEDIA MULTI MITRA | 7,572,620 | 3.1 % | Belum dinilai |
82 | 2021 | Dinas Kesehatan | Penambahan Gedung Puskesmas Tirta Jaya (DAK) | Tender | Pekerjaan Konstruksi | 3891172 | 29250764 | APBD | 3,351,199,998 | 3,341,550,218 | 3,324,388,321 | 3,324,388,321 | 3,321,473,000 | 3,321,473,000 | 0 | 0 | 2021-05-06 | 2021-05-26 | 2021-06-10 | 02.614.268.7-731.000 | PT. KENCANA MURNI KARYA MANDIRI | 02.614.268.7-731.000 | PT. KENCANA MURNI KARYA MANDIRI | 26,811,677 | 0.8 % | Belum dinilai |
83 | 2021 | Dinas Kesehatan | Penambahan Gedung Puskesmas Tanjung Habulu (DAK) | Tender | Pekerjaan Konstruksi | 3892172 | 29247295 | APBD | 3,280,499,998 | 3,270,295,526 | 3,248,549,602 | 3,248,549,602 | 3,245,635,000 | 3,245,635,000 | 3,245,635,000 | 0 | 2021-05-06 | 2021-05-26 | 2021-06-08 | 02.707.565.4-322.000 | PT ASRI FARIZ JAYA | 02.707.565.4-322.000 | PT ASRI FARIZ JAYA | 31,950,396 | 0.97 % | Belum dinilai |
84 | 2021 | Dinas Kesehatan | Penambahan Gedung Puskesmas Pelaihari (DAK) | Tender | Pekerjaan Konstruksi | 3893172 | 29247127 | APBD | 2,321,399,996 | 2,314,810,783 | 2,300,110,421 | 2,300,110,421 | 2,298,110,000 | 2,298,110,000 | 0 | 0 | 2021-05-06 | 2021-05-26 | 2021-06-10 | 72.509.231.6-732.000 | cv.shafira | 72.509.231.6-732.000 | cv.shafira | 21,289,575 | 0.92 % | Belum dinilai |
85 | 2021 | Dinas Kesehatan | Penambahan Gedung Puskesmas Sungai Riam (DAK) | Tender | Pekerjaan Konstruksi | 3894172 | 29247241 | APBD | 3,052,084,099 | 3,042,139,844 | 3,006,950,145 | 3,006,950,145 | 3,004,917,000 | 3,004,917,000 | 3,004,917,000 | 0 | 2021-05-06 | 2021-05-26 | 2021-06-10 | 95.691.082.2-732.000 | PT MANDIRI PERKASA PLANT | 95.691.082.2-732.000 | PT MANDIRI PERKASA PLANT | 45,133,954 | 1.48 % | Belum dinilai |
86 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembuatan Siring Pengaman Sungai Desa Banyu Irang Kecamatan Bati-Bati | Tender | Pekerjaan Konstruksi | 3895172 | 27447510 | APBD | 2,999,999,200 | 2,999,998,329 | 2,948,491,781 | 2,948,491,781 | 2,945,191,000 | 2,945,191,000 | 2,945,191,000 | 0 | 2021-05-04 | 2021-05-19 | 2021-06-03 | 02.613.936.0-731.000 | CITRA INTAN KURNIA,PT | 02.613.936.0-731.000 | CITRA INTAN KURNIA,PT | 51,507,419 | 1.72 % | Belum dinilai |
87 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembuatan Siring Pengaman Sungai Desa Kintap Kecil RT. 10 Kecamatan Kintap | Tender | Pekerjaan Konstruksi | 3896172 | 27450341 | APBD | 517,799,938 | 517,712,000 | 515,890,223 | 515,890,223 | 515,890,223 | 515,890,223 | 515,340,000 | 0 | 2021-05-04 | 2021-05-19 | 2021-06-04 | 90.692.105.1-732.000 | CV. DEWI BANJAR MULIA | 90.692.105.1-732.000 | CV. DEWI BANJAR MULIA | 1,909,715 | 0.37 % | Belum dinilai |
88 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembangunan Pintu Air dan Siring Jalan Usaha Tani Desa Tabanio Kecamatan Takisung | Tender | Pekerjaan Konstruksi | 3898172 | 27456580 | APBD | 483,749,985 | 483,692,020 | 476,414,715 | 476,124,715 | 476,124,715 | 476,124,715 | 475,684,000 | 0 | 2021-05-04 | 2021-05-19 | 2021-06-03 | 01.961.550.9-732.000 | CV.WULAN | 01.961.550.9-732.000 | CV.WULAN | 7,335,270 | 1.52 % | Belum dinilai |
89 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Rehabilitasi Embung dan Jaringan Irigasi Desa Damit Hulu Kecamatan Batu Ampar | Tender | Pekerjaan Konstruksi | 3901172 | 29323563 | APBD | 1,303,099,987 | 1,303,015,000 | 1,294,238,412 | 1,294,111,000 | 1,292,942,000 | 1,292,942,000 | 0 | 0 | 2021-05-04 | 2021-05-19 | 2021-06-04 | 73.754.137.5-732.000 | cv.shofia | 73.754.137.5-732.000 | cv.shofia | 8,861,575 | 0.68 % | Belum dinilai |
90 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pengaspalan Jalan Desa Batu Mulya RT 01,02 Kec. Panyipatan | Tender | Pekerjaan Konstruksi | 3902172 | 27548897 | APBD | 499,800,000 | 499,158,426 | 492,787,127 | 492,787,127 | 492,787,127 | 492,787,127 | 492,787,127 | 0 | 2021-06-24 | 2021-07-14 | 2021-07-26 | 01.214.327.7-732.000 | CV. YUDHI JASA | 01.214.327.7-732.000 | CV. YUDHI JASA | 7,012,873 | 1.4 % | Belum dinilai |
91 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pengaspalan Jalan Desa Bentok Darat Kec. Bati-Bati | Tender | Pekerjaan Konstruksi | 3903172 | 27548958 | APBD | 494,760,000 | 494,682,508 | 488,454,933 | 488,454,933 | 488,454,933 | 488,454,933 | 0 | 0 | 2021-06-24 | 2021-07-14 | 2021-07-23 | 80.781.659.0-732.000 | CV.Aimikha Jaya Group | 80.781.659.0-732.000 | CV.Aimikha Jaya Group | 6,305,067 | 1.27 % | Belum dinilai |
92 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pengaspalan Jalan Desa Benua Lawas Rt. 02, 07 Kec. Takisung | Tender | Pekerjaan Konstruksi | 3904172 | 27549019 | APBD | 606,400,000 | 605,961,062 | 602,342,062 | 602,342,062 | 601,590,000 | 601,590,000 | 0 | 0 | 2021-06-24 | 2021-07-13 | 2021-07-26 | 90.698.494.3-732.000 | CV.SADEAS REJEKI INTI | 90.698.494.3-732.000 | CV.SADEAS REJEKI INTI | 4,057,938 | 0.67 % | Belum dinilai |
93 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pengaspalan Jalan Desa Bumi Jaya RT. 3,5 dan 6 Kec. Pelaihari | Tender | Pekerjaan Konstruksi | 3905172 | 27549097 | APBD | 466,940,000 | 466,209,274 | 460,142,774 | 460,142,774 | 459,691,000 | 459,691,000 | 0 | 0 | 2021-06-24 | 2021-07-14 | 2021-07-26 | 72.657.370.2-732.000 | CV.KEMBAR UTAMA | 72.657.370.2-732.000 | CV.KEMBAR UTAMA | 6,797,227 | 1.46 % | Belum dinilai |
94 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pengaspalan Jalan Desa Damar Lima RT. 7 dan 8 Kec. Batu Ampar | Tender | Pekerjaan Konstruksi | 3906172 | 27549154 | APBD | 699,200,000 | 698,607,409 | 697,295,902 | 697,295,902 | 696,500,000 | 696,500,000 | 0 | 0 | 2021-06-24 | 2021-07-14 | 2021-07-26 | 80.756.975.1-732.000 | CV.HUZAIMAH RAYA SEMESTA | 80.756.975.1-732.000 | CV.HUZAIMAH RAYA SEMESTA | 1,904,098 | 0.27 % | Belum dinilai |
95 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pengaspalan Jalan Desa Handil Gayam RT.005 dan RT.006 Kec. Bumi Makmur | Tender | Pekerjaan Konstruksi | 3907172 | 27549288 | APBD | 299,600,000 | 298,853,617 | 295,356,999 | 295,356,999 | 295,000,000 | 295,000,000 | 0 | 0 | 2021-06-24 | 2021-07-14 | 2021-07-26 | 93.927.191.2-731.000 | CV.HASRAT MULIA HABIBI | 93.927.191.2-731.000 | CV.HASRAT MULIA HABIBI | 4,243,001 | 1.42 % | Belum dinilai |
96 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pengaspalan Jalan Desa Jilatan RT. 5 Kec. Batu Ampar | Tender | Pekerjaan Konstruksi | 3908172 | 27549357 | APBD | 248,980,000 | 248,087,345 | 244,346,279 | 244,346,279 | 244,000,000 | 244,000,000 | 0 | 0 | 2021-06-24 | 2021-07-14 | 2021-07-26 | 86.386.465.8-732.000 | CV MITRA USAHA SUKSES | 86.386.465.8-732.000 | CV MITRA USAHA SUKSES | 4,633,721 | 1.86 % | Belum dinilai |
97 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pengaspalan Jalan Desa Kait-Kait Baru Kec. Bati-Bati | Tender | Pekerjaan Konstruksi | 3909172 | 27549431 | APBD | 494,760,000 | 494,682,508 | 493,203,729 | 493,203,729 | 492,700,000 | 492,700,000 | 0 | 0 | 2021-06-24 | 2021-07-14 | 2021-07-26 | 02.823.343.5-732.000 | CV AHMAD MUHAMMAD | 02.823.343.5-732.000 | CV AHMAD MUHAMMAD | 1,556,271 | 0.31 % | Belum dinilai |
98 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pengaspalan Jalan Desa Kampung Baru RT. 2 Kec. Pelaihari | Tender | Pekerjaan Konstruksi | 3910172 | 27549539 | APBD | 466,400,000 | 466,209,274 | 460,329,774 | 460,329,774 | 459,864,000 | 459,864,000 | 0 | 0 | 2021-06-24 | 2021-07-14 | 2021-07-26 | 82.839.397.5-732.000 | CV. ASSYA | 82.839.397.5-732.000 | CV. ASSYA | 6,070,227 | 1.3 % | Belum dinilai |
99 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pengaspalan Jalan Desa Kayu Abang RT.05 - 06 Kec. Tambang Ulang | Tender | Pekerjaan Konstruksi | 3911172 | 27549598 | APBD | 398,840,000 | 398,367,591 | 393,951,091 | 393,951,091 | 393,567,000 | 393,567,000 | 0 | 0 | 2021-06-24 | 2021-07-13 | 2021-07-26 | 02.172.423.2-732.000 | CV. REVIAMI | 02.172.423.2-732.000 | CV. REVIAMI | 4,888,909 | 1.23 % | Belum dinilai |
100 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembangunan Pedestrian/ Jalur Pejalan Kaki Pada Ruas Jalan KH. Mansyur Kota Pelaihari | Tender | Pekerjaan Konstruksi | 3912172 | 28843193 | APBD | 2,791,800,000 | 2,791,780,000 | 2,758,016,482 | 2,758,016,482 | 2,758,016,482 | 2,758,016,482 | 2,758,016,482 | 0 | 2021-05-17 | 2021-06-03 | 2021-06-15 | 01.141.578.3-732.000 | PT. SARANA DOA BERSAMA | 01.141.578.3-732.000 | PT. SARANA DOA BERSAMA | 33,783,518 | 1.21 % | Belum dinilai |
101 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pengaspalan Jalan Desa Pandahan Kec. Bati-Bati | Tender | Pekerjaan Konstruksi | 3913172 | 27549946 | APBD | 494,760,000 | 494,577,290 | 489,063,658 | 489,063,658 | 489,063,658 | 489,063,658 | 489,063,658 | 0 | 2021-06-24 | 2021-07-13 | 2021-07-23 | 76.708.451.0-732.000 | CV Berkah Terang Rahmat | 76.708.451.0-732.000 | CV Berkah Terang Rahmat | 5,696,342 | 1.15 % | Belum dinilai |
102 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pengaspalan Jalan Desa Panyipatan Kec. Panyipatan | Tender | Pekerjaan Konstruksi | 3914172 | 27550093 | APBD | 475,440,000 | 474,709,852 | 465,370,815 | 465,370,815 | 464,435,000 | 464,435,000 | 0 | 0 | 2021-06-24 | 2021-07-14 | 2021-07-23 | 02.521.809.0-732.000 | cv. andhika karya | 02.521.809.0-732.000 | cv. andhika karya | 10,069,185 | 2.12 % | Belum dinilai |
103 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pengaspalan Jalan Desa Simpang Empat Sungai Baru RT. 10 Kec. Jorong | Tender | Pekerjaan Konstruksi | 3915172 | 27550154 | APBD | 397,600,000 | 397,596,471 | 391,232,907 | 391,232,907 | 390,899,000 | 390,899,000 | 0 | 0 | 2021-06-24 | 2021-07-14 | 2021-07-26 | 86.381.875.3-732.000 | CV MAJU KARYA BERSAMA | 86.381.875.3-732.000 | CV MAJU KARYA BERSAMA | 6,367,094 | 1.6 % | Belum dinilai |
104 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pengaspalan Jalan Desa Srikandi RT 3 ke RT 1 Kec. Kurau | Tender | Pekerjaan Konstruksi | 3916172 | 27550259 | APBD | 699,540,000 | 699,227,007 | 685,971,187 | 685,971,187 | 685,277,000 | 685,277,000 | 0 | 0 | 2021-06-24 | 2021-07-13 | 2021-07-28 | 66.157.544.9-732.000 | ANANDA NINA PRATAMA | 66.157.544.9-732.000 | ANANDA NINA PRATAMA | 13,568,813 | 1.94 % | Belum dinilai |
105 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pengaspalan Jalan Desa Sumber Makmur Rt. 14 Kec. Takisung | Tender | Pekerjaan Konstruksi | 3917172 | 27550327 | APBD | 499,140,000 | 498,851,879 | 495,672,879 | 495,672,879 | 495,125,000 | 495,125,000 | 0 | 0 | 2021-06-24 | 2021-07-13 | 2021-07-26 | 90.506.445.7-732.000 | CV. AZIZA | 90.506.445.7-732.000 | CV. AZIZA | 3,467,122 | 0.69 % | Belum dinilai |
106 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pengaspalan Jalan Desa Telaga Langsat RT. 01 Kec. Takisung | Tender | Pekerjaan Konstruksi | 3918172 | 27550925 | APBD | 500,320,000 | 499,670,486 | 489,740,535 | 489,740,535 | 489,139,000 | 489,139,000 | 0 | 0 | 2021-06-24 | 2021-07-14 | 2021-07-23 | 72.831.285.1-732.000 | CV. Anindya | 72.831.285.1-732.000 | CV. Anindya | 10,579,465 | 2.11 % | Belum dinilai |
107 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pengaspalan Jalan Desa Telaga RT. 3 Kec. Pelaihari | Tender | Pekerjaan Konstruksi | 3919172 | 27551023 | APBD | 466,400,000 | 466,209,274 | 457,155,852 | 457,155,852 | 456,660,000 | 456,660,000 | 0 | 0 | 2021-06-24 | 2021-07-14 | 2021-07-23 | 72.831.285.1-732.000 | CV. Anindya | 72.831.285.1-732.000 | CV. Anindya | 9,244,148 | 1.98 % | Belum dinilai |
108 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pengaspalan Jalan Dusun 1 Desa Kuala Tambangan Kec. Takisung | Tender | Pekerjaan Konstruksi | 3920172 | 27551257 | APBD | 607,200,000 | 605,810,080 | 604,733,171 | 604,733,171 | 604,127,000 | 604,127,000 | 604,127,000 | 0 | 2021-06-24 | 2021-07-14 | 2021-07-26 | 92.898.532.4-732.000 | cv.amarta berkarya jaya | 92.898.532.4-732.000 | cv.amarta berkarya jaya | 2,466,829 | 0.41 % | Belum dinilai |
109 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pengaspalan Jalan Kabupaten Desa Benua Tengah RT 8 dan RT. 13 Kec. Takisung | Tender | Pekerjaan Konstruksi | 3921172 | 27551430 | APBD | 606,520,000 | 605,579,497 | 597,149,078 | 597,149,078 | 596,553,000 | 596,553,000 | 0 | 0 | 2021-06-24 | 2021-07-14 | 2021-07-26 | 86.386.465.8-732.000 | CV MITRA USAHA SUKSES | 86.386.465.8-732.000 | CV MITRA USAHA SUKSES | 9,370,922 | 1.55 % | Belum dinilai |
110 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pengaspalan Jalan Komplek CIP RT. 7 & 10 Kec. Pelaihari | Tender | Pekerjaan Konstruksi | 3922172 | 27552756 | APBD | 466,940,000 | 466,844,151 | 461,233,368 | 461,233,368 | 461,233,368 | 461,233,368 | 461,233,368 | 0 | 2021-06-24 | 2021-07-14 | 2021-07-23 | 01.961.550.9-732.000 | CV.WULAN | 01.961.550.9-732.000 | CV.WULAN | 5,706,632 | 1.22 % | Belum dinilai |
111 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pengaspalan Jalan Padang Panjang RT. 002 Desa Takisung Kec. Takisung | Tender | Pekerjaan Konstruksi | 3924172 | 27569665 | APBD | 446,040,000 | 445,950,085 | 437,341,383 | 437,341,383 | 436,814,000 | 436,814,000 | 0 | 0 | 2021-06-24 | 2021-07-13 | 2021-07-23 | 02.521.809.0-732.000 | cv. andhika karya | 02.521.809.0-732.000 | cv. andhika karya | 8,698,617 | 1.95 % | Belum dinilai |
112 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pengaspalan Jalan Poros Desa Asri Mulya Dusun I & II Kec. Jorong | Tender | Pekerjaan Konstruksi | 3925172 | 27569678 | APBD | 1,449,000,000 | 1,448,665,203 | 1,426,243,192 | 1,426,243,192 | 1,424,847,000 | 1,424,847,000 | 0 | 0 | 2021-06-24 | 2021-07-14 | 2021-07-26 | 86.380.418.3-732.000 | CV BERSAMA KAWAN SEJAHTERA | 86.380.418.3-732.000 | CV BERSAMA KAWAN SEJAHTERA | 22,756,808 | 1.57 % | Belum dinilai |
113 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pengaspalan Jalan Poros Desa Bajuin - Desa Sei. Bakar Kec. Bajuin | Tender | Pekerjaan Konstruksi | 3926172 | 27569688 | APBD | 899,160,000 | 898,524,661 | 887,052,579 | 887,052,579 | 887,052,579 | 887,052,579 | 887,052,579 | 0 | 2021-06-24 | 2021-07-14 | 2021-07-23 | 31.683.055.3-732.000 | CV.RINALDI | 31.683.055.3-732.000 | CV.RINALDI | 12,107,421 | 1.35 % | Belum dinilai |
114 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Rehabilitasi Jalan Desa Damit RT 8, 10, 12 Kec. Batu Ampar | Tender | Pekerjaan Konstruksi | 3927172 | 27569785 | APBD | 649,000,000 | 648,177,048 | 640,275,940 | 640,275,940 | 640,275,940 | 640,275,940 | 640,275,940 | 0 | 2021-06-24 | 2021-07-13 | 2021-07-23 | 76.708.451.0-732.000 | CV Berkah Terang Rahmat | 76.708.451.0-732.000 | CV Berkah Terang Rahmat | 8,724,060 | 1.34 % | Belum dinilai |
115 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembangunan Gerbang Taman Pintu Masuk Jl. Almanar | Tender | Pekerjaan Konstruksi | 3928172 | 28244010 | APBD | 990,000,000 | 989,930,000 | 978,008,430 | 978,008,430 | 978,008,430 | 978,008,430 | 978,008,430 | 0 | 2021-05-17 | 2021-06-03 | 2021-06-15 | 73.095.234.8-732.000 | CV.TIRTA GLOBAL TRISAKTI | 73.095.234.8-732.000 | CV.TIRTA GLOBAL TRISAKTI | 11,991,570 | 1.21 % | Belum dinilai |
116 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Belanja Jasa Pelaksanaan GCP dan Pembuatan Data dan Peta Dasar Kecamatan Tambang Ulang | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 3929172 | 28306808 | APBD | 247,500,000 | 247,105,100 | 222,336,400 | 222,336,400 | 222,181,000 | 0 | 0 | 0 | 2021-05-04 | 2021-06-17 | 02.390.537.5-429.000 | PT. PADURAKSA KONSULTAN | 25,163,600 | 10.17 % | Belum dinilai | |||
117 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Belanja Jasa Pelaksanaan GCP dan Pembuatan Data dan Peta Dasar Kecamatan Penyipatan | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 3930172 | 28256374 | APBD | 247,500,000 | 247,105,100 | 222,336,400 | 222,336,400 | 222,181,000 | 0 | 0 | 0 | 2021-05-04 | 2021-06-17 | 02.390.537.5-429.000 | PT. PADURAKSA KONSULTAN | 25,163,600 | 10.17 % | Belum dinilai | |||
118 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Rehabilitasi Jaringan Irigasi D.I.R. Padang Luas Kecamatan Kurau | Tender | Pekerjaan Konstruksi | 3933172 | 29207660 | APBD | 1,172,499,472 | 1,172,440,000 | 1,148,887,293 | 1,148,887,293 | 1,148,887,293 | 1,148,887,293 | 1,147,540,000 | 0 | 2021-05-04 | 2021-05-19 | 2021-06-04 | 01.124.716.0-731.000 | CV. DUA MAS | 01.124.716.0-731.000 | CV. DUA MAS | 23,612,179 | 2.01 % | Belum dinilai |
119 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Rehabilitasi Jaringan Irigasi D.I.R. Panjaratan Kecamatan Pelaihari | Tender | Pekerjaan Konstruksi | 3934172 | 29207834 | APBD | 1,849,999,941 | 1,849,963,000 | 1,813,027,625 | 1,813,027,625 | 1,811,143,000 | 1,811,143,000 | 0 | 0 | 2021-05-04 | 2021-05-19 | 2021-06-03 | 81.299.631.2-732.000 | CV.RICKY PERDANA PERTAMA | 81.299.631.2-732.000 | CV.RICKY PERDANA PERTAMA | 36,972,316 | 2 % | Belum dinilai |
120 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Alat/Bahan untuk Kegiatan Kantor-Alat Listrik | Tender | Pengadaan Barang | 3935172 | 28711619 | APBD | 1,160,482,660 | 923,515,879 | 916,352,250 | 916,352,250 | 916,352,250 | 916,352,250 | 0 | 0 | 2021-05-28 | 2021-06-15 | 2021-06-30 | 03.266.001.1-731.000 | CV. JASA TECHNIC | 03.266.001.1-731.000 | CV. JASA TECHNIC | 244,130,410 | 21.04 % | Belum dinilai |
121 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembangunan Jalan Alternative Kurau Utara - Bumi Harapan (Lanjutan) Rt. 008 Desa Kurau Utara Kec. Kurau | Tender | Pekerjaan Konstruksi | 3936172 | 27538780 | APBD | 452,120,051 | 451,666,534 | 447,970,534 | 447,970,534 | 447,516,000 | 447,516,000 | 0 | 0 | 2021-07-08 | 2021-07-27 | 2021-08-06 | 80.652.777.6-732.000 | cv astra bina | 80.652.777.6-732.000 | cv astra bina | 4,149,517 | 0.92 % | Belum dinilai |
122 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembangunan Siring dan Bahu Jalan Poros Desa Gunung Melati Kec. Batu Ampar | Tender | Pekerjaan Konstruksi | 3937172 | 27539164 | APBD | 698,500,000 | 698,121,561 | 693,456,716 | 693,456,716 | 692,895,000 | 692,895,000 | 0 | 0 | 2021-07-08 | 2021-07-28 | 2021-08-04 | 90.480.522.3-732.000 | CV. IDZMA | 90.480.522.3-732.000 | CV. IDZMA | 5,043,284 | 0.72 % | Belum dinilai |
123 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembangunan Siring Jalan Desa Kuringkit Kec. Panyipatan | Tender | Pekerjaan Konstruksi | 3938172 | 27539212 | APBD | 646,350,000 | 646,236,581 | 641,710,224 | 641,710,224 | 641,124,000 | 641,124,000 | 0 | 0 | 2021-07-08 | 2021-07-27 | 2021-08-04 | 90.695.174.4-732.000 | CV.RAMA HARAPAN BUNDA | 90.695.174.4-732.000 | CV.RAMA HARAPAN BUNDA | 4,639,776 | 0.72 % | Belum dinilai |
124 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembangunan Siring Jalan Desa Panjaratan RT 1 Kec. Pelaihari | Tender | Pekerjaan Konstruksi | 3939172 | 27539263 | APBD | 467,500,000 | 467,188,784 | 464,675,284 | 464,675,284 | 463,647,000 | 463,647,000 | 0 | 0 | 2021-07-08 | 2021-07-27 | 2021-08-04 | 73.754.137.5-732.000 | cv.shofia | 73.754.137.5-732.000 | cv.shofia | 2,824,716 | 0.6 % | Belum dinilai |
125 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembangunan Siring Jalan Desa Pemuda RT. 01 s.d. 09 Kec. Pelaihari | Tender | Pekerjaan Konstruksi | 3940172 | 27539301 | APBD | 467,500,000 | 467,453,313 | 462,463,173 | 462,463,173 | 462,463,173 | 462,463,173 | 462,463,173 | 0 | 2021-07-08 | 2021-07-28 | 2021-08-04 | 01.961.550.9-732.000 | CV.WULAN | 01.961.550.9-732.000 | CV.WULAN | 5,036,827 | 1.08 % | Belum dinilai |
126 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembangunan Siring Jalan Kabupaten Rt. 16 Desa Sukaramah Kec. Panyipatan | Tender | Pekerjaan Konstruksi | 3941172 | 27539392 | APBD | 348,890,000 | 348,638,031 | 346,674,531 | 346,674,531 | 345,940,000 | 345,940,000 | 0 | 0 | 2021-07-08 | 2021-07-27 | 2021-08-04 | 90.506.445.7-732.000 | CV. AZIZA | 90.506.445.7-732.000 | CV. AZIZA | 2,215,469 | 0.64 % | Belum dinilai |
127 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembangunan Siring Jalan Lingkungan Desa Asam-Asam RT. 11 Kec. Jorong | Tender | Pekerjaan Konstruksi | 3942172 | 27539435 | APBD | 298,800,000 | 298,655,789 | 296,329,289 | 296,329,289 | 296,048,000 | 296,048,000 | 0 | 0 | 2021-07-08 | 2021-07-28 | 2021-08-04 | 90.692.105.1-732.000 | CV. DEWI BANJAR MULIA | 90.692.105.1-732.000 | CV. DEWI BANJAR MULIA | 2,470,711 | 0.83 % | Belum dinilai |
128 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembangunan Siring Jalan Poros Trans Ujung Batu RT. 7 Kec. Pelaihari | Tender | Pekerjaan Konstruksi | 3943172 | 27539652 | APBD | 279,400,000 | 279,188,997 | 277,252,997 | 277,252,997 | 276,977,000 | 276,977,000 | 0 | 0 | 2021-07-08 | 2021-07-28 | 2021-08-04 | 90.698.494.3-732.000 | CV.SADEAS REJEKI INTI | 90.698.494.3-732.000 | CV.SADEAS REJEKI INTI | 2,147,003 | 0.77 % | Belum dinilai |
129 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembuatan Siring Jalan Desa Sumber Makmur Dusun 1, 2, dan 3 Kec. Takisung | Tender | Pekerjaan Konstruksi | 3944172 | 27539821 | APBD | 605,790,000 | 605,787,939 | 603,290,938 | 603,290,938 | 602,685,000 | 602,685,000 | 0 | 0 | 2021-07-08 | 2021-07-28 | 2021-08-04 | 82.839.397.5-732.000 | CV. ASSYA | 82.839.397.5-732.000 | CV. ASSYA | 2,499,062 | 0.41 % | Belum dinilai |
130 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Perkerasan Jalan Desa Handil Birayang Atas RT.002 Kec. Bumi Makmur | Tender | Pekerjaan Konstruksi | 3945172 | 27540480 | APBD | 299,450,000 | 299,397,558 | 294,040,629 | 294,040,629 | 293,749,000 | 293,749,000 | 0 | 0 | 2021-07-08 | 2021-07-28 | 2021-08-05 | 02.823.343.5-732.000 | CV AHMAD MUHAMMAD | 02.823.343.5-732.000 | CV AHMAD MUHAMMAD | 5,409,371 | 1.81 % | Belum dinilai |
131 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Perkerasan Jalan Desa Sabuhur RT.22 Kec. Jorong | Tender | Pekerjaan Konstruksi | 3946172 | 27540610 | APBD | 349,800,000 | 349,578,723 | 347,125,723 | 347,125,723 | 346,484,000 | 346,484,000 | 0 | 0 | 2021-07-08 | 2021-07-27 | 2021-08-04 | 73.754.137.5-732.000 | cv.shofia | 73.754.137.5-732.000 | cv.shofia | 2,674,277 | 0.76 % | Belum dinilai |
132 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Perkerasan Jalan Sumber Mulia Kec. Pelaihari | Tender | Pekerjaan Konstruksi | 3947172 | 27540719 | APBD | 499,950,000 | 499,729,121 | 490,868,220 | 490,868,220 | 490,868,220 | 490,868,220 | 0 | 0 | 2021-07-08 | 2021-07-28 | 2021-08-05 | 02.590.868.2-732.000 | CV.TAJMILA | 02.590.868.2-732.000 | CV.TAJMILA | 9,081,780 | 1.82 % | Belum dinilai |
133 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembangunan Ruang Publik EX Pasar Lama Pelaihari | Tender | Pekerjaan Konstruksi | 3948172 | 28983495 | APBD | 2,860,000,000 | 2,860,000,000 | 2,810,000,088 | 2,809,892,000 | 2,807,780,000 | 2,807,780,000 | 2,807,780,000 | 0 | 2021-05-17 | 2021-06-03 | 2021-06-15 | 01.124.865.5-731.000 | PT. PARTNER KEMENANGAN | 01.124.865.5-731.000 | PT. PARTNER KEMENANGAN | 49,999,912 | 1.75 % | Belum dinilai |
134 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Penyusunan Grand Design Penataan Kota Pelaihari 2021 | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 3952172 | 28305249 | APBD | 1,237,500,000 | 1,235,627,800 | 0 | 0 | 0 | 0 | 0 | 0 | 2021-06-09 | 2021-07-22 | 1,237,500,000 | 100 % | Belum dinilai | |||||
135 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pelebaran Jalan Desa Sambangan Kec. Bati-Bati | Tender | Pekerjaan Konstruksi | 3953172 | 27496241 | APBD | 493,920,000 | 492,797,735 | 487,187,735 | 487,187,735 | 487,187,735 | 487,187,735 | 487,187,735 | 0 | 2021-07-08 | 2021-07-28 | 2021-08-06 | 01.214.327.7-732.000 | CV. YUDHI JASA | 01.214.327.7-732.000 | CV. YUDHI JASA | 6,732,265 | 1.36 % | Belum dinilai |
136 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pelebaran Jalan Desa Sukaramah Kec. Panyipatan | Tender | Pekerjaan Konstruksi | 3954172 | 27538680 | APBD | 295,960,000 | 295,705,498 | 289,773,809 | 289,773,809 | 289,482,000 | 289,482,000 | 0 | 0 | 2021-07-08 | 2021-07-27 | 2021-08-06 | 74.995.810.4-732.000 | CV. SARABA DUA | 74.995.810.4-732.000 | CV. SARABA DUA | 6,186,191 | 2.09 % | Belum dinilai |
137 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Gang Kuripan Desa Nusa Indah RT 10 Kec. Bati-Bati | Tender | Pekerjaan Konstruksi | 3955172 | 27569971 | APBD | 494,760,000 | 494,682,508 | 489,259,508 | 489,259,508 | 489,259,508 | 489,259,508 | 489,259,508 | 0 | 2021-07-08 | 2021-07-27 | 2021-08-04 | 72.312.881.5-732.000 | cv. berkat kencana | 72.312.881.5-732.000 | cv. berkat kencana | 5,500,492 | 1.11 % | Belum dinilai |
138 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Jalan Desa Bentok Kampung Rt. 8 Kec. Bati-Bati | Tender | Pekerjaan Konstruksi | 3956172 | 27570040 | APBD | 399,280,000 | 399,061,060 | 394,760,060 | 394,760,060 | 394,760,060 | 394,760,060 | 394,760,060 | 0 | 2021-07-08 | 2021-07-27 | 2021-08-04 | 75.004.987.6-732.000 | CV. 3R | 75.004.987.6-732.000 | CV. 3R | 4,519,940 | 1.13 % | Belum dinilai |
139 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Jalan Desa Handil Birayang Atas RT.006 Kec. Bumi Makmur | Tender | Pekerjaan Konstruksi | 3957172 | 27570071 | APBD | 331,800,000 | 331,248,526 | 324,059,999 | 324,059,999 | 323,616,000 | 323,616,000 | 0 | 0 | 2021-07-08 | 2021-07-27 | 2021-08-05 | 93.933.083.3-736.000 | Cv.kumala karya konstruksi | 93.933.083.3-736.000 | Cv.kumala karya konstruksi | 7,740,001 | 2.33 % | Belum dinilai |
140 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Jaaln Desa Handil Birayang Bawah RT.001 RT.002 Kec. Bumi Makmur | Tender | Pekerjaan Konstruksi | 3958172 | 27570100 | APBD | 348,600,000 | 348,406,234 | 341,193,999 | 341,193,999 | 340,825,990 | 340,825,990 | 0 | 0 | 2021-07-08 | 2021-07-28 | 2021-08-05 | 93.933.083.3-736.000 | Cv.kumala karya konstruksi | 93.933.083.3-736.000 | Cv.kumala karya konstruksi | 7,406,001 | 2.12 % | Belum dinilai |
141 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Jalan Desa Handil Labuan Amas RT.006, RT.007 Kec. Bumi Makmur | Tender | Pekerjaan Konstruksi | 3959172 | 27570175 | APBD | 383,600,000 | 383,104,485 | 375,379,708 | 375,379,708 | 374,994,000 | 374,994,000 | 0 | 0 | 2021-07-08 | 2021-07-28 | 2021-08-05 | 02.709.123.0-732.000 | CV. MEDIA MULTI MITRA | 02.709.123.0-732.000 | CV. MEDIA MULTI MITRA | 8,220,292 | 2.14 % | Belum dinilai |
142 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Jalan Desa Kait-Kait Rt. 011 Kec. Bati-Bati | Tender | Pekerjaan Konstruksi | 3960172 | 27570210 | APBD | 399,840,000 | 399,770,921 | 395,721,320 | 395,721,320 | 395,308,000 | 395,308,000 | 0 | 0 | 2021-07-08 | 2021-07-28 | 2021-08-05 | 80.756.975.1-732.000 | CV.HUZAIMAH RAYA SEMESTA | 80.756.975.1-732.000 | CV.HUZAIMAH RAYA SEMESTA | 4,118,681 | 1.03 % | Belum dinilai |
143 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Jalan Desa Maluka Baulin RT 4 Kec. Kurau | Tender | Pekerjaan Konstruksi | 3961172 | 27619431 | APBD | 599,280,000 | 598,467,619 | 591,106,003 | 591,106,003 | 590,650,000 | 590,650,000 | 0 | 0 | 2021-07-08 | 2021-07-28 | 2021-08-05 | 02.709.310.3-732.000 | CV. PUTRA BUMI MAKMUR | 02.709.310.3-732.000 | CV. PUTRA BUMI MAKMUR | 8,173,997 | 1.36 % | Belum dinilai |
144 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Jalan Desa Panggung RT. 12, 13, 4 B Kec. Pelaihari | Tender | Pekerjaan Konstruksi | 3962172 | 27619496 | APBD | 466,940,000 | 466,822,613 | 462,147,613 | 462,147,613 | 462,147,613 | 462,147,613 | 462,147,613 | 0 | 2021-07-08 | 2021-07-27 | 2021-08-04 | 01.961.550.9-732.000 | CV.WULAN | 01.961.550.9-732.000 | CV.WULAN | 4,792,387 | 1.03 % | Belum dinilai |
145 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Jalan Desa Sabuhur Kampung Kec. Jorong | Tender | Pekerjaan Konstruksi | 3963172 | 27619554 | APBD | 499,140,000 | 498,993,984 | 494,001,235 | 494,001,235 | 493,500,000 | 493,500,000 | 0 | 0 | 2021-07-08 | 2021-07-28 | 2021-08-04 | 93.933.083.3-736.000 | Cv.kumala karya konstruksi | 93.933.083.3-736.000 | Cv.kumala karya konstruksi | 5,138,765 | 1.03 % | Belum dinilai |
146 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Jalan Desa Sungai Riam RT. 05 dan RT. 12 Kec. Pelaihari | Tender | Pekerjaan Konstruksi | 3964172 | 27619651 | APBD | 466,400,000 | 466,045,646 | 460,199,146 | 460,199,146 | 459,700,000 | 459,700,000 | 0 | 0 | 2021-07-08 | 2021-07-28 | 2021-08-06 | 02.089.882.1-732.000 | CV DARMARAJA | 02.089.882.1-732.000 | CV DARMARAJA | 6,200,854 | 1.33 % | Belum dinilai |
147 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Jalan Desa Tambang Ulang RT.05 - 06 Kec. Tambang Ulang | Tender | Pekerjaan Konstruksi | 3965172 | 27619672 | APBD | 249,600,000 | 249,342,794 | 246,939,015 | 246,939,015 | 246,690,000 | 246,690,000 | 0 | 0 | 2021-07-08 | 2021-07-28 | 2021-08-04 | 93.933.083.3-736.000 | Cv.kumala karya konstruksi | 93.933.083.3-736.000 | Cv.kumala karya konstruksi | 2,660,985 | 1.07 % | Belum dinilai |
148 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Jalan Desa Tanjung Kec. Bajuin Rt. 19-22 Kec. Bajuin | Tender | Pekerjaan Konstruksi | 3966172 | 27619740 | APBD | 399,200,000 | 398,563,424 | 395,498,714 | 395,498,714 | 395,113,000 | 395,113,000 | 0 | 0 | 2021-07-08 | 2021-07-28 | 2021-08-04 | 93.933.083.3-736.000 | Cv.kumala karya konstruksi | 93.933.083.3-736.000 | Cv.kumala karya konstruksi | 3,701,286 | 0.93 % | Belum dinilai |
149 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Jalan Desa Ujung Baru Kec. Bati-Bati | Tender | Pekerjaan Konstruksi | 3967172 | 27619765 | APBD | 399,280,000 | 399,060,230 | 390,965,309 | 390,965,309 | 390,360,000 | 390,360,000 | 0 | 0 | 2021-07-08 | 2021-07-27 | 2021-08-05 | 02.709.123.0-732.000 | CV. MEDIA MULTI MITRA | 02.709.123.0-732.000 | CV. MEDIA MULTI MITRA | 8,314,691 | 2.08 % | Belum dinilai |
150 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Jalan Dusun I RT 2 & 3, Dusun II RT 6 dan Dusun III Rt 10 & 12 Desa Martadah Baru Kec. Tambang Ulang | Tender | Pekerjaan Konstruksi | 3968172 | 27619847 | APBD | 399,200,000 | 398,545,049 | 393,435,153 | 393,435,153 | 393,105,000 | 393,105,000 | 0 | 0 | 2021-07-08 | 2021-07-28 | 2021-08-05 | 93.927.191.2-731.000 | CV.HASRAT MULIA HABIBI | 93.927.191.2-731.000 | CV.HASRAT MULIA HABIBI | 5,764,847 | 1.44 % | Belum dinilai |
151 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Jalan Pendidikan Desa Pulau Sari RT.010 Dusun III Kec. Tambang Ulang | Tender | Pekerjaan Konstruksi | 3969172 | 27621634 | APBD | 618,320,000 | 618,313,206 | 605,849,199 | 605,849,199 | 605,299,000 | 605,299,000 | 0 | 0 | 2021-07-08 | 2021-07-28 | 2021-08-06 | 02.521.809.0-732.000 | cv. andhika karya | 02.521.809.0-732.000 | cv. andhika karya | 12,470,801 | 2.02 % | Belum dinilai |
152 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Jalan Perintis Desa Tampang RT. 3 Kec. Pelaihari | Tender | Pekerjaan Konstruksi | 3970172 | 27621697 | APBD | 466,940,000 | 466,871,302 | 463,375,296 | 463,375,296 | 462,990,000 | 462,990,000 | 0 | 0 | 2021-07-08 | 2021-07-28 | 2021-08-04 | 93.927.191.2-731.000 | CV.HASRAT MULIA HABIBI | 93.927.191.2-731.000 | CV.HASRAT MULIA HABIBI | 3,564,704 | 0.76 % | Belum dinilai |
153 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Jalan Simpang 4 Kantor Desa Alur Kec. Jorong | Tender | Pekerjaan Konstruksi | 3971172 | 27621825 | APBD | 499,800,000 | 498,993,984 | 493,698,735 | 493,698,735 | 493,203,000 | 493,203,000 | 0 | 0 | 2021-07-08 | 2021-07-28 | 2021-08-04 | 03.282.508.5-732.000 | cv.tata laksana konstruksi | 03.282.508.5-732.000 | cv.tata laksana konstruksi | 6,101,265 | 1.22 % | Belum dinilai |
154 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Jalan SMA Abdul Kadir Kec. Panyipatan | Tender | Pekerjaan Konstruksi | 3972172 | 27621890 | APBD | 1,449,560,000 | 1,449,302,463 | 1,445,458,354 | 1,445,458,354 | 1,445,458,354 | 1,445,458,354 | 1,445,458,354 | 0 | 2021-07-08 | 2021-07-28 | 2021-08-04 | 80.948.780.4-732.000 | CV.ANUGRAH JAYA PRATAMA | 80.948.780.4-732.000 | CV.ANUGRAH JAYA PRATAMA | 4,101,646 | 0.28 % | Belum dinilai |
155 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Jl. Lambenteng Sampai Jl. Dukuh Pucuk Desa Ujung Baru RT 04 Kec. Bati-Bati | Tender | Pekerjaan Konstruksi | 3973172 | 27622277 | APBD | 494,760,000 | 494,579,500 | 489,343,500 | 489,343,500 | 489,343,500 | 489,343,500 | 489,343,500 | 0 | 2021-07-08 | 2021-07-28 | 2021-08-06 | 02.709.161.0-732.000 | CV. DELTA UTAMA | 02.709.161.0-732.000 | CV. DELTA UTAMA | 5,416,500 | 1.09 % | Belum dinilai |
156 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Modal Alat Laboratorium Kualitas Air dan Tanah | Tender | Pengadaan Barang | 3984172 | 29190591 | APBD | 1,499,960,000 | 1,499,960,000 | 1,493,800,000 | 1,493,800,000 | 1,493,000,000 | 1,493,000,000 | 0 | 0 | 2021-05-27 | 2021-06-14 | 2021-07-01 | 02.216.086.5-732.000 | CV. Delima Merah | 02.216.086.5-732.000 | CV. Delima Merah | 6,160,000 | 0.41 % | Belum dinilai |
157 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konstruksi Bangunan Gedung Kantor | Tender | Pekerjaan Konstruksi | 3989172 | 29430118 | APBD | 695,750,000 | 691,090,564 | 599,300,825 | 599,300,825 | 599,300,825 | 599,300,825 | 599,300,825 | 0 | 2021-05-31 | 2021-06-17 | 2021-07-01 | 74.188.891.1-731.000 | CV. CITA KARYA MAHARANI | 74.188.891.1-731.000 | CV. CITA KARYA MAHARANI | 96,449,175 | 13.86 % | Belum dinilai |
158 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Normalisasi Muara Sungai Desa Batakan Kecamatan Panyipatan | Tender | Pekerjaan Konstruksi | 3995172 | 27454783 | APBD | 4,499,979,000 | 4,499,300,251 | 4,481,383,974 | 4,481,383,974 | 4,479,271,000 | 0 | 0 | 0 | 2021-05-31 | 2021-06-18 | 75.099.887.4-732.000 | PT. RADHIKA UTAMA JAYA | 18,595,026 | 0.41 % | Belum dinilai | |||
159 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembuatan Bangunan Pengaman Pantai Desa Muara Asam-Asam Kecamatan Jorong | Tender | Pekerjaan Konstruksi | 3996172 | 27454396 | APBD | 3,823,998,279 | 3,823,885,083 | 3,814,287,693 | 3,814,287,693 | 3,813,222,000 | 0 | 0 | 0 | 2021-05-31 | 2021-06-18 | 81.359.711.9-732.000 | PT. RIZKY ALFAQIH SEJAHTERA | 9,710,586 | 0.25 % | Belum dinilai | |||
160 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembangunan Siring Jalan Usaha Tani Desa Telaga Kecamatan Pelaihari | Tender | Pekerjaan Konstruksi | 3998172 | 27447128 | APBD | 474,999,943 | 474,832,891 | 468,884,007 | 468,594,007 | 468,594,007 | 0 | 0 | 0 | 2021-05-31 | 2021-06-18 | 31.683.055.3-732.000 | CV.RINALDI | 6,115,936 | 1.29 % | Belum dinilai | |||
161 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Normalisasi Sungai Desa Karang Rejo dan Desa Swarangan Kecamatan Jorong | Tender | Pekerjaan Konstruksi | 3999172 | 27454625 | APBD | 999,955,000 | 999,569,056 | 981,938,318 | 981,938,318 | 981,030,000 | 0 | 0 | 0 | 2021-05-31 | 2021-06-18 | 01.124.716.0-731.000 | CV. DUA MAS | 18,016,682 | 1.8 % | Belum dinilai | |||
162 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Rehabilitasi Talang D.I. Mandila Kecamatan Bajuin | Tender | Pekerjaan Konstruksi | 4000172 | 29330198 | APBD | 624,999,980 | 624,991,073 | 614,163,107 | 613,868,176 | 613,498,000 | 0 | 0 | 0 | 2021-05-31 | 2021-06-18 | 66.157.544.9-732.000 | ANANDA NINA PRATAMA | 10,836,873 | 1.73 % | Belum dinilai | |||
163 | 2021 | Badan Perencanaan Pembangunan, Riset dan Inovasi Daerah | Kajian Kawasan Berpotensi Bencana Dan Mitigasinya di Kabupaten Tanah Laut | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4001172 | 27922563 | APBD | 282,670,000 | 281,400,900 | 270,215,000 | 270,215,000 | 269,789,000 | 269,789,000 | 269,789,000 | 0 | 2021-06-07 | 2021-07-14 | 2021-07-29 | 02.241.591.3-424.000 | PT. WINAGUNA SARANA TEKNIK | 02.241.591.3-424.000 | PT. WINAGUNA SARANA TEKNIK | 12,455,000 | 4.41 % | Belum dinilai |
164 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembangunan Jembatan Kerasik - Bentok Darat | Tender | Pekerjaan Konstruksi | 4004172 | 29453262 | APBD | 6,145,920,000 | 6,145,760,232 | 6,016,419,404 | 6,016,419,404 | 6,013,944,000 | 6,013,944,000 | 5,312,343,323 | 0 | 2021-06-24 | 2021-07-17 | 2021-07-26 | 90.211.298.6-731.000 | CV.SERASI CAHAYA MADINAH | 90.211.298.6-731.000 | CV.SERASI CAHAYA MADINAH | 129,500,596 | 2.11 % | Belum dinilai |
165 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pemasangan Drainase Tertutup Komp. Kijang Mas Kel. Sarang Halang | Tender | Pekerjaan Konstruksi | 4007172 | 29068318 | APBD | 607,999,000 | 607,439,000 | 601,466,269 | 601,466,269 | 601,466,269 | 600,916,000 | 600,916,000 | 0 | 2021-08-10 | 2021-08-24 | 2021-09-03 | 80.948.780.4-732.000 | CV.ANUGRAH JAYA PRATAMA | 80.948.780.4-732.000 | CV.ANUGRAH JAYA PRATAMA | 6,532,731 | 1.07 % | Belum dinilai |
166 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Rehabilitasi Jalan Balirejo-Bajuin | Tender | Pekerjaan Konstruksi | 4012172 | 29453326 | APBD | 5,707,033,200 | 5,706,982,168 | 5,544,884,621 | 5,544,884,621 | 5,544,884,621 | 5,544,884,621 | 0 | 0 | 2021-06-24 | 2021-07-17 | 2021-07-27 | 90.511.879.0-732.000 | CV. ULFAH | 90.511.879.0-732.000 | CV. ULFAH | 162,148,579 | 2.84 % | Belum dinilai |
167 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Rehabilitasi Jalan Pabahanan - Kunyit | Tender | Pekerjaan Konstruksi | 4013172 | 29453450 | APBD | 10,713,083,920 | 10,712,504,072 | 10,525,169,356 | 10,525,169,356 | 10,525,169,356 | 10,525,169,356 | 0 | 0 | 2021-06-24 | 2021-07-17 | 2021-07-26 | 01.124.716.0-731.000 | CV. DUA MAS | 01.124.716.0-731.000 | CV. DUA MAS | 187,914,564 | 1.75 % | Belum dinilai |
168 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Rehabilitasi Jalan Takisung - Tabanio | Tender | Pekerjaan Konstruksi | 4014172 | 29453505 | APBD | 1,744,998,750 | 1,744,865,998 | 1,729,893,942 | 1,729,893,942 | 1,729,893,942 | 1,729,893,942 | 0 | 0 | 2021-06-24 | 2021-07-17 | 2021-07-27 | 71.596.226.2-732.000 | MENCARI BERKAH | 71.596.226.2-732.000 | MENCARI BERKAH | 15,104,808 | 0.87 % | Belum dinilai |
169 | 2021 | Dinas Ketahanan Pangan dan Perikanan | Belanja Persediaan untuk Dijual/Diserahkan-Persediaan untuk Dijual/Diserahkan kepada Masyarakat (Pengadaan Alat Tangkap Ikan Ramah Lingkungan Trammel Net dan Gill Net) | Tender Cepat | Pengadaan Barang | 4016172 | 29562959 | APBD | 588,999,994 | 262,640,422 | 259,710,000 | 259,710,000 | 259,710,000 | 259,710,000 | 0 | 0 | 2021-06-24 | 2021-06-25 | 2021-07-22 | 72.781.403.0-805.000 | CV. SUKSES JAYA MANDIRI | 72.781.403.0-805.000 | CV. SUKSES JAYA MANDIRI | 329,289,994 | 55.91 % | Belum dinilai |
170 | 2021 | Dinas Koperasi, Usaha Kecil dan Perdagangan | Belanja Modal alat Angkutan | Tender Cepat | Pengadaan Barang | 4018172 | 28803227 | APBD | 599,500,000 | 597,579,200 | 592,000,001 | 592,000,001 | 592,000,001 | 592,000,001 | 592,000,001 | 0 | 2021-07-02 | 2021-07-05 | 2021-07-29 | 02.575.821.0-732.000 | PT. Mitra Profitamas Motor | 02.575.821.0-732.000 | PT. Mitra Profitamas Motor | 7,499,999 | 1.25 % | Belum dinilai |
171 | 2021 | Dinas Pendidikan dan Kebudayaan | Rehab Sedang / Berat dan Fasilitasi Kubah Makam Keramat Datu Pamulutan Kecamatan Panyipatan | Tender | Pekerjaan Konstruksi | 4019172 | 28023931 | APBD | 421,400,052 | 421,400,000 | 416,437,300 | 416,437,300 | 415,958,000 | 0 | 0 | 0 | 2021-06-29 | 2021-07-14 | 90.506.445.7-732.000 | CV. AZIZA | 4,962,752 | 1.18 % | Belum dinilai | |||
172 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Konsolidasi Konsultan Survey Kondisi Jalan Tahun 2021 (Paket 1,2,3,4, dan 5) | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 4021172 | 29176255 | APBD | 500,000,000 | 499,963,750 | 475,074,875 | 475,074,875 | 474,662,375 | 474,662,375 | 474,662,375 | 0 | 2021-06-11 | 2021-07-07 | 2021-07-14 | 02.390.537.5-429.000 | PT. PADURAKSA KONSULTAN | 02.390.537.5-429.000 | PT. PADURAKSA KONSULTAN | 24,925,125 | 4.99 % | Belum dinilai |
173 | 2021 | Dinas Koperasi, Usaha Kecil dan Perdagangan | BELANJA MODAL ALAT BENGKEL DAN ALAT UKUR | Tender | Pengadaan Barang | 4024172 | 29591109 | APBD | 1,118,948,600 | 1,065,725,650 | 842,418,500 | 842,418,500 | 842,418,500 | 842,418,500 | 0 | 0 | 2021-07-16 | 2021-08-09 | 2021-09-01 | 03.206.369.5-609.000 | cv jasmet global perkasa | 03.206.369.5-609.000 | cv jasmet global perkasa | 276,530,100 | 24.71 % | Belum dinilai |
174 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Peningkatan Jalan Lingkungan Perumahan Cahaya BanyuBanua, Desa Banyu Irang Kecamatan Bati-Bati | Tender | Pekerjaan Konstruksi | 4030172 | 29215801 | APBD | 351,006,655 | 334,825,507 | 331,459,499 | 331,459,499 | 331,459,499 | 0 | 0 | 0 | 2021-09-20 | 2021-10-05 | 72.312.881.5-732.000 | cv. berkat kencana | 19,547,156 | 5.57 % | Belum dinilai | |||
175 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Peningkatan Jalan Lingkungan Gg Nabela Matah Kel.Karang Taruna | Tender | Pekerjaan Konstruksi | 4031172 | 29214256 | APBD | 397,064,248 | 381,864,108 | 377,756,707 | 377,756,707 | 377,756,707 | 0 | 0 | 0 | 2021-09-20 | 2021-10-05 | 76.708.451.0-732.000 | CV Berkah Terang Rahmat | 19,307,541 | 4.86 % | Belum dinilai | |||
176 | 2021 | Dinas Kesehatan | Pengadaan Mobil Promosi Kesehatan (Promkes) | Tender Cepat | Pengadaan Barang | 4038172 | 29627386 | APBD | 649,999,999 | 649,950,000 | 634,145,001 | 634,145,001 | 634,145,001 | 634,145,001 | 634,145,000 | 0 | 2021-06-18 | 2021-06-21 | 2021-06-29 | 01.474.170.6-732.000 | PT. WIRA MEGAH PROFITAMAS | 01.474.170.6-732.000 | PT. WIRA MEGAH PROFITAMAS | 15,854,999 | 2.44 % | Belum dinilai |
177 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembangunan Jalan Lingkar Dalam Takisung Kec. Takisung | Tender | Pekerjaan Konstruksi | 4048172 | 27539013 | APBD | 1,463,200,000 | 1,462,926,379 | 1,444,598,095 | 1,444,598,095 | 1,444,598,095 | 1,444,598,095 | 1,444,598,095 | 0 | 2021-06-24 | 2021-07-17 | 2021-07-23 | 81.396.118.2-732.000 | CV. Nabel Saputra | 81.396.118.2-732.000 | CV. Nabel Saputra | 18,601,905 | 1.27 % | Belum dinilai |
178 | 2021 | Dinas Pemberdayaan Perempuan dan Perlindungan Anak, Pengendalian Penduduk dan KeluargaBerencana | Belanja Modal Bangunan Gedung Kantor Gudang Alat dan Obat Kontrasepsi | Tender | Pekerjaan Konstruksi | 4049172 | 29258054 | APBD | 381,150,000 | 357,139,800 | 356,439,799 | 356,444,530 | 356,444,530 | 354,420,000 | 0 | 0 | 2021-06-24 | 2021-07-07 | 2021-07-14 | 86.495.751.9-732.000 | CV. ZAINA MADINA | 86.495.751.9-732.000 | CV. ZAINA MADINA | 24,710,201 | 6.48 % | Belum dinilai |
179 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembuatan Jembatan Gantung Kelurahan Pabahanan Kec. Pelaihari | Tender | Pekerjaan Konstruksi | 4053172 | 29659547 | APBD | 799,999,970 | 799,992,306 | 790,771,529 | 790,626,000 | 790,076,000 | 0 | 0 | 0 | 2021-06-24 | 2021-07-09 | 02.172.423.2-732.000 | CV. REVIAMI | 9,228,441 | 1.15 % | Belum dinilai | |||
180 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Rehabilitasi Tanggul Penahan Air Asin Daerah Irigasi Rawa Kecamatan Bumi Makmur | Tender | Pekerjaan Konstruksi | 4055172 | 29329783 | APBD | 1,082,249,379 | 1,082,020,995 | 1,060,295,159 | 1,060,295,159 | 1,060,295,159 | 0 | 0 | 0 | 2021-06-24 | 2021-07-09 | 02.521.809.0-732.000 | cv. andhika karya | 21,954,220 | 2.03 % | Belum dinilai | |||
181 | 2021 | Dinas Tenaga Kerja dan Perindustrian | Pembangunan Rumah Kemasan | Tender | Pekerjaan Konstruksi | 4057172 | 29108181 | APBD | 475,014,540 | 475,000,000 | 471,272,803 | 471,272,803 | 471,272,803 | 470,750,000 | 0 | 0 | 2021-06-25 | 2021-07-07 | 2021-07-27 | 02.709.123.0-732.000 | CV. MEDIA MULTI MITRA | 02.709.123.0-732.000 | CV. MEDIA MULTI MITRA | 3,741,737 | 0.79 % | Belum dinilai |
182 | 2021 | Dinas Pendidikan dan Kebudayaan | Konsolidasi Rehabilitasi Ruang Perpustakaan dengan tingkat kerusakan minimal sedang UPTD SMPN 4 Bati-Bati (DAK) dan Rehabilitasi Ruang Tata Usaha dengan tingkat kerusakan minimal sedang UPTD SMPN 4 Bati-Bati (DAK) | Tender | Pekerjaan Konstruksi | 4058172 | 29519227;29685950 | APBD | 442,050,138 | 441,948,000 | 436,647,836 | 436,647,836 | 436,647,836 | 436,647,836 | 436,647,836 | 0 | 2021-06-28 | 2021-07-08 | 2021-07-16 | 02.172.753.2-732.000 | CV. MULTI KREASI BORNEO | 02.172.753.2-732.000 | CV. MULTI KREASI BORNEO | 5,402,302 | 1.22 % | Belum dinilai |
183 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Konsultansi Perencanaan DED Ruas Jalan Asam-Asam - Riam Adungan | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 4059172 | 27650121 | APBD | 600,000,000 | 599,901,500 | 575,270,817 | 575,270,817 | 574,445,817 | 574,445,817 | 574,445,817 | 0 | 2021-07-08 | 2021-08-11 | 2021-08-23 | 02.390.537.5-429.000 | PT. PADURAKSA KONSULTAN | 02.390.537.5-429.000 | PT. PADURAKSA KONSULTAN | 24,729,183 | 4.12 % | Belum dinilai |
184 | 2021 | Dinas Pendidikan dan Kebudayaan | Konsolidasi Rehabilitasi ruang perpustakaan dengan tingkat kerusakan minimal sedang UPTD SMPN 5 Bati-bati (DAK) dan Rehabilitasi Ruang kelas dengan tingkat kerusakan minimal sedang UPTD SMPN 5 Bati-Bati (DAK) | Tender | Pekerjaan Konstruksi | 4060172 | 29685979;29696742 | APBD | 578,025,330 | 577,468,000 | 572,325,000 | 572,325,000 | 572,325,000 | 572,325,000 | 572,325,000 | 0 | 2021-06-28 | 2021-07-08 | 2021-07-16 | 02.709.132.1-732.000 | CV. KIBUNG ABADI | 02.709.132.1-732.000 | CV. KIBUNG ABADI | 5,700,330 | 0.99 % | Belum dinilai |
185 | 2021 | Dinas Pendidikan dan Kebudayaan | Konsolidasi Pembangunan Laboratorium Komputer UPTD SD Negeri 4 Gunung Makmur (DAK),Pembangunan ruang guru UPTD SDN 4 GUNUNG MAKMUR (DAK dan Rehabilitasi ruang kelas dengan tingkat kerusakan minimal sedang UPTD SDN 4 GUNUNG MAKMUR (DAK) | Tender | Pekerjaan Konstruksi | 4061172 | 29441475;29450969;29684189 | APBD | 842,923,641 | 842,454,000 | 835,869,300 | 835,869,300 | 834,971,000 | 834,971,000 | 100 | 0 | 2021-06-28 | 2021-07-08 | 2021-07-16 | 72.032.397.1-732.000 | CV. PUTERI NUGRAHA | 72.032.397.1-732.000 | CV. PUTERI NUGRAHA | 7,054,341 | 0.84 % | Belum dinilai |
186 | 2021 | Dinas Pendidikan dan Kebudayaan | Konsolidasi Pembangunan ruang guru UPTD SDN GUNUNG MAS (DAK),Pembangunan ruang laboratorium komputer UPTD SDN GUNUNG MAS (DAK),Rehabilitasi ruang kelas dengan tingkat kerusakan minimal sedang UPTD SDN GUNUNG MAS (DAK) dan Rehabilitasi ruang perpustakaan dengan tingkat kerusakan minimal sedang UPTD SDN GUNUNG MAS (DAK) | Tender | Pekerjaan Konstruksi | 4062172 | 29448117;29528277;29685940;29689451 | APBD | 815,062,081 | 814,703,000 | 808,336,400 | 807,278,000 | 806,905,000 | 806,905,000 | 0 | 0 | 2021-06-28 | 2021-07-08 | 2021-07-16 | 01.124.719.4-732.000 | CV. IRAMA | 01.124.719.4-732.000 | CV. IRAMA | 6,725,681 | 0.83 % | Belum dinilai |
187 | 2021 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi Ruang kelas dengan tingkat kerusakan minimal sedang UPTD SDN JILATAN (DAK) | Tender | Pekerjaan Konstruksi | 4063172 | 29444095 | APBD | 391,755,048 | 391,629,000 | 387,085,749 | 387,085,749 | 387,085,749 | 386,346,000 | 386,346,000 | 0 | 2021-06-28 | 2021-07-08 | 2021-07-16 | 01.214.327.7-732.000 | CV. YUDHI JASA | 01.214.327.7-732.000 | CV. YUDHI JASA | 4,669,299 | 1.19 % | Belum dinilai |
188 | 2021 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi ruang perpustakaan dengan tingkat kerusakan minimal sedang UPTD SDN 2 KEBUN RAYA (DAK),Rehabilitasi ruang kelas dengan tingkat kerusakan minimal sedang UPTD SDN 2 KEBUNRAYA (DAK),Pembangunan ruang UKS UPTD SDN 2 KEBUN RAYA (DAK),Pembangunan ruang perpustakaan UPTD SDN 2 KEBUN RAYA (DAK),Pembangunan ruang laboratorium komputer UPTD SDN 2 KEBUN RAYA (DAK) | Tender | Pekerjaan Konstruksi | 4064172 | 29441429;29450899;29528240;29528318;29528333 | APBD | 1,223,738,620 | 1,200,252,000 | 1,188,038,000 | 1,188,038,000 | 1,188,038,000 | 1,188,038,000 | 1,188,038,000 | 0 | 2021-06-28 | 2021-07-08 | 2021-07-16 | 86.380.418.3-732.000 | CV BERSAMA KAWAN SEJAHTERA | 86.380.418.3-732.000 | CV BERSAMA KAWAN SEJAHTERA | 35,700,620 | 2.92 % | Belum dinilai |
189 | 2021 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi ruang kelas dengan tingkat kerusakan minimal sedang UPTD SDN 3 PANDANSARI (DAK) | Tender | Pekerjaan Konstruksi | 4065172 | 29441442 | APBD | 604,975,346 | 604,426,000 | 593,195,000 | 591,911,000 | 590,853,000 | 590,853,000 | 590,853,000 | 0 | 2021-06-28 | 2021-07-08 | 2021-07-16 | 86.386.465.8-732.000 | CV MITRA USAHA SUKSES | 86.386.465.8-732.000 | CV MITRA USAHA SUKSES | 11,780,346 | 1.95 % | Belum dinilai |
190 | 2021 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi ruang kelas dengan tingkat kerusakan minimal sedang UPTD SDN TELAGA LANGSAT (DAK) | Tender | Pekerjaan Konstruksi | 4066172 | 29449200 | APBD | 565,705,069 | 565,704,970 | 560,052,800 | 561,026,000 | 561,026,000 | 560,038,000 | 0 | 0 | 2021-06-28 | 2021-07-08 | 2021-07-16 | 90.695.223.9-732.000 | CV.AWI BATAKAN UTAMA | 90.695.223.9-732.000 | CV.AWI BATAKAN UTAMA | 5,652,269 | 1 % | Belum dinilai |
191 | 2021 | Dinas Kepemudaan dan Olah Raga | Konsolidasi Perbaikan/Rehab Ringan/Sedang/Berat Sarpras Olahraga (GOR, Lapangan Basket, Lapangan Tenis, dan Lapangan Volly) | Tender | Pekerjaan Konstruksi | 4072172 | 28931560 | APBD | 629,321,000 | 628,186,000 | 599,350,400 | 599,350,400 | 599,350,400 | 599,350,400 | 0 | 0 | 2021-07-21 | 2021-08-04 | 2021-08-16 | 95.386.887.4-732.000 | CV Kindai Artha Jaya | 95.386.887.4-732.000 | CV Kindai Artha Jaya | 29,970,600 | 4.76 % | Belum dinilai |
192 | 2021 | Dinas Kependudukan dan Pencatatan Sipil | Belanja Alat/Bahan untuk Kegiatan Kantor - Bahan Komputer | Tender Cepat | Pengadaan Barang | 4074172 | 29274135 | APBD | 510,268,000 | 501,750,047 | 394,152,000 | 394,152,000 | 394,152,000 | 394,152,000 | 0 | 0 | 2021-07-14 | 2021-07-16 | 2021-07-28 | 73.002.884.2-044.000 | PT. TRIKREASINDO MANDIRI SENTOSA | 73.002.884.2-044.000 | PT. TRIKREASINDO MANDIRI SENTOSA | 116,116,000 | 22.76 % | Belum dinilai |
193 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Rehabilitasi Tanggul Penahan Air Asin Daerah Irigasi Rawa Kecamatan Kurau | Tender | Pekerjaan Konstruksi | 4077172 | 29330813 | APBD | 793,863,191 | 793,756,757 | 777,887,736 | 777,887,736 | 777,179,000 | 0 | 0 | 0 | 2021-07-08 | 2021-07-28 | 72.831.285.1-732.000 | CV. Anindya | 15,975,455 | 2.01 % | Belum dinilai | |||
194 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Rehabilitasi Bendung D.I. Sebamban Baru Kecamatan Kintap | Tender | Pekerjaan Konstruksi | 4079172 | 29330037 | APBD | 568,999,994 | 568,998,727 | 566,976,299 | 566,976,299 | 566,426,000 | 0 | 0 | 0 | 2021-07-08 | 2021-07-28 | 82.839.397.5-732.000 | CV. ASSYA | 2,023,695 | 0.36 % | Belum dinilai | |||
195 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Rehabilitasi Jaringan Irigasi D.I. Kunyit Kecamatan Bajuin | Tender | Pekerjaan Konstruksi | 4080172 | 29330312 | APBD | 612,799,893 | 612,589,589 | 608,285,891 | 608,285,891 | 607,363,200 | 0 | 0 | 0 | 2021-07-08 | 2021-07-28 | 72.657.370.2-732.000 | CV.KEMBAR UTAMA | 4,514,002 | 0.74 % | Belum dinilai | |||
196 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembuatan Bangunan Pengaman Pantai Desa Muara Kintap Kecamatan Kintap | Tender | Pekerjaan Konstruksi | 4081172 | 27454011 | APBD | 2,999,999,200 | 2,999,971,616 | 2,972,048,416 | 2,972,048,416 | 2,970,805,000 | 0 | 0 | 0 | 2021-07-08 | 2021-07-28 | 86.380.418.3-732.000 | CV BERSAMA KAWAN SEJAHTERA | 27,950,784 | 0.93 % | Belum dinilai | |||
197 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perkerasan Jalan Lingkungan Rumah Sakit H. Boejasin | Tender | Pekerjaan Konstruksi | 4083172 | 29216792 | APBD | 872,000,016 | 837,320,909 | 819,678,891 | 819,678,891 | 819,019,000 | 0 | 0 | 0 | 2021-07-10 | 2021-07-23 | 02.521.809.0-732.000 | cv. andhika karya | 52,321,125 | 6 % | Belum dinilai | |||
198 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan Drainase/ Saluran Perkotaan Rumah Sakit H.Boejasin | Tender | Pekerjaan Konstruksi | 4084172 | 29195627 | APBD | 2,800,000,000 | 2,714,510,921 | 2,658,904,715 | 2,658,904,715 | 2,656,050,000 | 0 | 0 | 0 | 2021-07-10 | 2021-07-23 | 72.831.285.1-732.000 | CV. Anindya | 141,095,285 | 5.04 % | Belum dinilai | |||
199 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Jalan Desa Sungai Cuka Kec. Kintap | Tender | Pekerjaan Konstruksi | 4085172 | 27619623 | APBD | 349,280,000 | 348,631,689 | 344,576,068 | 344,576,068 | 344,217,616 | 344,217,616 | 0 | 0 | 2021-07-12 | 2021-07-28 | 2021-08-04 | 03.282.508.5-732.000 | cv.tata laksana konstruksi | 03.282.508.5-732.000 | cv.tata laksana konstruksi | 4,703,932 | 1.35 % | Belum dinilai |
200 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembangunan TPS B3 | Tender | Pekerjaan Konstruksi | 4086172 | 28278500 | APBD | 528,000,000 | 528,000,000 | 522,598,533 | 522,598,533 | 522,598,533 | 522,598,533 | 522,598,533 | 0 | 2021-07-12 | 2021-07-23 | 2021-08-04 | 02.709.161.0-732.000 | CV. DELTA UTAMA | 02.709.161.0-732.000 | CV. DELTA UTAMA | 5,401,467 | 1.02 % | Belum dinilai |
201 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Penggantian Box Culvert Jalan Desa Pandan Sari RT 08/02 Kec. Kintap | Tender | Pekerjaan Konstruksi | 4089172 | 27546033 | APBD | 644,444,444 | 643,382,706 | 636,071,661 | 636,071,661 | 635,543,000 | 635,543,000 | 0 | 0 | 2021-07-13 | 2021-07-28 | 2021-08-04 | 76.853.698.9-732.000 | CV BERKAT USAHA MANDIRI | 76.853.698.9-732.000 | CV BERKAT USAHA MANDIRI | 8,372,783 | 1.3 % | Belum dinilai |
202 | 2021 | Dinas Kesehatan | Pengadaan Instalasi Pengolahan Air Limbah (IPAL) Puskesmas | Tender | Pengadaan Barang | 4098172 | 29735196 | APBD | 990,000,000 | 990,000,000 | 984,753,000 | 984,753,000 | 984,753,000 | 0 | 0 | 0 | 2021-08-03 | 2021-08-24 | 84.203.129.6-001.000 | CV. DETRILA KARYA | 5,247,000 | 0.53 % | Belum dinilai | |||
203 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Rehabilitasi Bendungan Desa Tebing Siring Kecamatan Bajuin | Tender | Pekerjaan Konstruksi | 4099172 | 27495839 | APBD | 1,279,960,000 | 1,279,948,634 | 1,274,156,998 | 1,274,156,998 | 1,274,156,998 | 0 | 0 | 0 | 2021-07-27 | 2021-08-07 | 90.506.445.7-732.000 | CV. AZIZA | 5,803,002 | 0.45 % | Belum dinilai | |||
204 | 2021 | Dinas Kesehatan | PENGADAAN SANITARIAN KIT (DAK), KONSOLIDASI : BELANJA OBAT-OBATAN- OBATAN LAINNYA (SANITARIAN KIT), BELANJA MODAL ALAT KANTOR LAINNYA, BELANJA MODAL ALAT KESEHATAN MATRA LAUT DAN BELANJA MODAL ALAT LABORATORIUN (SANITARIAN KIT) | Tender | Pengadaan Barang | 4100172 | 29772720;29772736;29772741;29773560 | APBD | 862,042,500 | 862,042,500 | 853,422,075 | 853,422,075 | 853,422,075 | 0 | 0 | 0 | 2021-07-29 | 2021-08-10 | 03.096.863.0-008.000 | CV. DOMASEEP PERMAY SURYA | 8,620,425 | 1 % | Belum dinilai | |||
205 | 2021 | Dinas Kepemudaan dan Olah Raga | Belanja Modal Pembangunan Gedung Futsal Desa Asam Jaya (Kec.Jorong) | Tender | Pekerjaan Konstruksi | 4105172 | 28534701 | APBD | 506,000,000 | 505,127,295 | 498,943,575 | 498,943,575 | 498,943,575 | 498,943,575 | 0 | 0 | 2021-08-10 | 2021-08-24 | 2021-09-03 | 76.853.698.9-732.000 | CV BERKAT USAHA MANDIRI | 76.853.698.9-732.000 | CV BERKAT USAHA MANDIRI | 7,056,425 | 1.39 % | Belum dinilai |
206 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultansi MasterPlan Penerangan Jalan Umum Kota Pelaihari | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 4107172 | 29704647 | APBD | 330,000,000 | 329,508,960 | 319,614,900 | 319,614,900 | 319,119,000 | 319,119,000 | 319,119,000 | 0 | 2021-08-02 | 2021-09-01 | 2021-09-09 | 01.236.248.9-651.000 | KOPKAR INTI KESEJAHTERAAN | 01.236.248.9-651.000 | KOPKAR INTI KESEJAHTERAAN | 10,385,100 | 3.15 % | Belum dinilai |
207 | 2021 | Dinas Peternakan Dan Kesehatan Hewan | BELANJA HIBAH BIBIT TERNAK ITIK: 1.Belanja hibah itik KT. Harapan Bersama Desa Kurau Utara Kec.Bumi Makmur, 2.Belanja Hibah (Bibit Itik KT. Usaha Bersama Desa Bumi Harapan Kec. Bumi Makmur), 3.Belanja Hibah Bibit Ternak Itik KT. Cinta Maju Desa Handil Labuan Amas Kec. Bumi Makmur, 4.Belanja Hibah Bibit Ternak Itik KT. Cinta Makmur desa Handil Birayang Atas Kec. Bumi Makmur | Tender | Pengadaan Barang | 4109172 | 29786983;29787057;29787103;29787139 | APBD | 270,000,000 | 243,772,200 | 237,600,000 | 237,600,000 | 237,600,000 | 0 | 0 | 0 | 2021-08-02 | 2021-08-19 | 02.342.717.2-733.000 | CV. ZULFA PERDANA | 32,400,000 | 12 % | Belum dinilai | |||
208 | 2021 | Dinas Kepemudaan dan Olah Raga | Belanja Modal Peralatan Olahraga Udara | Tender | Pengadaan Barang | 4117172 | 28547291 | APBD | 317,057,400 | 218,988,000 | 218,302,425 | 218,302,425 | 218,302,425 | 0 | 0 | 0 | 2021-08-13 | 2021-08-25 | 72.701.640.4-008.000 | PT.Anugerah Berkat Risen | 98,754,975 | 31.15 % | Belum dinilai | |||
209 | 2021 | Dinas Pendidikan dan Kebudayaan | Penambahan ruang kelas sekolah UPTD SDN 2 Kintapura | Tender | Pekerjaan Konstruksi | 4118172 | 28239864 | APBD | 588,176,714 | 588,161,000 | 582,064,430 | 582,064,430 | 582,064,430 | 0 | 0 | 0 | 2021-08-16 | 2021-09-01 | 02.709.161.0-732.000 | CV. DELTA UTAMA | 6,112,284 | 1.04 % | Belum dinilai | |||
210 | 2021 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi sedang/berat Ruang kelas sekolah UPTD SDN Handil Maluka | Tender | Pekerjaan Konstruksi | 4123172 | 28238538 | APBD | 404,250,050 | 404,240,000 | 402,821,153 | 402,821,000 | 402,821,000 | 0 | 0 | 0 | 2021-08-16 | 2021-09-01 | 80.652.777.6-732.000 | cv astra bina | 1,428,897 | 0.35 % | Belum dinilai | |||
211 | 2021 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi sedang/berat Ruang kelas sekolah UPTD SDN Pantai Harapan | Tender | Pekerjaan Konstruksi | 4124172 | 28238794 | APBD | 406,700,050 | 406,700,000 | 403,062,175 | 403,062,175 | 402,512,000 | 0 | 0 | 0 | 2021-08-16 | 2021-09-01 | 02.709.310.3-732.000 | CV. PUTRA BUMI MAKMUR | 3,637,875 | 0.89 % | Belum dinilai | |||
212 | 2021 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi sedang/berat Ruang kelas sekolah UPTD SDN Kali Besar | Tender | Pekerjaan Konstruksi | 4125172 | 28238686 | APBD | 404,250,050 | 404,225,000 | 399,792,140 | 399,692,000 | 399,692,000 | 0 | 0 | 0 | 2021-08-16 | 2021-09-01 | 01.214.327.7-732.000 | CV. YUDHI JASA | 4,457,910 | 1.1 % | Belum dinilai | |||
213 | 2021 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi sedang/berat Ruang kelas sekolah UPTD SDN 1 Handil Negara | Tender | Pekerjaan Konstruksi | 4126172 | 28234486 | APBD | 404,250,050 | 404,225,000 | 400,120,189 | 400,120,189 | 400,120,189 | 0 | 0 | 0 | 2021-08-16 | 2021-09-01 | 31.683.055.3-732.000 | CV.RINALDI | 4,129,861 | 1.02 % | Belum dinilai | |||
214 | 2021 | Dinas Pendidikan dan Kebudayaan | Pembangunan Ruang Guru/Kepala Sekolah/TU UPTD SDN Bentok Kampung | Tender | Pekerjaan Konstruksi | 4127172 | 29354197 | APBD | 250,727,415 | 250,638,000 | 249,515,876 | 249,515,876 | 249,515,876 | 0 | 0 | 0 | 2021-08-16 | 2021-09-01 | 72.032.397.1-732.000 | CV. PUTERI NUGRAHA | 1,211,539 | 0.48 % | Belum dinilai | |||
215 | 2021 | Dinas Pendidikan dan Kebudayaan | Penambahan ruang kelas sekolah UPTD SDN 1 Nusa Indah | Tender | Pekerjaan Konstruksi | 4129172 | 28277503 | APBD | 392,117,810 | 391,905,000 | 387,522,713 | 387,522,713 | 387,522,713 | 0 | 0 | 0 | 2021-08-16 | 2021-09-01 | 76.708.451.0-732.000 | CV Berkah Terang Rahmat | 4,595,097 | 1.17 % | Belum dinilai | |||
216 | 2021 | Dinas Pendidikan dan Kebudayaan | Pembangunan Ruang Guru/Kepala Sekolah/TU UPTD SMPN 4 Jorong | Tender | Pekerjaan Konstruksi | 4132172 | 29898023 | APBD | 263,752,216 | 263,740,000 | 260,860,719 | 260,860,719 | 260,860,719 | 0 | 0 | 0 | 2021-08-16 | 2021-09-01 | 02.172.753.2-732.000 | CV. MULTI KREASI BORNEO | 2,891,497 | 1.1 % | Belum dinilai | |||
217 | 2021 | Dinas Kesehatan | Pengadaan Mobil Bus donor Darah | Tender | Pengadaan Barang | 4136172 | 29641213 | APBD | 841,500,000 | 841,500,000 | 824,670,000 | 824,670,000 | 824,670,000 | 0 | 0 | 0 | 2021-08-25 | 2021-09-03 | 31.269.411.0-418.000 | CV. Cahaya Kurnia Mandiri | 16,830,000 | 2 % | Belum dinilai | |||
218 | 2021 | Dinas Kesehatan | Pengadaan Mobil Ambulance Double Gardan | Tender | Pengadaan Barang | 4137172 | 29917628 | APBD | 541,871,000 | 541,871,000 | 535,177,500 | 535,177,500 | 535,177,500 | 0 | 0 | 0 | 2021-08-25 | 2021-09-03 | 74.966.338.1-803.000 | CV. MULTI MITRA SEJAHTERA | 6,693,500 | 1.24 % | Belum dinilai | |||
219 | 2021 | Dinas Kesehatan | Pengadaan Mobil Pusling | Tender Cepat | Pengadaan Barang | 4144172 | 29933953 | APBD | 497,200,000 | 480,058,600 | 479,529,600 | 479,529,600 | 479,529,600 | 0 | 0 | 0 | 2021-09-01 | 2021-09-03 | 01.878.998.2-731.000 | PT. MITRA MEGAH PROFITAMAS | 17,670,400 | 3.55 % | Belum dinilai | |||
220 | 2021 | Dinas Kesehatan | Pengadaan Mobil Ambulance | Tender Cepat | Pengadaan Barang | 4145172 | 29934012 | APBD | 704,000,000 | 672,112,800 | 641,652,000 | 641,652,000 | 641,652,000 | 0 | 0 | 0 | 2021-09-01 | 2021-09-03 | 01.878.998.2-731.000 | PT. MITRA MEGAH PROFITAMAS | 62,348,000 | 8.86 % | Belum dinilai | |||
221 | 2021 | Dinas Kesehatan | Pengadaan Tempat cuci tangan portable | Tender | Pengadaan Barang | 4148172 | 29841400 | APBD | 380,000,000 | 377,500,000 | 374,000,000 | 374,000,000 | 373,450,000 | 0 | 0 | 0 | 2021-09-01 | 2021-09-15 | 02.172.420.8-732.000 | CV. TELAGA MAS | 6,000,000 | 1.58 % | Belum dinilai | |||
222 | 2021 | Dinas Pendidikan dan Kebudayaan | Penambahan ruang kelas sekolah UPTD SDN 3 Batakan | Tender | Pekerjaan Konstruksi | 4149172 | 28240548 | APBD | 392,117,810 | 391,930,000 | 387,934,494 | 387,934,494 | 387,934,494 | 0 | 0 | 0 | 2021-08-30 | 2021-09-10 | 02.172.753.2-732.000 | CV. MULTI KREASI BORNEO | 4,183,316 | 1.07 % | Belum dinilai | |||
223 | 2021 | Dinas Pendidikan dan Kebudayaan | Pembangunan Ruang Guru/Kepala Sekolah/TU UPTD SMPN 4 Batu Ampar | Tender | Pekerjaan Konstruksi | 4151172 | 29897991 | APBD | 263,752,216 | 263,741,000 | 260,589,999 | 260,589,999 | 260,589,999 | 0 | 0 | 0 | 2021-08-30 | 2021-09-10 | 74.981.772.2-732.000 | rafa jaya abadi | 3,162,217 | 1.2 % | Belum dinilai | |||
224 | 2021 | Sekretariat Dewan Perwakilan Rakyat Daerah | Penyediaan Pakaian Dinas dan Atribut DPRD | Tender | Jasa Lainnya | 4153172 | 28581587 | APBD | 498,520,000 | 378,972,000 | 376,810,500 | 376,810,500 | 376,438,000 | 376,438,000 | 0 | 0 | 2021-09-14 | 2021-09-24 | 2021-10-04 | 02.660.127.8-732.000 | CV. MANDIRI BERSAMA | 02.660.127.8-732.000 | CV. MANDIRI BERSAMA | 121,709,500 | 24.41 % | Belum dinilai |
225 | 2021 | Dinas Ketahanan Pangan dan Perikanan | Belanja Hibah Barang kepada Badan dan Lembaga Nirlaba, Sukarela Bersifat Sosial Kemasyarakatan (Pembangunan Lumbung Pangan dan Lantai Jemur) | Tender | Pekerjaan Konstruksi | 4154172 | 29532237 | APBD | 431,362,800 | 431,144,618 | 415,677,947 | 415,677,947 | 415,677,947 | 0 | 0 | 0 | 2021-09-17 | 2021-09-30 | 02.709.119.8-732.000 | CV. PUTRI GEMILANG | 15,684,853 | 3.64 % | Belum dinilai | |||
226 | 2021 | Dinas Pendidikan dan Kebudayaan | Pembangunan Ruang Guru/Kepala Sekolah/TU UPTD SMPN 4 Takisung | Tender | Pekerjaan Konstruksi | 4156172 | 29901347 | APBD | 263,752,216 | 263,587,000 | 262,071,000 | 262,071,000 | 261,471,000 | 0 | 0 | 0 | 2021-09-16 | 2021-09-29 | 02.709.132.1-732.000 | CV. KIBUNG ABADI | 1,681,216 | 0.64 % | Belum dinilai | |||
227 | 2021 | Dinas Pendidikan dan Kebudayaan | Pembangunan Laboratorium UPTD SMPN 8 Pelaihari | Tender | Pekerjaan Konstruksi | 4157172 | 28221478 | APBD | 364,674,971 | 364,424,955 | 361,966,900 | 361,966,900 | 361,526,000 | 0 | 0 | 0 | 2021-09-16 | 2021-09-29 | 74.995.810.4-732.000 | CV. SARABA DUA | 2,708,071 | 0.74 % | Belum dinilai | |||
228 | 2021 | Dinas Pendidikan dan Kebudayaan | Konsolidasi Pembangunan Gedung Perpustakaan Sekolah UPTD SMPN 3 Panyipatan dan Rehabilitasi sedang/berat Rumah Dinas Kepala Sekolah/Guru/Penjaga Sekolah UPTD SMPN 3 Panyipatan | Pengadaan Langsung | Pekerjaan Konstruksi | 4160172 | 28231558;28273780 | APBD | 396,258,863 | 364,424,955 | 362,450,000 | 362,450,000 | 362,120,000 | 0 | 0 | 0 | 2021-09-16 | 2021-09-29 | 72.032.397.1-732.000 | CV. PUTERI NUGRAHA | 33,808,863 | 8.53 % | Belum dinilai | |||
229 | 2021 | Dinas Pendidikan dan Kebudayaan | Pembangunan Ruang Guru/Kepala Sekolah/TU UPTD SDN 2 Ranggang | Tender | Pekerjaan Konstruksi | 4161172 | 29354107 | APBD | 250,727,415 | 250,721,000 | 248,812,700 | 247,000,000 | 248,268,600 | 0 | 0 | 0 | 2021-09-16 | 2021-09-29 | 02.172.423.2-732.000 | CV. REVIAMI | 1,914,715 | 0.76 % | Belum dinilai | |||
230 | 2021 | Dinas Pendidikan dan Kebudayaan | Pembangunan Lapangan Upacara UPTD SDN 1 Benua Raya | Tender | Pekerjaan Konstruksi | 4162172 | 28218234 | APBD | 248,227,408 | 248,095,000 | 245,837,400 | 245,837,400 | 245,837,400 | 0 | 0 | 0 | 2021-09-16 | 2021-09-29 | 70.623.092.7-732.000 | Syabilla azzahra | 2,390,008 | 0.96 % | Belum dinilai | |||
231 | 2021 | Dinas Pendidikan dan Kebudayaan | Pembangunan Pagar Sekolah UPTD SDN 1 Martadah | Tender | Pekerjaan Konstruksi | 4163172 | 28228150 | APBD | 342,576,080 | 342,526,000 | 341,209,100 | 341,244,138 | 340,914,000 | 0 | 0 | 0 | 2021-09-16 | 2021-09-29 | 02.521.867.8-732.000 | cv. tiga bersaudara | 1,366,980 | 0.4 % | Belum dinilai | |||
232 | 2021 | Dinas Pendidikan dan Kebudayaan | Penambahan ruang kelas sekolah UPTD SDN 3 Muara Kintap | Tender | Pekerjaan Konstruksi | 4164172 | 28275483 | APBD | 392,117,810 | 392,065,000 | 389,499,900 | 389,724,900 | 388,967,000 | 0 | 0 | 0 | 2021-09-16 | 2021-09-29 | 02.660.122.9-732.000 | CV. FAJAR PRATAMA | 2,617,910 | 0.67 % | Belum dinilai | |||
233 | 2021 | Dinas Kesehatan | Belanja makan minum pasien | Tender | Jasa Lainnya | 4166172 | 29239434 | APBD | 1,125,000,000 | 229,500,000 | 229,245,000 | 229,245,000 | 228,888,000 | 0 | 0 | 0 | 2021-09-15 | 2021-09-25 | 92.261.618.0-732.000 | CV. CAHAYA MITRA PERKASA | 895,755,000 | 79.62 % | Belum dinilai | |||
234 | 2021 | Dinas Pendidikan dan Kebudayaan | Pembangunan Ruang Guru/Kepala Sekolah/TU UPTD SDN 3 Pandansari | Tender | Pekerjaan Konstruksi | 4167172 | 29354174 | APBD | 250,727,415 | 250,700,000 | 249,668,079 | 249,668,079 | 249,160,000 | 0 | 0 | 0 | 2021-09-16 | 2021-09-29 | 02.709.132.1-732.000 | CV. KIBUNG ABADI | 1,059,336 | 0.42 % | Belum dinilai | |||
235 | 2021 | Dinas Pendidikan dan Kebudayaan | Konsolidasi Rehabilitasi sedang/berat Ruang kelas sekolah UPTD SDN 1 Kintap Kecil,Rehabilitasi sedang/berat Rumah Dinas Kepala Sekolah/Guru/Penjaga Sekolah UPTDSDN 1 Kintap Kecil | Tender | Pekerjaan Konstruksi | 4168172 | 28234574;28252024 | APBD | 575,750,071 | 575,646,000 | 571,327,716 | 571,292,000 | 571,292,000 | 0 | 0 | 0 | 2021-09-16 | 2021-09-29 | 02.709.161.0-732.000 | CV. DELTA UTAMA | 4,422,355 | 0.77 % | Belum dinilai | |||
236 | 2021 | Dinas Pendidikan dan Kebudayaan | Konsolidasi Pembangunan Ruang Guru/Kepala Sekolah/TU UPTD SDN Sumber Mulia dan Pembangunan Pagar Sekolah UPTD SDN Sumber Mulia | Tender | Pekerjaan Konstruksi | 4169172 | 29354195;30024438 | APBD | 390,657,652 | 390,600,000 | 386,673,088 | 386,613,000 | 386,613,000 | 0 | 0 | 0 | 2021-09-16 | 2021-09-29 | 76.708.451.0-732.000 | CV Berkah Terang Rahmat | 3,984,564 | 1.02 % | Belum dinilai | |||
237 | 2021 | Dinas Koperasi, Usaha Kecil dan Perdagangan | pembangunan Toko/Los pasar Batakan | Tender | Pekerjaan Konstruksi | 4171172 | 29751712 | APBD | 233,420,000 | 220,334,690 | 0 | 0 | 0 | 0 | 0 | 0 | 2021-09-21 | 2021-10-06 | 233,420,000 | 100 % | Belum dinilai | |||||
238 | 2021 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi sedang/berat Gedung kantor | Tender | Pekerjaan Konstruksi | 4172172 | 28066128 | APBD | 421,400,052 | 421,293,000 | 419,920,000 | 419,920,000 | 419,370,000 | 0 | 0 | 0 | 2021-10-01 | 2021-10-13 | 92.898.532.4-732.000 | cv.amarta berkarya jaya | 1,480,052 | 0.35 % | Belum dinilai | |||
239 | 2021 | Dinas Tenaga Kerja dan Perindustrian | Pengadaan Mobil Angkutan Mobile Expo | Tender | Jasa Lainnya | 4173172 | 29937123 | APBD | 750,000,000 | 728,750,000 | 0 | 0 | 0 | 0 | 0 | 0 | 2021-10-01 | 2021-10-13 | 750,000,000 | 100 % | Belum dinilai | |||||
240 | 2021 | Dinas Tenaga Kerja dan Perindustrian | Belanja Hibah Barang kepada Badan dan Lembaga Nirlaba, Sukarela Dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar (DID) | Tender | Pengadaan Barang | 4174172 | 30006967 | APBD | 290,000,000 | 281,580,020 | 254,309,202 | 254,309,202 | 232,600,200 | 232,600,200 | 232,600,200 | 0 | 2021-10-05 | 2021-10-20 | 2021-11-03 | 74.065.891.9-543.000 | CV RUMAH MESIN | 74.065.891.9-543.000 | CV RUMAH MESIN | 35,690,798 | 12.31 % | Belum dinilai |
241 | 2021 | Dinas Kesehatan | Rehabilitasi Bangunan Rumah Sakit (Ruang Operasi Terpadu/MOT) | Tender | Jasa Lainnya | 4177172 | 30007542 | APBDP | 5,199,996,876 | 5,199,996,876 | 5,049,988,830 | 5,049,988,830 | 5,049,988,830 | 5,049,988,830 | 4,039,991,064 | 0 | 2021-10-01 | 2021-10-13 | 2021-11-09 | 95.601.296.7-801.000 | PT. Murti Adyatama Cipta | 95.601.296.7-801.000 | PT. Murti Adyatama Cipta | 150,008,046 | 2.88 % | Belum dinilai |
242 | 2021 | Dinas Kesehatan | Pengadaan genset beserta instalasinya | Tender Cepat | Pengadaan Barang | 4191172 | 30294568 | APBDP | 3,045,963,785 | 2,973,000,000 | 2,969,670,440 | 2,969,670,440 | 2,969,670,440 | 0 | 0 | 0 | 2021-10-27 | 2021-10-28 | 03.223.724.0-643.000 | CV Pratama Abadi Sejahtera | 76,293,345 | 2.5 % | Belum dinilai | |||
243 | 2021 | Dinas Kesehatan | Pengadaan genset beserta instalasinya | Tender Cepat | Pengadaan Barang | 4191172 | 30294568 | APBDP | 3,045,963,785 | 2,973,000,000 | 2,815,890,000 | 2,815,890,000 | 2,815,890,000 | 0 | 0 | 0 | 2021-10-27 | 2021-10-28 | 94.316.406.1-401.000 | PILAR PRATAMA. CV | 230,073,785 | 7.55 % | Belum dinilai | |||
244 | 2021 | Dinas Tenaga Kerja dan Perindustrian | Pengadaan Mobil Angkutan Mobile Expo | Tender Cepat | Pengadaan Barang | 4197172 | 30406802 | APBD | 750,000,000 | 583,000,000 | 582,000,000 | 582,000,000 | 582,000,000 | 582,000,000 | 0 | 0 | 2021-11-09 | 2021-11-10 | 2021-11-16 | 01.474.170.6-732.000 | PT. WIRA MEGAH PROFITAMAS | 01.474.170.6-732.000 | PT. WIRA MEGAH PROFITAMAS | 168,000,000 | 22.4 % | Belum dinilai |
245 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Modal Kendaraan Bermotor Khusus - Kendaraan Operasional PJU Skylift | Tender | Pengadaan Barang | 4201172 | 30328081 | APBDP | 1,710,500,000 | 1,705,000,000 | 1,693,000,000 | 1,693,000,000 | 1,693,000,000 | 1,691,000,000 | 423,250,000 | 0 | 2021-11-15 | 2021-11-26 | 2021-12-02 | 86.855.322.3-452.000 | Trijaya Multi Perkasa | 86.855.322.3-452.000 | Trijaya Multi Perkasa | 17,500,000 | 1.02 % | Belum dinilai |
246 | 2021 | Dinas Kesehatan | Pengadaan Mobil Ambulance RSUD KH Mansyur Kintap | Tender Cepat | Pengadaan Barang | 4218172 | 30574173 | APBD | 300,000,000 | 280,000,000 | 279,796,000 | 279,796,000 | 279,796,000 | 279,796,000 | 0 | 0 | 2021-11-25 | 2021-11-26 | 2021-12-01 | 01.878.998.2-731.000 | PT. MITRA MEGAH PROFITAMAS | 01.878.998.2-731.000 | PT. MITRA MEGAH PROFITAMAS | 20,204,000 | 6.73 % | Belum dinilai |
247 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Alat/Bahan untuk Kegiatan Kantor-Perabot Kantor - Kantong plastik limbah B3 medis | Tender Cepat | Pengadaan Barang | 4219172 | 30717806 | APBDP | 469,908,000 | 449,064,000 | 379,328,400 | 379,328,400 | 379,328,400 | 0 | 0 | 0 | 2021-12-01 | 2021-12-02 | 83.821.690.1-643.000 | CV. KUSUMA BERKAH | 90,579,600 | 19.28 % | Belum dinilai | |||
248 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Alat/Bahan untuk Kegiatan Kantor-Perabot Kantor - Kantong plastik limbah B3 medis | Tender Cepat | Pengadaan Barang | 4219172 | 30717806 | APBDP | 469,908,000 | 449,064,000 | 380,160,000 | 380,160,000 | 380,160,000 | 0 | 0 | 0 | 2021-12-01 | 2021-12-02 | 02.723.262.8-002.000 | CV MENTARI BUNGA LAISA | 89,748,000 | 19.1 % | Belum dinilai | |||
249 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Modal Kendaraan Bermotor Khusus - Mobil Box Pendingin Pengangkutan Limbah B3 Medis ke Jasa Pengolahan | Tender Cepat | Pengadaan Barang | 4220172 | 30377322 | APBDP | 300,000,000 | 299,970,000 | 299,750,000 | 299,750,000 | 299,750,000 | 299,750,000 | 0 | 0 | 2021-12-01 | 2021-12-02 | 2021-12-06 | 01.878.998.2-731.000 | PT. MITRA MEGAH PROFITAMAS | 01.878.998.2-731.000 | PT. MITRA MEGAH PROFITAMAS | 250,000 | 0.08 % | Belum dinilai |
250 | 2021 | Badan Pengelolaan Keuangan dan Aset Daerah | Belanja Modal Kendaraan Bermotor Angkutan Barang | Tender Cepat | Pengadaan Barang | 4221172 | 30685032 | APBDP | 1,484,487,999 | 1,419,600,000 | 1,418,700,000 | 1,418,700,000 | 1,418,700,000 | 0 | 0 | 0 | 2021-12-01 | 2021-12-02 | 01.474.170.6-732.000 | PT. WIRA MEGAH PROFITAMAS | 65,787,999 | 4.43 % | Belum dinilai | |||
251 | 2021 | Dinas Komunikasi, Informatika, Statistik dan Persandian | Belanja Peralatan Jaringan | Tender Cepat | Pengadaan Barang | 4222172 | 30707211 | APBDP | 335,799,967 | 285,450,000 | 237,490,000 | 237,490,000 | 237,490,000 | 237,490,000 | 0 | 0 | 2021-12-03 | 2021-12-03 | 2021-12-13 | 02.934.309.2-804.000 | CV. ROXY | 02.934.309.2-804.000 | CV. ROXY | 98,309,967 | 29.28 % | Belum dinilai |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembangunan Gedung kantor Camat Tambang Ulang | Tender | Pekerjaan Konstruksi | 3715172 | 26878850 | APBD | 3,186,414,000 | 3,186,334,867 | 3,170,925,586 | 3,170,925,586 | 3,168,180,000 | 3,168,180,000 | 0 | 0 | 2021-02-04 | 2021-02-22 | 2021-03-18 | 31.791.613.8-322.000 | PT. INSAN KHARISMA ABADI | 31.791.613.8-322.000 | PT. INSAN KHARISMA ABADI | 15,488,414 | 0.49 % | Belum dinilai |
2 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembangunan Gedung Kantor Camat Panyipatan | Tender | Pekerjaan Konstruksi | 3716172 | 26878696 | APBD | 3,216,906,000 | 3,216,588,562 | 3,168,339,733 | 3,168,339,733 | 3,165,514,000 | 3,165,514,000 | 0 | 0 | 2021-02-04 | 2021-02-22 | 2021-03-17 | 31.791.613.8-322.000 | PT. INSAN KHARISMA ABADI | 31.791.613.8-322.000 | PT. INSAN KHARISMA ABADI | 48,566,267 | 1.51 % | Belum dinilai |
3 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembangunan Gedung Kantor Camat Batu Ampar | Tender | Pekerjaan Konstruksi | 3717172 | 26878563 | APBD | 3,186,414,000 | 3,186,306,611 | 3,143,225,106 | 3,143,225,106 | 3,140,653,000 | 3,140,653,000 | 0 | 0 | 2021-02-04 | 2021-02-22 | 2021-03-18 | 01.124.888.7-731.000 | PT. TRIASA PUTRA ABADI | 01.124.888.7-731.000 | PT. TRIASA PUTRA ABADI | 43,188,894 | 1.36 % | Belum dinilai |
4 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Konsolidasi Pekerjaan Pengoptimalan SPAM IKK Pelaihari IPA Kap 20 lpd dan perluasan jaringan perpipaan IKK Bajuin (DDUBNUWSP) | Tender | Pekerjaan Konstruksi | 3726172 | 26973551 | APBD | 7,320,000,732 | 7,313,336,556 | 7,039,810,022 | 7,084,067,848 | 7,084,067,848 | 7,084,067,848 | 7,039,810,022 | 0 | 2021-04-26 | 2021-05-12 | 2021-05-28 | 31.693.768.9-731.000 | PT. PUTRA KALIMANTAN BERSATU | 31.693.768.9-731.000 | PT. PUTRA KALIMANTAN BERSATU | 280,190,710 | 3.83 % | Belum dinilai |
5 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Konsolidasi Pengoptimalan Jaringan Perpipaan Kec. Kurau dan Kec. Bumi Makmur (SPAM Regional Banjarbakula) | Tender | Pekerjaan Konstruksi | 3727172 | 26884450 | APBD | 8,300,000,830 | 8,296,619,583 | 8,111,517,072 | 8,111,517,072 | 8,111,517,072 | 8,111,517,072 | 8,111,517,072 | 0 | 2021-04-26 | 2021-05-12 | 2021-05-28 | 31.693.768.9-731.000 | PT. PUTRA KALIMANTAN BERSATU | 31.693.768.9-731.000 | PT. PUTRA KALIMANTAN BERSATU | 188,483,758 | 2.27 % | Belum dinilai |
6 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Penambahan Gedung Kantor Inspektorat Kabupaten Tanah Laut | Tender | Pekerjaan Konstruksi | 3728172 | 26924406 | APBD | 2,515,590,000 | 2,515,572,528 | 2,486,944,346 | 2,486,944,346 | 2,483,941,000 | 2,483,941,000 | 0 | 0 | 2021-02-04 | 2021-02-22 | 2021-03-15 | 01.124.865.5-731.000 | PT. PARTNER KEMENANGAN | 01.124.865.5-731.000 | PT. PARTNER KEMENANGAN | 28,645,654 | 1.14 % | Belum dinilai |
7 | 2021 | Badan Pengelolaan Keuangan dan Aset Daerah | Belanja Sewa Kendaraan Bermotor Angkutan Barang | Tender | Jasa Lainnya | 3731172 | 27048901 | APBD | 1,107,360,000 | 1,107,359,986 | 1,051,991,978 | 1,051,991,978 | 1,029,845,520 | 1,029,845,520 | 0 | 0 | 2020-12-17 | 2020-12-30 | 2021-01-11 | 01.357.583.2-046.000 | PT SERASI AUTORAYA | 01.357.583.2-046.000 | PT SERASI AUTORAYA | 55,368,022 | 5 % | Belum dinilai |
8 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembangunan Puskesmas Baru Desa Bentok Kampung Kecamatan Bati - Bati | Tender | Pekerjaan Konstruksi | 3732172 | 26924547 | APBD | 6,361,647,600 | 6,361,311,000 | 6,085,660,894 | 6,085,660,894 | 6,080,159,000 | 6,080,159,000 | 0 | 0 | 2021-02-04 | 2021-02-22 | 2021-03-15 | 02.614.268.7-731.000 | PT. KENCANA MURNI KARYA MANDIRI | 02.614.268.7-731.000 | PT. KENCANA MURNI KARYA MANDIRI | 275,986,706 | 4.34 % | Belum dinilai |
9 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembangunan Puskesmas Baru Desa Durian Bungkuk Kecamatan Batu Ampar | Tender | Pekerjaan Konstruksi | 3733172 | 26924613 | APBD | 6,361,647,600 | 6,361,527,000 | 6,118,310,698 | 6,118,310,698 | 6,112,807,000 | 6,112,807,000 | 0 | 0 | 2021-02-04 | 2021-02-22 | 2021-03-15 | 01.141.461.2-731.000 | PT. PELITA ANDIKA AMBAR LESTARI | 01.141.461.2-731.000 | PT. PELITA ANDIKA AMBAR LESTARI | 243,336,902 | 3.83 % | Belum dinilai |
10 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembangunan Gedung Dinas Kependudukan dan Pencatatan Sipil Kabupaten Tanah Laut | Tender | Pekerjaan Konstruksi | 3749172 | 26924235 | APBD | 3,298,218,000 | 3,298,051,000 | 3,158,777,806 | 3,277,275,000 | 3,277,275,000 | 3,277,275,000 | 0 | 0 | 2021-04-26 | 2021-05-12 | 2021-06-28 | 82.114.778.2-731.000 | PT. BANUA JAYA GROUP | 82.114.778.2-731.000 | PT. BANUA JAYA GROUP | 139,440,194 | 4.23 % | Belum dinilai |
11 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembangunan Gedung Command Center Dinas Komunikasi dan Informatika Kabupaten Tanah Laut | Tender | Pekerjaan Konstruksi | 3750172 | 26924143 | APBD | 3,415,500,000 | 3,413,794,342 | 3,356,798,449 | 3,356,798,449 | 3,353,490,000 | 3,353,490,000 | 0 | 0 | 2021-03-25 | 2021-04-07 | 2021-04-21 | 03.018.148.1-732.000 | PT. ADJI PERKASA | 03.018.148.1-732.000 | PT. ADJI PERKASA | 58,701,551 | 1.72 % | Belum dinilai |
12 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pengembangan Jaringan Distribusi dan Sambungan Rumah Desa Handil Babirik Kecamatan Bumi Makmur | Tender | Pekerjaan Konstruksi | 3754172 | 28465286 | APBD | 6,045,000,000 | 6,041,102,280 | 5,954,154,839 | 5,954,154,839 | 5,954,154,839 | 5,954,154,839 | 5,596,905,548 | 0 | 2021-04-26 | 2021-05-12 | 2021-05-28 | 90.162.951.9-731.000 | PT. BERKAT EMPAT SAUDARA | 90.162.951.9-731.000 | PT. BERKAT EMPAT SAUDARA | 90,845,162 | 1.5 % | Belum dinilai |
13 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembangunan Jembatan Bawah Sawo Kec. Jorong | Tender | Pekerjaan Konstruksi | 3790172 | 27541340 | APBD | 3,484,444,390 | 3,484,255,250 | 3,387,741,032 | 3,387,741,032 | 3,385,431,000 | 3,385,431,000 | 0 | 0 | 2021-04-28 | 2021-05-20 | 2021-06-03 | 01.124.402.7-731.000 | PT. HASRAT JAYA UTAMA | 01.124.402.7-731.000 | PT. HASRAT JAYA UTAMA | 96,703,358 | 2.78 % | Belum dinilai |
14 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Modal Gedung Laboratorium Lingkungan | Tender | Pekerjaan Konstruksi | 3791172 | 28815553 | APBD | 645,150,000 | 642,056,829 | 513,437,103 | 513,437,103 | 513,437,103 | 513,437,103 | 0 | 0 | 2021-04-01 | 2021-04-16 | 2021-04-29 | 03.282.508.5-732.000 | cv.tata laksana konstruksi | 03.282.508.5-732.000 | cv.tata laksana konstruksi | 131,712,897 | 20.42 % | Belum dinilai |
15 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembangunan Jembatan Sumber Mulia - Tajau Pecah Kec. Pelaihari | Tender | Pekerjaan Konstruksi | 3792172 | 27541719 | APBD | 3,911,111,050 | 3,911,098,167 | 3,826,227,124 | 3,826,227,124 | 3,823,498,000 | 3,823,498,000 | 0 | 0 | 2021-04-28 | 2021-05-20 | 2021-06-04 | 01.124.402.7-731.000 | PT. HASRAT JAYA UTAMA | 01.124.402.7-731.000 | PT. HASRAT JAYA UTAMA | 84,883,926 | 2.17 % | Belum dinilai |
16 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Penggantian Jembatan Trans 300 Kec. Jorong | Tender | Pekerjaan Konstruksi | 3793172 | 27546486 | APBD | 2,986,666,620 | 2,986,628,688 | 2,924,113,638 | 2,924,113,638 | 2,924,113,638 | 2,924,113,638 | 0 | 0 | 2021-04-28 | 2021-05-20 | 2021-06-04 | 01.860.696.2-731.000 | PT. SALSABILA ONIRESH NUSANTARA | 01.860.696.2-731.000 | PT. SALSABILA ONIRESH NUSANTARA | 62,552,982 | 2.09 % | Belum dinilai |
17 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Rehabilitasi Jalan Maluka Baulin - Tabanio Kec. Kurau | Tender | Pekerjaan Konstruksi | 3794172 | 27569799 | APBD | 4,899,400,000 | 4,899,015,359 | 4,757,898,547 | 4,757,898,547 | 4,755,395 | 4,755,395 | 0 | 0 | 2021-04-28 | 2021-05-20 | 2021-06-03 | 01.141.578.3-732.000 | PT. SARANA DOA BERSAMA | 01.141.578.3-732.000 | PT. SARANA DOA BERSAMA | 141,501,453 | 2.89 % | Belum dinilai |
18 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Rekonstruksi/Peningkatan Struktur Jalan Kintap - Bukit Mulya (Ruas No. 56) | Tender | Pekerjaan Konstruksi | 3795172 | 28521727 | APBD | 9,648,472,505 | 9,646,571,876 | 9,495,120,704 | 9,495,120,704 | 9,491,839,000 | 9,491,839,000 | 0 | 0 | 2021-05-18 | 2021-06-04 | 2021-06-21 | 80.925.190.3-731.000 | PT. CENDANA PRIMA PERKASA | 80.925.190.3-731.000 | PT. CENDANA PRIMA PERKASA | 153,351,801 | 1.59 % | Belum dinilai |
19 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Rekonstruksi/Peningkatan Struktur Jalan Lingkungan Desa Sumber Jaya (Ruas No. 348) | Tender | Pekerjaan Konstruksi | 3797172 | 28521744 | APBD | 5,095,307,494 | 5,094,278,535 | 5,083,460,202 | 5,083,460,202 | 5,080,970,000 | 5,080,970,000 | 0 | 0 | 2021-05-18 | 2021-06-04 | 2021-06-22 | 75.099.887.4-732.000 | PT. RADHIKA UTAMA JAYA | 75.099.887.4-732.000 | PT. RADHIKA UTAMA JAYA | 11,847,292 | 0.23 % | Belum dinilai |
20 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Rehabilitasi Gedung Kantor StafKODIM 1009/PLH | Tender | Pekerjaan Konstruksi | 3801172 | 26948172 | APBD | 943,740,000 | 943,629,000 | 919,501,000 | 922,215,000 | 918,038,000 | 918,038,000 | 0 | 0 | 2021-04-26 | 2021-05-12 | 2021-05-28 | 72.078.255.6-731.000 | CV. RINKEI KHAL NUSANTARA | 72.078.255.6-731.000 | CV. RINKEI KHAL NUSANTARA | 24,239,000 | 2.57 % | Belum dinilai |
21 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembangunan Pos Penjagaan TNI AL Desa Tabanio Kab. Tanah Laut | Tender | Pekerjaan Konstruksi | 3802172 | 26948351 | APBD | 335,000,000 | 334,722,000 | 328,025,498 | 329,488,000 | 329,488,000 | 329,488,000 | 0 | 0 | 2021-04-26 | 2021-05-12 | 2021-05-28 | 01.961.550.9-732.000 | CV.WULAN | 01.961.550.9-732.000 | CV.WULAN | 6,974,502 | 2.08 % | Belum dinilai |
22 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembangunan Fasilitas Pelayanan WBP Rutan Kelas II B Pelaihari dan Rehabilitasi Rumah Dinas Kepala Rutan | Tender | Pekerjaan Konstruksi | 3803172 | 26948289 | APBD | 1,206,810,163 | 1,206,220,000 | 1,181,609,446 | 1,181,609,446 | 1,180,509,000 | 1,180,509,000 | 0 | 0 | 2021-04-26 | 2021-05-12 | 2021-05-28 | 66.157.544.9-732.000 | ANANDA NINA PRATAMA | 66.157.544.9-732.000 | ANANDA NINA PRATAMA | 25,200,717 | 2.09 % | Belum dinilai |
23 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembangunan Gedung Aula/ Alsintan Dinas Tanaman Pangan Holtikultura dan Perkebunan Kabupaten Tanah Laut | Tender | Pekerjaan Konstruksi | 3804172 | 26924070 | APBD | 1,016,400,000 | 1,016,380,000 | 997,041,841 | 997,110,000 | 995,730,000 | 995,730,000 | 0 | 0 | 2021-04-26 | 2021-05-12 | 2021-05-28 | 72.078.255.6-731.000 | CV. RINKEI KHAL NUSANTARA | 72.078.255.6-731.000 | CV. RINKEI KHAL NUSANTARA | 19,358,159 | 1.9 % | Belum dinilai |
24 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pelebaran Jalan Desa Sungai Bakar Rt.01 - Rt. 07 Kec. Bajuin | Tender | Pekerjaan Konstruksi | 3811172 | 27538692 | APBD | 898,640,000 | 898,265,244 | 887,800,410 | 887,800,410 | 887,800,410 | 887,800,410 | 887,800,410 | 0 | 2021-04-28 | 2021-05-20 | 2021-06-04 | 02.660.197.1-732.000 | CV. REPAI | 02.660.197.1-732.000 | CV. REPAI | 10,839,590 | 1.21 % | Belum dinilai |
25 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembangunan Jalan Desa Bati-Bati RT. 1 Kec. Bati-Bati | Tender | Pekerjaan Konstruksi | 3812172 | 27538830 | APBD | 494,760,000 | 494,197,358 | 488,603,590 | 488,603,590 | 488,603,590 | 488,603,590 | 488,603,590 | 0 | 2021-04-28 | 2021-05-20 | 2021-06-03 | 80.948.780.4-732.000 | CV.ANUGRAH JAYA PRATAMA | 80.948.780.4-732.000 | CV.ANUGRAH JAYA PRATAMA | 6,156,410 | 1.24 % | Belum dinilai |
26 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pengaspalan Jalan Desa Gunung Makmur Rt.01,03 Kec. Takisung | Tender | Pekerjaan Konstruksi | 3813172 | 27549218 | APBD | 608,880,000 | 608,113,197 | 601,654,548 | 601,654,548 | 601,654,548 | 601,654,548 | 601,654,548 | 0 | 2021-04-28 | 2021-05-20 | 2021-06-03 | 80.948.780.4-732.000 | CV.ANUGRAH JAYA PRATAMA | 80.948.780.4-732.000 | CV.ANUGRAH JAYA PRATAMA | 7,225,452 | 1.19 % | Belum dinilai |
27 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pengaspalan Jalan Desa Kintap Jl. Kasih Dangsanak Kec. Kintap | Tender | Pekerjaan Konstruksi | 3814172 | 27549753 | APBD | 599,400,000 | 599,390,131 | 580,629,764 | 580,629,764 | 580,629,764 | 580,629,764 | 0 | 0 | 2021-04-28 | 2021-05-21 | 2021-06-07 | 72.831.285.1-732.000 | CV. Anindya | 72.831.285.1-732.000 | CV. Anindya | 18,770,236 | 3.13 % | Belum dinilai |
28 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pengaspalan Jalan Desa Panggung Baru Jl. Keramat Kec. Pelaihari | Tender | Pekerjaan Konstruksi | 3815172 | 27550016 | APBD | 466,400,000 | 466,209,274 | 455,811,168 | 455,811,168 | 455,811,168 | 455,811,168 | 455,811,168 | 0 | 2021-04-28 | 2021-05-21 | 2021-06-04 | 31.683.055.3-732.000 | CV.RINALDI | 31.683.055.3-732.000 | CV.RINALDI | 10,588,832 | 2.27 % | Belum dinilai |
29 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pengaspalan Jalan Desa Tajau Mulya RT. 4 Kec. Batu Ampar | Tender | Pekerjaan Konstruksi | 3816172 | 27550596 | APBD | 399,200,000 | 398,271,868 | 393,033,381 | 393,033,381 | 392,715,000 | 392,715,000 | 0 | 0 | 2021-04-28 | 2021-05-21 | 2021-06-07 | 03.063.181.6-731.000 | CV. ARTA UTAMA | 03.063.181.6-731.000 | CV. ARTA UTAMA | 6,166,619 | 1.54 % | Belum dinilai |
30 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Jalan Desa Batu Ampar Rt. 3 Kec. Batu Ampar | Tender | Pekerjaan Konstruksi | 3817172 | 27569996 | APBD | 1,949,360,000 | 1,948,674,492 | 1,928,907,486 | 1,928,907,486 | 1,928,907,486 | 1,928,907,486 | 1,928,907,486 | 0 | 2021-04-28 | 2021-05-20 | 2021-06-04 | 02.709.161.0-732.000 | CV. DELTA UTAMA | 02.709.161.0-732.000 | CV. DELTA UTAMA | 20,452,514 | 1.05 % | Belum dinilai |
31 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembangunan Sarana dan Prasarana Infrastruktur di Lingkungan Asrama Polres Tanah Laut | Tender | Pekerjaan Konstruksi | 3818172 | 29099973 | APBD | 3,200,000,000 | 3,199,280,000 | 3,119,387,499 | 3,127,630,000 | 3,118,830,000 | 3,118,830,000 | 0 | 0 | 2021-04-29 | 2021-05-12 | 2021-06-04 | 02.215.595.6-732.000 | PT. CITRA MEGAH UTAMA | 02.215.595.6-732.000 | PT. CITRA MEGAH UTAMA | 80,612,501 | 2.52 % | Belum dinilai |
32 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Jalan Desa Kandangan Lama Kec. Panyipatan | Tender | Pekerjaan Konstruksi | 3819172 | 27570274 | APBD | 646,040,000 | 645,999,486 | 638,761,631 | 638,761,631 | 638,761,631 | 638,761,631 | 638,761,631 | 0 | 2021-04-28 | 2021-05-20 | 2021-06-03 | 75.004.987.6-732.000 | CV. 3R | 75.004.987.6-732.000 | CV. 3R | 7,278,369 | 1.13 % | Belum dinilai |
33 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Jalan Desa Ketapang Kec. Bajuin | Tender | Pekerjaan Konstruksi | 3820172 | 27598618 | APBD | 899,160,000 | 899,100,682 | 888,834,488 | 888,834,488 | 888,834,488 | 888,834,488 | 888,834,488 | 0 | 2021-04-28 | 2021-05-20 | 2021-06-03 | 81.299.631.2-732.000 | CV.RICKY PERDANA PERTAMA | 81.299.631.2-732.000 | CV.RICKY PERDANA PERTAMA | 10,325,512 | 1.15 % | Belum dinilai |
34 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Jalan Desa Liang Anggang Kec. Bati-Bati | Tender | Pekerjaan Konstruksi | 3821172 | 27598711 | APBD | 494,760,000 | 494,682,508 | 489,139,937 | 489,139,937 | 489,139,937 | 489,139,937 | 489,139,937 | 0 | 2021-04-28 | 2021-05-21 | 2021-06-04 | 81.299.631.2-732.000 | CV.RICKY PERDANA PERTAMA | 81.299.631.2-732.000 | CV.RICKY PERDANA PERTAMA | 5,620,063 | 1.14 % | Belum dinilai |
35 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Jalan Desa Tanjung Kec. Bajuin | Tender | Pekerjaan Konstruksi | 3822172 | 27619700 | APBD | 999,460,000 | 999,031,254 | 967,776,966 | 967,776,966 | 967,776,966 | 967,776,966 | 0 | 0 | 2021-04-28 | 2021-05-21 | 2021-06-04 | 01.124.716.0-731.000 | CV. DUA MAS | 01.124.716.0-731.000 | CV. DUA MAS | 31,683,034 | 3.17 % | Belum dinilai |
36 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Jalan Desa Ujung Kec. Bati-Bati | Tender | Pekerjaan Konstruksi | 3823172 | 27619785 | APBD | 494,760,000 | 494,256,839 | 488,507,594 | 488,507,594 | 488,507,594 | 488,507,594 | 488,507,594 | 0 | 2021-04-28 | 2021-05-21 | 2021-06-04 | 02.709.161.0-732.000 | CV. DELTA UTAMA | 02.709.161.0-732.000 | CV. DELTA UTAMA | 6,252,406 | 1.26 % | Belum dinilai |
37 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Jalan Dusun III Tembus Dusun IV Desa Tebing Siring Kec. Bajuin | Tender | Pekerjaan Konstruksi | 3824172 | 27619816 | APBD | 798,860,000 | 798,319,006 | 789,563,829 | 789,563,829 | 789,563,829 | 789,563,829 | 789,563,829 | 0 | 2021-04-28 | 2021-05-21 | 2021-06-04 | 31.683.055.3-732.000 | CV.RINALDI | 31.683.055.3-732.000 | CV.RINALDI | 9,296,171 | 1.16 % | Belum dinilai |
38 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Jalan Lingkungan Dusun I s.d IV Desa Bukit Mulya Kec. Kintap | Tender | Pekerjaan Konstruksi | 3825172 | 27620824 | APBD | 600,000,000 | 599,963,712 | 578,998,735 | 578,998,735 | 578,998,735 | 578,998,735 | 0 | 0 | 2021-04-28 | 2021-05-21 | 2021-06-07 | 66.157.544.9-732.000 | ANANDA NINA PRATAMA | 66.157.544.9-732.000 | ANANDA NINA PRATAMA | 21,001,265 | 3.5 % | Belum dinilai |
39 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Rencana Pencegahan dan Peningkatan Kualitas Permukiman Kumuh Perkotaan (RP2KPKP) | Tender | Jasa Konsultansi Badan Usaha Non Konstruksi | 3828172 | 28186805 | APBD | 1,000,000,000 | 1,000,000,000 | 950,015,000 | 950,015,000 | 948,655,000 | 0 | 0 | 0 | 2021-04-12 | 2021-05-28 | 01.118.674.9-441.000 | PT. HEGAR DAYA | 49,985,000 | 5 % | Belum dinilai | |||
40 | 2021 | Dinas Pariwisata | Pembuatan Jembatan obyek wisata Mangrove Desa Tanjung Dewa | Tender | Pekerjaan Konstruksi | 3829172 | 27841585 | APBD | 577,699,999 | 577,452,899 | 574,034,571 | 574,034,571 | 573,429,000 | 0 | 0 | 0 | 2021-06-28 | 2021-07-14 | 72.657.370.2-732.000 | CV.KEMBAR UTAMA | 3,665,428 | 0.63 % | Belum dinilai | |||
41 | 2021 | Dinas Pariwisata | Pembangunan Menara pandang Destinasi Gunung Kayangan | Tender | Pekerjaan Konstruksi | 3830172 | 27840022 | APBD | 1,426,000,001 | 1,425,359,799 | 1,414,585,884 | 1,414,585,884 | 1,413,485,000 | 0 | 0 | 0 | 2021-06-28 | 2021-07-14 | 92.898.532.4-732.000 | cv.amarta berkarya jaya | 11,414,117 | 0.8 % | Belum dinilai | |||
42 | 2021 | Dinas Pariwisata | Pembangunan Food Court Destinasi AIr Terjun Bajuin | Tender | Pekerjaan Konstruksi | 3831172 | 27837105 | APBD | 369,600,000 | 369,329,938 | 364,401,450 | 364,401,450 | 364,401,450 | 0 | 0 | 0 | 2021-06-28 | 2021-07-14 | 76.853.698.9-732.000 | CV BERKAT USAHA MANDIRI | 5,198,550 | 1.41 % | Belum dinilai | |||
43 | 2021 | Dinas Kesehatan | Pembangunan Pustu Batilai | Tender | Pekerjaan Konstruksi | 3834172 | 28975723 | APBD | 368,445,000 | 366,741,504 | 362,867,689 | 362,867,689 | 362,867,689 | 362,867,689 | 0 | 0 | 2021-04-19 | 2021-05-04 | 2021-05-19 | 90.511.879.0-732.000 | CV. ULFAH | 90.511.879.0-732.000 | CV. ULFAH | 5,577,311 | 1.51 % | Belum dinilai |
44 | 2021 | Dinas Kesehatan | Pembangunan Poskesdes Tajau Pecah | Tender | Pekerjaan Konstruksi | 3835172 | 28975665 | APBD | 254,100,000 | 253,389,974 | 248,265,180 | 248,265,180 | 248,265,180 | 248,265,180 | 248,265,180 | 0 | 2021-04-19 | 2021-05-04 | 2021-05-19 | 03.169.385.6-734.000 | CV. ZABRINA PUTRI MANDIRI | 03.169.385.6-734.000 | CV. ZABRINA PUTRI MANDIRI | 5,834,820 | 2.3 % | Belum dinilai |
45 | 2021 | Dinas Kesehatan | Peningkatan Mutu Dinas Kesehatan | Tender | Pekerjaan Konstruksi | 3836172 | 28975848 | APBD | 670,824,000 | 667,909,028 | 657,950,519 | 657,950,519 | 657,950,519 | 657,950,519 | 328,975,260 | 0 | 2021-04-19 | 2021-05-04 | 2021-05-20 | 66.157.544.9-732.000 | ANANDA NINA PRATAMA | 66.157.544.9-732.000 | ANANDA NINA PRATAMA | 12,873,481 | 1.92 % | Belum dinilai |
46 | 2021 | Dinas Kesehatan | Pembangunan Aula Puskesmas Tambang Ulang | Tender | Pekerjaan Konstruksi | 3837172 | 28975796 | APBD | 498,036,000 | 496,054,544 | 490,259,270 | 490,259,270 | 490,259,270 | 490,259,270 | 490,259,270 | 0 | 2021-04-19 | 2021-05-04 | 2021-05-19 | 01.860.233.4-732.000 | KARYA ABADI | 01.860.233.4-732.000 | KARYA ABADI | 7,776,731 | 1.56 % | Belum dinilai |
47 | 2021 | Dinas Kesehatan | Pembangunan Pustu Bawah Layung | Tender | Pekerjaan Konstruksi | 3838172 | 28975697 | APBD | 368,445,000 | 366,775,843 | 359,393,736 | 359,393,736 | 359,393,736 | 359,393,736 | 179,696,868 | 0 | 2021-04-19 | 2021-05-04 | 2021-05-20 | 03.138.523.0-732.000 | CV.HBP(Haji Budi Pelaihari) | 03.138.523.0-732.000 | CV.HBP(Haji Budi Pelaihari) | 9,051,264 | 2.46 % | Belum dinilai |
48 | 2021 | Dinas Kesehatan | Pembangunan Poskesdes Pasir Putih | Tender | Pekerjaan Konstruksi | 3839172 | 28975630 | APBD | 254,100,000 | 252,583,424 | 247,254,469 | 247,639,400 | 247,639,400 | 247,639,400 | 247,254,469 | 0 | 2021-04-19 | 2021-05-04 | 2021-05-20 | 86.386.465.8-732.000 | CV MITRA USAHA SUKSES | 86.386.465.8-732.000 | CV MITRA USAHA SUKSES | 6,845,531 | 2.69 % | Belum dinilai |
49 | 2021 | Dinas Kesehatan | Pembangunan Aula Puskesmas Bumi Makmur | Tender | Pekerjaan Konstruksi | 3840172 | 28975779 | APBD | 406,560,000 | 405,697,761 | 401,513,328 | 401,513,328 | 400,135,543 | 400,135,543 | 400,135,543 | 0 | 2021-04-19 | 2021-05-04 | 2021-05-20 | 02.709.163.6-732.000 | KARYA DILLA ADITAMA | 02.709.163.6-732.000 | KARYA DILLA ADITAMA | 5,046,672 | 1.24 % | Belum dinilai |
50 | 2021 | Dinas Kesehatan | Konsolidasi Pembangunan Rumah Dinas Dokter RS KH Mansyur 1, RS KH Mansyur 2, dan RS KH Mansyur 3 | Tender | Pekerjaan Konstruksi | 3841172 | 28975571 | APBD | 1,067,220,000 | 1,062,451,790 | 1,032,351,760 | 1,032,351,760 | 1,031,345,000 | 1,031,345,000 | 0 | 0 | 2021-04-19 | 2021-05-04 | 2021-05-20 | 86.381.875.3-732.000 | CV MAJU KARYA BERSAMA | 86.381.875.3-732.000 | CV MAJU KARYA BERSAMA | 34,868,240 | 3.27 % | Belum dinilai |
51 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Rehabilitasi Jaringan Irigasi D.I. Banua Lawas Kecamatan Takisung | Tender | Pekerjaan Konstruksi | 3861172 | 29207584 | APBD | 1,299,999,958 | 1,299,725,000 | 1,273,009,067 | 1,273,009,067 | 1,273,009,067 | 1,273,009,067 | 1,272,129,000 | 0 | 2021-04-20 | 2021-05-19 | 2021-06-09 | 86.381.875.3-732.000 | CV MAJU KARYA BERSAMA | 86.381.875.3-732.000 | CV MAJU KARYA BERSAMA | 26,990,891 | 2.08 % | Belum dinilai |
52 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Rehabilitasi Jaringan Irigasi D.I. Sukaramah Kecamatan Panyipatan | Tender | Pekerjaan Konstruksi | 3866172 | 29207440 | APBD | 2,599,999,917 | 2,599,945,000 | 2,546,610,200 | 2,546,610,200 | 2,544,520,000 | 2,544,520,000 | 2,544,520,000 | 0 | 2021-04-20 | 2021-05-19 | 2021-06-03 | 95.691.082.2-732.000 | PT MANDIRI PERKASA PLANT | 95.691.082.2-732.000 | PT MANDIRI PERKASA PLANT | 53,389,717 | 2.05 % | Belum dinilai |
53 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Rehabilitasi Jaringan Irigasi D.I. Kunyit Kecamatan Bajuin (DAK) | Tender | Pekerjaan Konstruksi | 3867172 | 29207483 | APBD | 1,199,999,962 | 1,199,896,000 | 1,185,575,285 | 1,186,300,614 | 1,185,200,000 | 1,185,200,000 | 0 | 0 | 2021-04-20 | 2021-05-19 | 2021-06-04 | 90.480.522.3-732.000 | CV. IDZMA | 90.480.522.3-732.000 | CV. IDZMA | 14,424,677 | 1.2 % | Belum dinilai |
54 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Penambah Daya Tahan Tubuh | Tender | Jasa Lainnya | 3871172 | 28178203 | APBD | 904,365,000 | 674,696,000 | 673,117,500 | 673,117,500 | 671,990,000 | 671,990,000 | 671,990,000 | 0 | 2021-04-23 | 2021-05-06 | 2021-05-20 | 86.495.751.9-732.000 | CV. ZAINA MADINA | 86.495.751.9-732.000 | CV. ZAINA MADINA | 231,247,500 | 25.57 % | Belum dinilai |
55 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pengaspalan Jalan Poros Desa Mekarsari Jl. Pantai Love Sari RT. 05 Kec. Kintap | Tender | Pekerjaan Konstruksi | 3874172 | 27569700 | APBD | 599,400,000 | 598,863,943 | 588,991,957 | 588,991,957 | 588,410,000 | 588,410,000 | 0 | 0 | 2021-06-24 | 2021-07-14 | 2021-07-26 | 86.386.465.8-732.000 | CV MITRA USAHA SUKSES | 86.386.465.8-732.000 | CV MITRA USAHA SUKSES | 10,408,043 | 1.74 % | Belum dinilai |
56 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pengaspalan Jalan Poros Desa Sebamban Baru Kec. Kintap | Tender | Pekerjaan Konstruksi | 3875172 | 27569707 | APBD | 599,400,000 | 598,391,343 | 587,116,343 | 587,116,343 | 586,510,000 | 586,510,000 | 0 | 0 | 2021-06-24 | 2021-07-13 | 2021-07-26 | 90.695.223.9-732.000 | CV.AWI BATAKAN UTAMA | 90.695.223.9-732.000 | CV.AWI BATAKAN UTAMA | 12,283,657 | 2.05 % | Belum dinilai |
57 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Jalan Desa Kebun Raya Kec. Kintap | Tender | Pekerjaan Konstruksi | 3876172 | 27598533 | APBD | 600,000,000 | 599,883,561 | 590,831,575 | 590,831,575 | 590,237,000 | 590,237,000 | 0 | 0 | 2021-06-24 | 2021-07-14 | 2021-07-26 | 86.380.418.3-732.000 | CV BERSAMA KAWAN SEJAHTERA | 86.380.418.3-732.000 | CV BERSAMA KAWAN SEJAHTERA | 9,168,425 | 1.53 % | Belum dinilai |
58 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Jalan Desa Pandan Sari Kec. Kintap | Tender | Pekerjaan Konstruksi | 3877172 | 27619474 | APBD | 399,600,000 | 398,989,343 | 393,617,590 | 393,617,590 | 393,214,881 | 393,214,881 | 0 | 0 | 2021-06-24 | 2021-07-14 | 2021-07-26 | 86.380.418.3-732.000 | CV BERSAMA KAWAN SEJAHTERA | 86.380.418.3-732.000 | CV BERSAMA KAWAN SEJAHTERA | 5,982,410 | 1.5 % | Belum dinilai |
59 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Jalan Lingkungan Desa Sumber Jaya Dusun 1,2,3 Kec. Kintap | Tender | Pekerjaan Konstruksi | 3879172 | 27620657 | APBD | 600,000,000 | 599,909,942 | 595,867,442 | 595,867,442 | 595,308,205 | 595,308,205 | 0 | 0 | 2021-06-24 | 2021-07-14 | 2021-07-26 | 90.480.522.3-732.000 | CV. IDZMA | 90.480.522.3-732.000 | CV. IDZMA | 4,132,558 | 0.69 % | Belum dinilai |
60 | 2021 | Dinas Pariwisata | Pembangunan Dermaga di Destinasi Pantai Batakan Baru | Tender | Pekerjaan Konstruksi | 3880172 | 27841334 | APBD | 1,061,750,000 | 1,060,821,825 | 1,056,077,676 | 1,056,077,676 | 1,054,620,000 | 0 | 0 | 0 | 2021-06-28 | 2021-07-14 | 75.129.882.9-731.000 | PT. ARTA ANUGERAH ADHI PERKASA | 5,672,324 | 0.53 % | Belum dinilai | |||
61 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Penggantian Box Culvert Desa Ambungan RT. 05 Kec. Pelaihari | Tender | Pekerjaan Konstruksi | 3881172 | 27543121 | APBD | 466,666,667 | 466,017,492 | 461,303,992 | 461,303,992 | 460,858,000 | 460,858,000 | 0 | 0 | 2021-06-24 | 2021-07-14 | 2021-07-26 | 90.695.174.4-732.000 | CV.RAMA HARAPAN BUNDA | 90.695.174.4-732.000 | CV.RAMA HARAPAN BUNDA | 5,362,675 | 1.15 % | Belum dinilai |
62 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Penggantian Box Culvert Desa Galam RT 06 Kec. Bajuin | Tender | Pekerjaan Konstruksi | 3882172 | 27543810 | APBD | 300,000,000 | 299,973,353 | 296,335,198 | 296,335,198 | 295,862,000 | 295,862,000 | 0 | 0 | 2021-06-24 | 2021-07-14 | 2021-07-26 | 76.853.698.9-732.000 | CV BERKAT USAHA MANDIRI | 76.853.698.9-732.000 | CV BERKAT USAHA MANDIRI | 3,664,802 | 1.22 % | Belum dinilai |
63 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Penggantian Box Culvert Desa Gunung Mas RT. 7 Kec. Batu Ampar | Tender | Pekerjaan Konstruksi | 3883172 | 27544040 | APBD | 500,000,000 | 499,511,885 | 495,804,885 | 495,804,885 | 495,395,000 | 495,395,000 | 0 | 0 | 2021-06-24 | 2021-07-13 | 2021-07-26 | 90.511.879.0-732.000 | CV. ULFAH | 90.511.879.0-732.000 | CV. ULFAH | 4,195,115 | 0.84 % | Belum dinilai |
64 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Penggantian Box Culvert Desa Desa Padang RT.9 Kec. Bati-Bati | Tender | Pekerjaan Konstruksi | 3884172 | 27544452 | APBD | 233,333,333 | 233,255,924 | 226,123,608 | 226,123,608 | 225,874,000 | 225,874,000 | 0 | 0 | 2021-06-24 | 2021-07-13 | 2021-07-26 | 02.709.123.0-732.000 | CV. MEDIA MULTI MITRA | 02.709.123.0-732.000 | CV. MEDIA MULTI MITRA | 7,209,725 | 3.09 % | Belum dinilai |
65 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Penggantian Box Culvert Desa Pantai Linuh 2 Kec. Batu Ampar | Tender | Pekerjaan Konstruksi | 3885172 | 27544603 | APBD | 400,000,000 | 399,981,818 | 396,055,574 | 396,055,574 | 395,538,000 | 395,538,000 | 0 | 0 | 2021-06-24 | 2021-07-14 | 2021-07-26 | 86.381.875.3-732.000 | CV MAJU KARYA BERSAMA | 86.381.875.3-732.000 | CV MAJU KARYA BERSAMA | 3,944,426 | 0.99 % | Belum dinilai |
66 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Penggantian Box Culvert Desa Pemalongan RT.03 Kec. Bajuin | Tender | Pekerjaan Konstruksi | 3886172 | 27545162 | APBD | 500,000,000 | 499,455,477 | 494,950,977 | 494,950,977 | 494,574,000 | 494,574,000 | 0 | 0 | 2021-06-24 | 2021-07-13 | 2021-07-26 | 90.695.174.4-732.000 | CV.RAMA HARAPAN BUNDA | 90.695.174.4-732.000 | CV.RAMA HARAPAN BUNDA | 5,049,023 | 1.01 % | Belum dinilai |
67 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Penggantian Box Culvert Desa Sungai Bakau RT 2,3 Kec. Kurau | Tender | Pekerjaan Konstruksi | 3887172 | 27545827 | APBD | 300,000,000 | 299,984,103 | 296,082,213 | 296,082,213 | 295,790,000 | 295,790,000 | 0 | 0 | 2021-06-24 | 2021-07-14 | 2021-07-26 | 86.381.875.3-732.000 | CV MAJU KARYA BERSAMA | 86.381.875.3-732.000 | CV MAJU KARYA BERSAMA | 3,917,787 | 1.31 % | Belum dinilai |
68 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Penggantian Box Culvert Desa Tirtajaya Rt. 02 Kec. Bajuin | Tender | Pekerjaan Konstruksi | 3888172 | 27545924 | APBD | 500,000,000 | 499,603,564 | 495,440,064 | 495,440,064 | 494,287,000 | 494,287,000 | 0 | 0 | 2021-06-24 | 2021-07-13 | 2021-07-26 | 72.657.370.2-732.000 | CV.KEMBAR UTAMA | 72.657.370.2-732.000 | CV.KEMBAR UTAMA | 4,559,936 | 0.91 % | Belum dinilai |
69 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Penggantian Jembatan Desa Bumi Asih Kec. Panyipatan | Tender | Pekerjaan Konstruksi | 3890172 | 27546284 | APBD | 244,444,444 | 244,396,951 | 236,871,824 | 236,871,824 | 236,143,000 | 236,143,000 | 0 | 0 | 2021-06-24 | 2021-07-13 | 2021-07-26 | 02.709.123.0-732.000 | CV. MEDIA MULTI MITRA | 02.709.123.0-732.000 | CV. MEDIA MULTI MITRA | 7,572,620 | 3.1 % | Belum dinilai |
70 | 2021 | Dinas Kesehatan | Penambahan Gedung Puskesmas Tirta Jaya (DAK) | Tender | Pekerjaan Konstruksi | 3891172 | 29250764 | APBD | 3,351,199,998 | 3,341,550,218 | 3,324,388,321 | 3,324,388,321 | 3,321,473,000 | 3,321,473,000 | 0 | 0 | 2021-05-06 | 2021-05-26 | 2021-06-10 | 02.614.268.7-731.000 | PT. KENCANA MURNI KARYA MANDIRI | 02.614.268.7-731.000 | PT. KENCANA MURNI KARYA MANDIRI | 26,811,677 | 0.8 % | Belum dinilai |
71 | 2021 | Dinas Kesehatan | Penambahan Gedung Puskesmas Tanjung Habulu (DAK) | Tender | Pekerjaan Konstruksi | 3892172 | 29247295 | APBD | 3,280,499,998 | 3,270,295,526 | 3,248,549,602 | 3,248,549,602 | 3,245,635,000 | 3,245,635,000 | 3,245,635,000 | 0 | 2021-05-06 | 2021-05-26 | 2021-06-08 | 02.707.565.4-322.000 | PT ASRI FARIZ JAYA | 02.707.565.4-322.000 | PT ASRI FARIZ JAYA | 31,950,396 | 0.97 % | Belum dinilai |
72 | 2021 | Dinas Kesehatan | Penambahan Gedung Puskesmas Pelaihari (DAK) | Tender | Pekerjaan Konstruksi | 3893172 | 29247127 | APBD | 2,321,399,996 | 2,314,810,783 | 2,300,110,421 | 2,300,110,421 | 2,298,110,000 | 2,298,110,000 | 0 | 0 | 2021-05-06 | 2021-05-26 | 2021-06-10 | 72.509.231.6-732.000 | cv.shafira | 72.509.231.6-732.000 | cv.shafira | 21,289,575 | 0.92 % | Belum dinilai |
73 | 2021 | Dinas Kesehatan | Penambahan Gedung Puskesmas Sungai Riam (DAK) | Tender | Pekerjaan Konstruksi | 3894172 | 29247241 | APBD | 3,052,084,099 | 3,042,139,844 | 3,006,950,145 | 3,006,950,145 | 3,004,917,000 | 3,004,917,000 | 3,004,917,000 | 0 | 2021-05-06 | 2021-05-26 | 2021-06-10 | 95.691.082.2-732.000 | PT MANDIRI PERKASA PLANT | 95.691.082.2-732.000 | PT MANDIRI PERKASA PLANT | 45,133,954 | 1.48 % | Belum dinilai |
74 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembuatan Siring Pengaman Sungai Desa Banyu Irang Kecamatan Bati-Bati | Tender | Pekerjaan Konstruksi | 3895172 | 27447510 | APBD | 2,999,999,200 | 2,999,998,329 | 2,948,491,781 | 2,948,491,781 | 2,945,191,000 | 2,945,191,000 | 2,945,191,000 | 0 | 2021-05-04 | 2021-05-19 | 2021-06-03 | 02.613.936.0-731.000 | CITRA INTAN KURNIA,PT | 02.613.936.0-731.000 | CITRA INTAN KURNIA,PT | 51,507,419 | 1.72 % | Belum dinilai |
75 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembuatan Siring Pengaman Sungai Desa Kintap Kecil RT. 10 Kecamatan Kintap | Tender | Pekerjaan Konstruksi | 3896172 | 27450341 | APBD | 517,799,938 | 517,712,000 | 515,890,223 | 515,890,223 | 515,890,223 | 515,890,223 | 515,340,000 | 0 | 2021-05-04 | 2021-05-19 | 2021-06-04 | 90.692.105.1-732.000 | CV. DEWI BANJAR MULIA | 90.692.105.1-732.000 | CV. DEWI BANJAR MULIA | 1,909,715 | 0.37 % | Belum dinilai |
76 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembangunan Pintu Air dan Siring Jalan Usaha Tani Desa Tabanio Kecamatan Takisung | Tender | Pekerjaan Konstruksi | 3898172 | 27456580 | APBD | 483,749,985 | 483,692,020 | 476,414,715 | 476,124,715 | 476,124,715 | 476,124,715 | 475,684,000 | 0 | 2021-05-04 | 2021-05-19 | 2021-06-03 | 01.961.550.9-732.000 | CV.WULAN | 01.961.550.9-732.000 | CV.WULAN | 7,335,270 | 1.52 % | Belum dinilai |
77 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Rehabilitasi Embung dan Jaringan Irigasi Desa Damit Hulu Kecamatan Batu Ampar | Tender | Pekerjaan Konstruksi | 3901172 | 29323563 | APBD | 1,303,099,987 | 1,303,015,000 | 1,294,238,412 | 1,294,111,000 | 1,292,942,000 | 1,292,942,000 | 0 | 0 | 2021-05-04 | 2021-05-19 | 2021-06-04 | 73.754.137.5-732.000 | cv.shofia | 73.754.137.5-732.000 | cv.shofia | 8,861,575 | 0.68 % | Belum dinilai |
78 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pengaspalan Jalan Desa Batu Mulya RT 01,02 Kec. Panyipatan | Tender | Pekerjaan Konstruksi | 3902172 | 27548897 | APBD | 499,800,000 | 499,158,426 | 492,787,127 | 492,787,127 | 492,787,127 | 492,787,127 | 492,787,127 | 0 | 2021-06-24 | 2021-07-14 | 2021-07-26 | 01.214.327.7-732.000 | CV. YUDHI JASA | 01.214.327.7-732.000 | CV. YUDHI JASA | 7,012,873 | 1.4 % | Belum dinilai |
79 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pengaspalan Jalan Desa Bentok Darat Kec. Bati-Bati | Tender | Pekerjaan Konstruksi | 3903172 | 27548958 | APBD | 494,760,000 | 494,682,508 | 488,454,933 | 488,454,933 | 488,454,933 | 488,454,933 | 0 | 0 | 2021-06-24 | 2021-07-14 | 2021-07-23 | 80.781.659.0-732.000 | CV.Aimikha Jaya Group | 80.781.659.0-732.000 | CV.Aimikha Jaya Group | 6,305,067 | 1.27 % | Belum dinilai |
80 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pengaspalan Jalan Desa Benua Lawas Rt. 02, 07 Kec. Takisung | Tender | Pekerjaan Konstruksi | 3904172 | 27549019 | APBD | 606,400,000 | 605,961,062 | 602,342,062 | 602,342,062 | 601,590,000 | 601,590,000 | 0 | 0 | 2021-06-24 | 2021-07-13 | 2021-07-26 | 90.698.494.3-732.000 | CV.SADEAS REJEKI INTI | 90.698.494.3-732.000 | CV.SADEAS REJEKI INTI | 4,057,938 | 0.67 % | Belum dinilai |
81 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pengaspalan Jalan Desa Bumi Jaya RT. 3,5 dan 6 Kec. Pelaihari | Tender | Pekerjaan Konstruksi | 3905172 | 27549097 | APBD | 466,940,000 | 466,209,274 | 460,142,774 | 460,142,774 | 459,691,000 | 459,691,000 | 0 | 0 | 2021-06-24 | 2021-07-14 | 2021-07-26 | 72.657.370.2-732.000 | CV.KEMBAR UTAMA | 72.657.370.2-732.000 | CV.KEMBAR UTAMA | 6,797,227 | 1.46 % | Belum dinilai |
82 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pengaspalan Jalan Desa Damar Lima RT. 7 dan 8 Kec. Batu Ampar | Tender | Pekerjaan Konstruksi | 3906172 | 27549154 | APBD | 699,200,000 | 698,607,409 | 697,295,902 | 697,295,902 | 696,500,000 | 696,500,000 | 0 | 0 | 2021-06-24 | 2021-07-14 | 2021-07-26 | 80.756.975.1-732.000 | CV.HUZAIMAH RAYA SEMESTA | 80.756.975.1-732.000 | CV.HUZAIMAH RAYA SEMESTA | 1,904,098 | 0.27 % | Belum dinilai |
83 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pengaspalan Jalan Desa Handil Gayam RT.005 dan RT.006 Kec. Bumi Makmur | Tender | Pekerjaan Konstruksi | 3907172 | 27549288 | APBD | 299,600,000 | 298,853,617 | 295,356,999 | 295,356,999 | 295,000,000 | 295,000,000 | 0 | 0 | 2021-06-24 | 2021-07-14 | 2021-07-26 | 93.927.191.2-731.000 | CV.HASRAT MULIA HABIBI | 93.927.191.2-731.000 | CV.HASRAT MULIA HABIBI | 4,243,001 | 1.42 % | Belum dinilai |
84 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pengaspalan Jalan Desa Jilatan RT. 5 Kec. Batu Ampar | Tender | Pekerjaan Konstruksi | 3908172 | 27549357 | APBD | 248,980,000 | 248,087,345 | 244,346,279 | 244,346,279 | 244,000,000 | 244,000,000 | 0 | 0 | 2021-06-24 | 2021-07-14 | 2021-07-26 | 86.386.465.8-732.000 | CV MITRA USAHA SUKSES | 86.386.465.8-732.000 | CV MITRA USAHA SUKSES | 4,633,721 | 1.86 % | Belum dinilai |
85 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pengaspalan Jalan Desa Kait-Kait Baru Kec. Bati-Bati | Tender | Pekerjaan Konstruksi | 3909172 | 27549431 | APBD | 494,760,000 | 494,682,508 | 493,203,729 | 493,203,729 | 492,700,000 | 492,700,000 | 0 | 0 | 2021-06-24 | 2021-07-14 | 2021-07-26 | 02.823.343.5-732.000 | CV AHMAD MUHAMMAD | 02.823.343.5-732.000 | CV AHMAD MUHAMMAD | 1,556,271 | 0.31 % | Belum dinilai |
86 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pengaspalan Jalan Desa Kampung Baru RT. 2 Kec. Pelaihari | Tender | Pekerjaan Konstruksi | 3910172 | 27549539 | APBD | 466,400,000 | 466,209,274 | 460,329,774 | 460,329,774 | 459,864,000 | 459,864,000 | 0 | 0 | 2021-06-24 | 2021-07-14 | 2021-07-26 | 82.839.397.5-732.000 | CV. ASSYA | 82.839.397.5-732.000 | CV. ASSYA | 6,070,227 | 1.3 % | Belum dinilai |
87 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pengaspalan Jalan Desa Kayu Abang RT.05 - 06 Kec. Tambang Ulang | Tender | Pekerjaan Konstruksi | 3911172 | 27549598 | APBD | 398,840,000 | 398,367,591 | 393,951,091 | 393,951,091 | 393,567,000 | 393,567,000 | 0 | 0 | 2021-06-24 | 2021-07-13 | 2021-07-26 | 02.172.423.2-732.000 | CV. REVIAMI | 02.172.423.2-732.000 | CV. REVIAMI | 4,888,909 | 1.23 % | Belum dinilai |
88 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembangunan Pedestrian/ Jalur Pejalan Kaki Pada Ruas Jalan KH. Mansyur Kota Pelaihari | Tender | Pekerjaan Konstruksi | 3912172 | 28843193 | APBD | 2,791,800,000 | 2,791,780,000 | 2,758,016,482 | 2,758,016,482 | 2,758,016,482 | 2,758,016,482 | 2,758,016,482 | 0 | 2021-05-17 | 2021-06-03 | 2021-06-15 | 01.141.578.3-732.000 | PT. SARANA DOA BERSAMA | 01.141.578.3-732.000 | PT. SARANA DOA BERSAMA | 33,783,518 | 1.21 % | Belum dinilai |
89 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pengaspalan Jalan Desa Pandahan Kec. Bati-Bati | Tender | Pekerjaan Konstruksi | 3913172 | 27549946 | APBD | 494,760,000 | 494,577,290 | 489,063,658 | 489,063,658 | 489,063,658 | 489,063,658 | 489,063,658 | 0 | 2021-06-24 | 2021-07-13 | 2021-07-23 | 76.708.451.0-732.000 | CV Berkah Terang Rahmat | 76.708.451.0-732.000 | CV Berkah Terang Rahmat | 5,696,342 | 1.15 % | Belum dinilai |
90 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pengaspalan Jalan Desa Panyipatan Kec. Panyipatan | Tender | Pekerjaan Konstruksi | 3914172 | 27550093 | APBD | 475,440,000 | 474,709,852 | 465,370,815 | 465,370,815 | 464,435,000 | 464,435,000 | 0 | 0 | 2021-06-24 | 2021-07-14 | 2021-07-23 | 02.521.809.0-732.000 | cv. andhika karya | 02.521.809.0-732.000 | cv. andhika karya | 10,069,185 | 2.12 % | Belum dinilai |
91 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pengaspalan Jalan Desa Simpang Empat Sungai Baru RT. 10 Kec. Jorong | Tender | Pekerjaan Konstruksi | 3915172 | 27550154 | APBD | 397,600,000 | 397,596,471 | 391,232,907 | 391,232,907 | 390,899,000 | 390,899,000 | 0 | 0 | 2021-06-24 | 2021-07-14 | 2021-07-26 | 86.381.875.3-732.000 | CV MAJU KARYA BERSAMA | 86.381.875.3-732.000 | CV MAJU KARYA BERSAMA | 6,367,094 | 1.6 % | Belum dinilai |
92 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pengaspalan Jalan Desa Srikandi RT 3 ke RT 1 Kec. Kurau | Tender | Pekerjaan Konstruksi | 3916172 | 27550259 | APBD | 699,540,000 | 699,227,007 | 685,971,187 | 685,971,187 | 685,277,000 | 685,277,000 | 0 | 0 | 2021-06-24 | 2021-07-13 | 2021-07-28 | 66.157.544.9-732.000 | ANANDA NINA PRATAMA | 66.157.544.9-732.000 | ANANDA NINA PRATAMA | 13,568,813 | 1.94 % | Belum dinilai |
93 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pengaspalan Jalan Desa Sumber Makmur Rt. 14 Kec. Takisung | Tender | Pekerjaan Konstruksi | 3917172 | 27550327 | APBD | 499,140,000 | 498,851,879 | 495,672,879 | 495,672,879 | 495,125,000 | 495,125,000 | 0 | 0 | 2021-06-24 | 2021-07-13 | 2021-07-26 | 90.506.445.7-732.000 | CV. AZIZA | 90.506.445.7-732.000 | CV. AZIZA | 3,467,122 | 0.69 % | Belum dinilai |
94 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pengaspalan Jalan Desa Telaga Langsat RT. 01 Kec. Takisung | Tender | Pekerjaan Konstruksi | 3918172 | 27550925 | APBD | 500,320,000 | 499,670,486 | 489,740,535 | 489,740,535 | 489,139,000 | 489,139,000 | 0 | 0 | 2021-06-24 | 2021-07-14 | 2021-07-23 | 72.831.285.1-732.000 | CV. Anindya | 72.831.285.1-732.000 | CV. Anindya | 10,579,465 | 2.11 % | Belum dinilai |
95 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pengaspalan Jalan Desa Telaga RT. 3 Kec. Pelaihari | Tender | Pekerjaan Konstruksi | 3919172 | 27551023 | APBD | 466,400,000 | 466,209,274 | 457,155,852 | 457,155,852 | 456,660,000 | 456,660,000 | 0 | 0 | 2021-06-24 | 2021-07-14 | 2021-07-23 | 72.831.285.1-732.000 | CV. Anindya | 72.831.285.1-732.000 | CV. Anindya | 9,244,148 | 1.98 % | Belum dinilai |
96 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pengaspalan Jalan Dusun 1 Desa Kuala Tambangan Kec. Takisung | Tender | Pekerjaan Konstruksi | 3920172 | 27551257 | APBD | 607,200,000 | 605,810,080 | 604,733,171 | 604,733,171 | 604,127,000 | 604,127,000 | 604,127,000 | 0 | 2021-06-24 | 2021-07-14 | 2021-07-26 | 92.898.532.4-732.000 | cv.amarta berkarya jaya | 92.898.532.4-732.000 | cv.amarta berkarya jaya | 2,466,829 | 0.41 % | Belum dinilai |
97 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pengaspalan Jalan Kabupaten Desa Benua Tengah RT 8 dan RT. 13 Kec. Takisung | Tender | Pekerjaan Konstruksi | 3921172 | 27551430 | APBD | 606,520,000 | 605,579,497 | 597,149,078 | 597,149,078 | 596,553,000 | 596,553,000 | 0 | 0 | 2021-06-24 | 2021-07-14 | 2021-07-26 | 86.386.465.8-732.000 | CV MITRA USAHA SUKSES | 86.386.465.8-732.000 | CV MITRA USAHA SUKSES | 9,370,922 | 1.55 % | Belum dinilai |
98 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pengaspalan Jalan Komplek CIP RT. 7 & 10 Kec. Pelaihari | Tender | Pekerjaan Konstruksi | 3922172 | 27552756 | APBD | 466,940,000 | 466,844,151 | 461,233,368 | 461,233,368 | 461,233,368 | 461,233,368 | 461,233,368 | 0 | 2021-06-24 | 2021-07-14 | 2021-07-23 | 01.961.550.9-732.000 | CV.WULAN | 01.961.550.9-732.000 | CV.WULAN | 5,706,632 | 1.22 % | Belum dinilai |
99 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pengaspalan Jalan Padang Panjang RT. 002 Desa Takisung Kec. Takisung | Tender | Pekerjaan Konstruksi | 3924172 | 27569665 | APBD | 446,040,000 | 445,950,085 | 437,341,383 | 437,341,383 | 436,814,000 | 436,814,000 | 0 | 0 | 2021-06-24 | 2021-07-13 | 2021-07-23 | 02.521.809.0-732.000 | cv. andhika karya | 02.521.809.0-732.000 | cv. andhika karya | 8,698,617 | 1.95 % | Belum dinilai |
100 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pengaspalan Jalan Poros Desa Asri Mulya Dusun I & II Kec. Jorong | Tender | Pekerjaan Konstruksi | 3925172 | 27569678 | APBD | 1,449,000,000 | 1,448,665,203 | 1,426,243,192 | 1,426,243,192 | 1,424,847,000 | 1,424,847,000 | 0 | 0 | 2021-06-24 | 2021-07-14 | 2021-07-26 | 86.380.418.3-732.000 | CV BERSAMA KAWAN SEJAHTERA | 86.380.418.3-732.000 | CV BERSAMA KAWAN SEJAHTERA | 22,756,808 | 1.57 % | Belum dinilai |
101 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pengaspalan Jalan Poros Desa Bajuin - Desa Sei. Bakar Kec. Bajuin | Tender | Pekerjaan Konstruksi | 3926172 | 27569688 | APBD | 899,160,000 | 898,524,661 | 887,052,579 | 887,052,579 | 887,052,579 | 887,052,579 | 887,052,579 | 0 | 2021-06-24 | 2021-07-14 | 2021-07-23 | 31.683.055.3-732.000 | CV.RINALDI | 31.683.055.3-732.000 | CV.RINALDI | 12,107,421 | 1.35 % | Belum dinilai |
102 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Rehabilitasi Jalan Desa Damit RT 8, 10, 12 Kec. Batu Ampar | Tender | Pekerjaan Konstruksi | 3927172 | 27569785 | APBD | 649,000,000 | 648,177,048 | 640,275,940 | 640,275,940 | 640,275,940 | 640,275,940 | 640,275,940 | 0 | 2021-06-24 | 2021-07-13 | 2021-07-23 | 76.708.451.0-732.000 | CV Berkah Terang Rahmat | 76.708.451.0-732.000 | CV Berkah Terang Rahmat | 8,724,060 | 1.34 % | Belum dinilai |
103 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembangunan Gerbang Taman Pintu Masuk Jl. Almanar | Tender | Pekerjaan Konstruksi | 3928172 | 28244010 | APBD | 990,000,000 | 989,930,000 | 978,008,430 | 978,008,430 | 978,008,430 | 978,008,430 | 978,008,430 | 0 | 2021-05-17 | 2021-06-03 | 2021-06-15 | 73.095.234.8-732.000 | CV.TIRTA GLOBAL TRISAKTI | 73.095.234.8-732.000 | CV.TIRTA GLOBAL TRISAKTI | 11,991,570 | 1.21 % | Belum dinilai |
104 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Rehabilitasi Jaringan Irigasi D.I.R. Padang Luas Kecamatan Kurau | Tender | Pekerjaan Konstruksi | 3933172 | 29207660 | APBD | 1,172,499,472 | 1,172,440,000 | 1,148,887,293 | 1,148,887,293 | 1,148,887,293 | 1,148,887,293 | 1,147,540,000 | 0 | 2021-05-04 | 2021-05-19 | 2021-06-04 | 01.124.716.0-731.000 | CV. DUA MAS | 01.124.716.0-731.000 | CV. DUA MAS | 23,612,179 | 2.01 % | Belum dinilai |
105 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Rehabilitasi Jaringan Irigasi D.I.R. Panjaratan Kecamatan Pelaihari | Tender | Pekerjaan Konstruksi | 3934172 | 29207834 | APBD | 1,849,999,941 | 1,849,963,000 | 1,813,027,625 | 1,813,027,625 | 1,811,143,000 | 1,811,143,000 | 0 | 0 | 2021-05-04 | 2021-05-19 | 2021-06-03 | 81.299.631.2-732.000 | CV.RICKY PERDANA PERTAMA | 81.299.631.2-732.000 | CV.RICKY PERDANA PERTAMA | 36,972,316 | 2 % | Belum dinilai |
106 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Alat/Bahan untuk Kegiatan Kantor-Alat Listrik | Tender | Pengadaan Barang | 3935172 | 28711619 | APBD | 1,160,482,660 | 923,515,879 | 916,352,250 | 916,352,250 | 916,352,250 | 916,352,250 | 0 | 0 | 2021-05-28 | 2021-06-15 | 2021-06-30 | 03.266.001.1-731.000 | CV. JASA TECHNIC | 03.266.001.1-731.000 | CV. JASA TECHNIC | 244,130,410 | 21.04 % | Belum dinilai |
107 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembangunan Jalan Alternative Kurau Utara - Bumi Harapan (Lanjutan) Rt. 008 Desa Kurau Utara Kec. Kurau | Tender | Pekerjaan Konstruksi | 3936172 | 27538780 | APBD | 452,120,051 | 451,666,534 | 447,970,534 | 447,970,534 | 447,516,000 | 447,516,000 | 0 | 0 | 2021-07-08 | 2021-07-27 | 2021-08-06 | 80.652.777.6-732.000 | cv astra bina | 80.652.777.6-732.000 | cv astra bina | 4,149,517 | 0.92 % | Belum dinilai |
108 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembangunan Siring dan Bahu Jalan Poros Desa Gunung Melati Kec. Batu Ampar | Tender | Pekerjaan Konstruksi | 3937172 | 27539164 | APBD | 698,500,000 | 698,121,561 | 693,456,716 | 693,456,716 | 692,895,000 | 692,895,000 | 0 | 0 | 2021-07-08 | 2021-07-28 | 2021-08-04 | 90.480.522.3-732.000 | CV. IDZMA | 90.480.522.3-732.000 | CV. IDZMA | 5,043,284 | 0.72 % | Belum dinilai |
109 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembangunan Siring Jalan Desa Kuringkit Kec. Panyipatan | Tender | Pekerjaan Konstruksi | 3938172 | 27539212 | APBD | 646,350,000 | 646,236,581 | 641,710,224 | 641,710,224 | 641,124,000 | 641,124,000 | 0 | 0 | 2021-07-08 | 2021-07-27 | 2021-08-04 | 90.695.174.4-732.000 | CV.RAMA HARAPAN BUNDA | 90.695.174.4-732.000 | CV.RAMA HARAPAN BUNDA | 4,639,776 | 0.72 % | Belum dinilai |
110 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembangunan Siring Jalan Desa Panjaratan RT 1 Kec. Pelaihari | Tender | Pekerjaan Konstruksi | 3939172 | 27539263 | APBD | 467,500,000 | 467,188,784 | 464,675,284 | 464,675,284 | 463,647,000 | 463,647,000 | 0 | 0 | 2021-07-08 | 2021-07-27 | 2021-08-04 | 73.754.137.5-732.000 | cv.shofia | 73.754.137.5-732.000 | cv.shofia | 2,824,716 | 0.6 % | Belum dinilai |
111 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembangunan Siring Jalan Desa Pemuda RT. 01 s.d. 09 Kec. Pelaihari | Tender | Pekerjaan Konstruksi | 3940172 | 27539301 | APBD | 467,500,000 | 467,453,313 | 462,463,173 | 462,463,173 | 462,463,173 | 462,463,173 | 462,463,173 | 0 | 2021-07-08 | 2021-07-28 | 2021-08-04 | 01.961.550.9-732.000 | CV.WULAN | 01.961.550.9-732.000 | CV.WULAN | 5,036,827 | 1.08 % | Belum dinilai |
112 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembangunan Siring Jalan Kabupaten Rt. 16 Desa Sukaramah Kec. Panyipatan | Tender | Pekerjaan Konstruksi | 3941172 | 27539392 | APBD | 348,890,000 | 348,638,031 | 346,674,531 | 346,674,531 | 345,940,000 | 345,940,000 | 0 | 0 | 2021-07-08 | 2021-07-27 | 2021-08-04 | 90.506.445.7-732.000 | CV. AZIZA | 90.506.445.7-732.000 | CV. AZIZA | 2,215,469 | 0.64 % | Belum dinilai |
113 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembangunan Siring Jalan Lingkungan Desa Asam-Asam RT. 11 Kec. Jorong | Tender | Pekerjaan Konstruksi | 3942172 | 27539435 | APBD | 298,800,000 | 298,655,789 | 296,329,289 | 296,329,289 | 296,048,000 | 296,048,000 | 0 | 0 | 2021-07-08 | 2021-07-28 | 2021-08-04 | 90.692.105.1-732.000 | CV. DEWI BANJAR MULIA | 90.692.105.1-732.000 | CV. DEWI BANJAR MULIA | 2,470,711 | 0.83 % | Belum dinilai |
114 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembangunan Siring Jalan Poros Trans Ujung Batu RT. 7 Kec. Pelaihari | Tender | Pekerjaan Konstruksi | 3943172 | 27539652 | APBD | 279,400,000 | 279,188,997 | 277,252,997 | 277,252,997 | 276,977,000 | 276,977,000 | 0 | 0 | 2021-07-08 | 2021-07-28 | 2021-08-04 | 90.698.494.3-732.000 | CV.SADEAS REJEKI INTI | 90.698.494.3-732.000 | CV.SADEAS REJEKI INTI | 2,147,003 | 0.77 % | Belum dinilai |
115 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembuatan Siring Jalan Desa Sumber Makmur Dusun 1, 2, dan 3 Kec. Takisung | Tender | Pekerjaan Konstruksi | 3944172 | 27539821 | APBD | 605,790,000 | 605,787,939 | 603,290,938 | 603,290,938 | 602,685,000 | 602,685,000 | 0 | 0 | 2021-07-08 | 2021-07-28 | 2021-08-04 | 82.839.397.5-732.000 | CV. ASSYA | 82.839.397.5-732.000 | CV. ASSYA | 2,499,062 | 0.41 % | Belum dinilai |
116 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Perkerasan Jalan Desa Handil Birayang Atas RT.002 Kec. Bumi Makmur | Tender | Pekerjaan Konstruksi | 3945172 | 27540480 | APBD | 299,450,000 | 299,397,558 | 294,040,629 | 294,040,629 | 293,749,000 | 293,749,000 | 0 | 0 | 2021-07-08 | 2021-07-28 | 2021-08-05 | 02.823.343.5-732.000 | CV AHMAD MUHAMMAD | 02.823.343.5-732.000 | CV AHMAD MUHAMMAD | 5,409,371 | 1.81 % | Belum dinilai |
117 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Perkerasan Jalan Desa Sabuhur RT.22 Kec. Jorong | Tender | Pekerjaan Konstruksi | 3946172 | 27540610 | APBD | 349,800,000 | 349,578,723 | 347,125,723 | 347,125,723 | 346,484,000 | 346,484,000 | 0 | 0 | 2021-07-08 | 2021-07-27 | 2021-08-04 | 73.754.137.5-732.000 | cv.shofia | 73.754.137.5-732.000 | cv.shofia | 2,674,277 | 0.76 % | Belum dinilai |
118 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Perkerasan Jalan Sumber Mulia Kec. Pelaihari | Tender | Pekerjaan Konstruksi | 3947172 | 27540719 | APBD | 499,950,000 | 499,729,121 | 490,868,220 | 490,868,220 | 490,868,220 | 490,868,220 | 0 | 0 | 2021-07-08 | 2021-07-28 | 2021-08-05 | 02.590.868.2-732.000 | CV.TAJMILA | 02.590.868.2-732.000 | CV.TAJMILA | 9,081,780 | 1.82 % | Belum dinilai |
119 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembangunan Ruang Publik EX Pasar Lama Pelaihari | Tender | Pekerjaan Konstruksi | 3948172 | 28983495 | APBD | 2,860,000,000 | 2,860,000,000 | 2,810,000,088 | 2,809,892,000 | 2,807,780,000 | 2,807,780,000 | 2,807,780,000 | 0 | 2021-05-17 | 2021-06-03 | 2021-06-15 | 01.124.865.5-731.000 | PT. PARTNER KEMENANGAN | 01.124.865.5-731.000 | PT. PARTNER KEMENANGAN | 49,999,912 | 1.75 % | Belum dinilai |
120 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pelebaran Jalan Desa Sambangan Kec. Bati-Bati | Tender | Pekerjaan Konstruksi | 3953172 | 27496241 | APBD | 493,920,000 | 492,797,735 | 487,187,735 | 487,187,735 | 487,187,735 | 487,187,735 | 487,187,735 | 0 | 2021-07-08 | 2021-07-28 | 2021-08-06 | 01.214.327.7-732.000 | CV. YUDHI JASA | 01.214.327.7-732.000 | CV. YUDHI JASA | 6,732,265 | 1.36 % | Belum dinilai |
121 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pelebaran Jalan Desa Sukaramah Kec. Panyipatan | Tender | Pekerjaan Konstruksi | 3954172 | 27538680 | APBD | 295,960,000 | 295,705,498 | 289,773,809 | 289,773,809 | 289,482,000 | 289,482,000 | 0 | 0 | 2021-07-08 | 2021-07-27 | 2021-08-06 | 74.995.810.4-732.000 | CV. SARABA DUA | 74.995.810.4-732.000 | CV. SARABA DUA | 6,186,191 | 2.09 % | Belum dinilai |
122 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Gang Kuripan Desa Nusa Indah RT 10 Kec. Bati-Bati | Tender | Pekerjaan Konstruksi | 3955172 | 27569971 | APBD | 494,760,000 | 494,682,508 | 489,259,508 | 489,259,508 | 489,259,508 | 489,259,508 | 489,259,508 | 0 | 2021-07-08 | 2021-07-27 | 2021-08-04 | 72.312.881.5-732.000 | cv. berkat kencana | 72.312.881.5-732.000 | cv. berkat kencana | 5,500,492 | 1.11 % | Belum dinilai |
123 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Jalan Desa Bentok Kampung Rt. 8 Kec. Bati-Bati | Tender | Pekerjaan Konstruksi | 3956172 | 27570040 | APBD | 399,280,000 | 399,061,060 | 394,760,060 | 394,760,060 | 394,760,060 | 394,760,060 | 394,760,060 | 0 | 2021-07-08 | 2021-07-27 | 2021-08-04 | 75.004.987.6-732.000 | CV. 3R | 75.004.987.6-732.000 | CV. 3R | 4,519,940 | 1.13 % | Belum dinilai |
124 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Jalan Desa Handil Birayang Atas RT.006 Kec. Bumi Makmur | Tender | Pekerjaan Konstruksi | 3957172 | 27570071 | APBD | 331,800,000 | 331,248,526 | 324,059,999 | 324,059,999 | 323,616,000 | 323,616,000 | 0 | 0 | 2021-07-08 | 2021-07-27 | 2021-08-05 | 93.933.083.3-736.000 | Cv.kumala karya konstruksi | 93.933.083.3-736.000 | Cv.kumala karya konstruksi | 7,740,001 | 2.33 % | Belum dinilai |
125 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Jaaln Desa Handil Birayang Bawah RT.001 RT.002 Kec. Bumi Makmur | Tender | Pekerjaan Konstruksi | 3958172 | 27570100 | APBD | 348,600,000 | 348,406,234 | 341,193,999 | 341,193,999 | 340,825,990 | 340,825,990 | 0 | 0 | 2021-07-08 | 2021-07-28 | 2021-08-05 | 93.933.083.3-736.000 | Cv.kumala karya konstruksi | 93.933.083.3-736.000 | Cv.kumala karya konstruksi | 7,406,001 | 2.12 % | Belum dinilai |
126 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Jalan Desa Handil Labuan Amas RT.006, RT.007 Kec. Bumi Makmur | Tender | Pekerjaan Konstruksi | 3959172 | 27570175 | APBD | 383,600,000 | 383,104,485 | 375,379,708 | 375,379,708 | 374,994,000 | 374,994,000 | 0 | 0 | 2021-07-08 | 2021-07-28 | 2021-08-05 | 02.709.123.0-732.000 | CV. MEDIA MULTI MITRA | 02.709.123.0-732.000 | CV. MEDIA MULTI MITRA | 8,220,292 | 2.14 % | Belum dinilai |
127 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Jalan Desa Kait-Kait Rt. 011 Kec. Bati-Bati | Tender | Pekerjaan Konstruksi | 3960172 | 27570210 | APBD | 399,840,000 | 399,770,921 | 395,721,320 | 395,721,320 | 395,308,000 | 395,308,000 | 0 | 0 | 2021-07-08 | 2021-07-28 | 2021-08-05 | 80.756.975.1-732.000 | CV.HUZAIMAH RAYA SEMESTA | 80.756.975.1-732.000 | CV.HUZAIMAH RAYA SEMESTA | 4,118,681 | 1.03 % | Belum dinilai |
128 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Jalan Desa Maluka Baulin RT 4 Kec. Kurau | Tender | Pekerjaan Konstruksi | 3961172 | 27619431 | APBD | 599,280,000 | 598,467,619 | 591,106,003 | 591,106,003 | 590,650,000 | 590,650,000 | 0 | 0 | 2021-07-08 | 2021-07-28 | 2021-08-05 | 02.709.310.3-732.000 | CV. PUTRA BUMI MAKMUR | 02.709.310.3-732.000 | CV. PUTRA BUMI MAKMUR | 8,173,997 | 1.36 % | Belum dinilai |
129 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Jalan Desa Panggung RT. 12, 13, 4 B Kec. Pelaihari | Tender | Pekerjaan Konstruksi | 3962172 | 27619496 | APBD | 466,940,000 | 466,822,613 | 462,147,613 | 462,147,613 | 462,147,613 | 462,147,613 | 462,147,613 | 0 | 2021-07-08 | 2021-07-27 | 2021-08-04 | 01.961.550.9-732.000 | CV.WULAN | 01.961.550.9-732.000 | CV.WULAN | 4,792,387 | 1.03 % | Belum dinilai |
130 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Jalan Desa Sabuhur Kampung Kec. Jorong | Tender | Pekerjaan Konstruksi | 3963172 | 27619554 | APBD | 499,140,000 | 498,993,984 | 494,001,235 | 494,001,235 | 493,500,000 | 493,500,000 | 0 | 0 | 2021-07-08 | 2021-07-28 | 2021-08-04 | 93.933.083.3-736.000 | Cv.kumala karya konstruksi | 93.933.083.3-736.000 | Cv.kumala karya konstruksi | 5,138,765 | 1.03 % | Belum dinilai |
131 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Jalan Desa Sungai Riam RT. 05 dan RT. 12 Kec. Pelaihari | Tender | Pekerjaan Konstruksi | 3964172 | 27619651 | APBD | 466,400,000 | 466,045,646 | 460,199,146 | 460,199,146 | 459,700,000 | 459,700,000 | 0 | 0 | 2021-07-08 | 2021-07-28 | 2021-08-06 | 02.089.882.1-732.000 | CV DARMARAJA | 02.089.882.1-732.000 | CV DARMARAJA | 6,200,854 | 1.33 % | Belum dinilai |
132 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Jalan Desa Tambang Ulang RT.05 - 06 Kec. Tambang Ulang | Tender | Pekerjaan Konstruksi | 3965172 | 27619672 | APBD | 249,600,000 | 249,342,794 | 246,939,015 | 246,939,015 | 246,690,000 | 246,690,000 | 0 | 0 | 2021-07-08 | 2021-07-28 | 2021-08-04 | 93.933.083.3-736.000 | Cv.kumala karya konstruksi | 93.933.083.3-736.000 | Cv.kumala karya konstruksi | 2,660,985 | 1.07 % | Belum dinilai |
133 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Jalan Desa Tanjung Kec. Bajuin Rt. 19-22 Kec. Bajuin | Tender | Pekerjaan Konstruksi | 3966172 | 27619740 | APBD | 399,200,000 | 398,563,424 | 395,498,714 | 395,498,714 | 395,113,000 | 395,113,000 | 0 | 0 | 2021-07-08 | 2021-07-28 | 2021-08-04 | 93.933.083.3-736.000 | Cv.kumala karya konstruksi | 93.933.083.3-736.000 | Cv.kumala karya konstruksi | 3,701,286 | 0.93 % | Belum dinilai |
134 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Jalan Desa Ujung Baru Kec. Bati-Bati | Tender | Pekerjaan Konstruksi | 3967172 | 27619765 | APBD | 399,280,000 | 399,060,230 | 390,965,309 | 390,965,309 | 390,360,000 | 390,360,000 | 0 | 0 | 2021-07-08 | 2021-07-27 | 2021-08-05 | 02.709.123.0-732.000 | CV. MEDIA MULTI MITRA | 02.709.123.0-732.000 | CV. MEDIA MULTI MITRA | 8,314,691 | 2.08 % | Belum dinilai |
135 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Jalan Dusun I RT 2 & 3, Dusun II RT 6 dan Dusun III Rt 10 & 12 Desa Martadah Baru Kec. Tambang Ulang | Tender | Pekerjaan Konstruksi | 3968172 | 27619847 | APBD | 399,200,000 | 398,545,049 | 393,435,153 | 393,435,153 | 393,105,000 | 393,105,000 | 0 | 0 | 2021-07-08 | 2021-07-28 | 2021-08-05 | 93.927.191.2-731.000 | CV.HASRAT MULIA HABIBI | 93.927.191.2-731.000 | CV.HASRAT MULIA HABIBI | 5,764,847 | 1.44 % | Belum dinilai |
136 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Jalan Pendidikan Desa Pulau Sari RT.010 Dusun III Kec. Tambang Ulang | Tender | Pekerjaan Konstruksi | 3969172 | 27621634 | APBD | 618,320,000 | 618,313,206 | 605,849,199 | 605,849,199 | 605,299,000 | 605,299,000 | 0 | 0 | 2021-07-08 | 2021-07-28 | 2021-08-06 | 02.521.809.0-732.000 | cv. andhika karya | 02.521.809.0-732.000 | cv. andhika karya | 12,470,801 | 2.02 % | Belum dinilai |
137 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Jalan Perintis Desa Tampang RT. 3 Kec. Pelaihari | Tender | Pekerjaan Konstruksi | 3970172 | 27621697 | APBD | 466,940,000 | 466,871,302 | 463,375,296 | 463,375,296 | 462,990,000 | 462,990,000 | 0 | 0 | 2021-07-08 | 2021-07-28 | 2021-08-04 | 93.927.191.2-731.000 | CV.HASRAT MULIA HABIBI | 93.927.191.2-731.000 | CV.HASRAT MULIA HABIBI | 3,564,704 | 0.76 % | Belum dinilai |
138 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Jalan Simpang 4 Kantor Desa Alur Kec. Jorong | Tender | Pekerjaan Konstruksi | 3971172 | 27621825 | APBD | 499,800,000 | 498,993,984 | 493,698,735 | 493,698,735 | 493,203,000 | 493,203,000 | 0 | 0 | 2021-07-08 | 2021-07-28 | 2021-08-04 | 03.282.508.5-732.000 | cv.tata laksana konstruksi | 03.282.508.5-732.000 | cv.tata laksana konstruksi | 6,101,265 | 1.22 % | Belum dinilai |
139 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Jalan SMA Abdul Kadir Kec. Panyipatan | Tender | Pekerjaan Konstruksi | 3972172 | 27621890 | APBD | 1,449,560,000 | 1,449,302,463 | 1,445,458,354 | 1,445,458,354 | 1,445,458,354 | 1,445,458,354 | 1,445,458,354 | 0 | 2021-07-08 | 2021-07-28 | 2021-08-04 | 80.948.780.4-732.000 | CV.ANUGRAH JAYA PRATAMA | 80.948.780.4-732.000 | CV.ANUGRAH JAYA PRATAMA | 4,101,646 | 0.28 % | Belum dinilai |
140 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Jl. Lambenteng Sampai Jl. Dukuh Pucuk Desa Ujung Baru RT 04 Kec. Bati-Bati | Tender | Pekerjaan Konstruksi | 3973172 | 27622277 | APBD | 494,760,000 | 494,579,500 | 489,343,500 | 489,343,500 | 489,343,500 | 489,343,500 | 489,343,500 | 0 | 2021-07-08 | 2021-07-28 | 2021-08-06 | 02.709.161.0-732.000 | CV. DELTA UTAMA | 02.709.161.0-732.000 | CV. DELTA UTAMA | 5,416,500 | 1.09 % | Belum dinilai |
141 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Modal Alat Laboratorium Kualitas Air dan Tanah | Tender | Pengadaan Barang | 3984172 | 29190591 | APBD | 1,499,960,000 | 1,499,960,000 | 1,493,800,000 | 1,493,800,000 | 1,493,000,000 | 1,493,000,000 | 0 | 0 | 2021-05-27 | 2021-06-14 | 2021-07-01 | 02.216.086.5-732.000 | CV. Delima Merah | 02.216.086.5-732.000 | CV. Delima Merah | 6,160,000 | 0.41 % | Belum dinilai |
142 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konstruksi Bangunan Gedung Kantor | Tender | Pekerjaan Konstruksi | 3989172 | 29430118 | APBD | 695,750,000 | 691,090,564 | 599,300,825 | 599,300,825 | 599,300,825 | 599,300,825 | 599,300,825 | 0 | 2021-05-31 | 2021-06-17 | 2021-07-01 | 74.188.891.1-731.000 | CV. CITA KARYA MAHARANI | 74.188.891.1-731.000 | CV. CITA KARYA MAHARANI | 96,449,175 | 13.86 % | Belum dinilai |
143 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Normalisasi Muara Sungai Desa Batakan Kecamatan Panyipatan | Tender | Pekerjaan Konstruksi | 3995172 | 27454783 | APBD | 4,499,979,000 | 4,499,300,251 | 4,481,383,974 | 4,481,383,974 | 4,479,271,000 | 0 | 0 | 0 | 2021-05-31 | 2021-06-18 | 75.099.887.4-732.000 | PT. RADHIKA UTAMA JAYA | 18,595,026 | 0.41 % | Belum dinilai | |||
144 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembuatan Bangunan Pengaman Pantai Desa Muara Asam-Asam Kecamatan Jorong | Tender | Pekerjaan Konstruksi | 3996172 | 27454396 | APBD | 3,823,998,279 | 3,823,885,083 | 3,814,287,693 | 3,814,287,693 | 3,813,222,000 | 0 | 0 | 0 | 2021-05-31 | 2021-06-18 | 81.359.711.9-732.000 | PT. RIZKY ALFAQIH SEJAHTERA | 9,710,586 | 0.25 % | Belum dinilai | |||
145 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembangunan Siring Jalan Usaha Tani Desa Telaga Kecamatan Pelaihari | Tender | Pekerjaan Konstruksi | 3998172 | 27447128 | APBD | 474,999,943 | 474,832,891 | 468,884,007 | 468,594,007 | 468,594,007 | 0 | 0 | 0 | 2021-05-31 | 2021-06-18 | 31.683.055.3-732.000 | CV.RINALDI | 6,115,936 | 1.29 % | Belum dinilai | |||
146 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Normalisasi Sungai Desa Karang Rejo dan Desa Swarangan Kecamatan Jorong | Tender | Pekerjaan Konstruksi | 3999172 | 27454625 | APBD | 999,955,000 | 999,569,056 | 981,938,318 | 981,938,318 | 981,030,000 | 0 | 0 | 0 | 2021-05-31 | 2021-06-18 | 01.124.716.0-731.000 | CV. DUA MAS | 18,016,682 | 1.8 % | Belum dinilai | |||
147 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Rehabilitasi Talang D.I. Mandila Kecamatan Bajuin | Tender | Pekerjaan Konstruksi | 4000172 | 29330198 | APBD | 624,999,980 | 624,991,073 | 614,163,107 | 613,868,176 | 613,498,000 | 0 | 0 | 0 | 2021-05-31 | 2021-06-18 | 66.157.544.9-732.000 | ANANDA NINA PRATAMA | 10,836,873 | 1.73 % | Belum dinilai | |||
148 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembangunan Jembatan Kerasik - Bentok Darat | Tender | Pekerjaan Konstruksi | 4004172 | 29453262 | APBD | 6,145,920,000 | 6,145,760,232 | 6,016,419,404 | 6,016,419,404 | 6,013,944,000 | 6,013,944,000 | 5,312,343,323 | 0 | 2021-06-24 | 2021-07-17 | 2021-07-26 | 90.211.298.6-731.000 | CV.SERASI CAHAYA MADINAH | 90.211.298.6-731.000 | CV.SERASI CAHAYA MADINAH | 129,500,596 | 2.11 % | Belum dinilai |
149 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pemasangan Drainase Tertutup Komp. Kijang Mas Kel. Sarang Halang | Tender | Pekerjaan Konstruksi | 4007172 | 29068318 | APBD | 607,999,000 | 607,439,000 | 601,466,269 | 601,466,269 | 601,466,269 | 600,916,000 | 600,916,000 | 0 | 2021-08-10 | 2021-08-24 | 2021-09-03 | 80.948.780.4-732.000 | CV.ANUGRAH JAYA PRATAMA | 80.948.780.4-732.000 | CV.ANUGRAH JAYA PRATAMA | 6,532,731 | 1.07 % | Belum dinilai |
150 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Rehabilitasi Jalan Balirejo-Bajuin | Tender | Pekerjaan Konstruksi | 4012172 | 29453326 | APBD | 5,707,033,200 | 5,706,982,168 | 5,544,884,621 | 5,544,884,621 | 5,544,884,621 | 5,544,884,621 | 0 | 0 | 2021-06-24 | 2021-07-17 | 2021-07-27 | 90.511.879.0-732.000 | CV. ULFAH | 90.511.879.0-732.000 | CV. ULFAH | 162,148,579 | 2.84 % | Belum dinilai |
151 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Rehabilitasi Jalan Pabahanan - Kunyit | Tender | Pekerjaan Konstruksi | 4013172 | 29453450 | APBD | 10,713,083,920 | 10,712,504,072 | 10,525,169,356 | 10,525,169,356 | 10,525,169,356 | 10,525,169,356 | 0 | 0 | 2021-06-24 | 2021-07-17 | 2021-07-26 | 01.124.716.0-731.000 | CV. DUA MAS | 01.124.716.0-731.000 | CV. DUA MAS | 187,914,564 | 1.75 % | Belum dinilai |
152 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Rehabilitasi Jalan Takisung - Tabanio | Tender | Pekerjaan Konstruksi | 4014172 | 29453505 | APBD | 1,744,998,750 | 1,744,865,998 | 1,729,893,942 | 1,729,893,942 | 1,729,893,942 | 1,729,893,942 | 0 | 0 | 2021-06-24 | 2021-07-17 | 2021-07-27 | 71.596.226.2-732.000 | MENCARI BERKAH | 71.596.226.2-732.000 | MENCARI BERKAH | 15,104,808 | 0.87 % | Belum dinilai |
153 | 2021 | Dinas Pendidikan dan Kebudayaan | Rehab Sedang / Berat dan Fasilitasi Kubah Makam Keramat Datu Pamulutan Kecamatan Panyipatan | Tender | Pekerjaan Konstruksi | 4019172 | 28023931 | APBD | 421,400,052 | 421,400,000 | 416,437,300 | 416,437,300 | 415,958,000 | 0 | 0 | 0 | 2021-06-29 | 2021-07-14 | 90.506.445.7-732.000 | CV. AZIZA | 4,962,752 | 1.18 % | Belum dinilai | |||
154 | 2021 | Dinas Koperasi, Usaha Kecil dan Perdagangan | BELANJA MODAL ALAT BENGKEL DAN ALAT UKUR | Tender | Pengadaan Barang | 4024172 | 29591109 | APBD | 1,118,948,600 | 1,065,725,650 | 842,418,500 | 842,418,500 | 842,418,500 | 842,418,500 | 0 | 0 | 2021-07-16 | 2021-08-09 | 2021-09-01 | 03.206.369.5-609.000 | cv jasmet global perkasa | 03.206.369.5-609.000 | cv jasmet global perkasa | 276,530,100 | 24.71 % | Belum dinilai |
155 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Peningkatan Jalan Lingkungan Perumahan Cahaya BanyuBanua, Desa Banyu Irang Kecamatan Bati-Bati | Tender | Pekerjaan Konstruksi | 4030172 | 29215801 | APBD | 351,006,655 | 334,825,507 | 331,459,499 | 331,459,499 | 331,459,499 | 0 | 0 | 0 | 2021-09-20 | 2021-10-05 | 72.312.881.5-732.000 | cv. berkat kencana | 19,547,156 | 5.57 % | Belum dinilai | |||
156 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Peningkatan Jalan Lingkungan Gg Nabela Matah Kel.Karang Taruna | Tender | Pekerjaan Konstruksi | 4031172 | 29214256 | APBD | 397,064,248 | 381,864,108 | 377,756,707 | 377,756,707 | 377,756,707 | 0 | 0 | 0 | 2021-09-20 | 2021-10-05 | 76.708.451.0-732.000 | CV Berkah Terang Rahmat | 19,307,541 | 4.86 % | Belum dinilai | |||
157 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembangunan Jalan Lingkar Dalam Takisung Kec. Takisung | Tender | Pekerjaan Konstruksi | 4048172 | 27539013 | APBD | 1,463,200,000 | 1,462,926,379 | 1,444,598,095 | 1,444,598,095 | 1,444,598,095 | 1,444,598,095 | 1,444,598,095 | 0 | 2021-06-24 | 2021-07-17 | 2021-07-23 | 81.396.118.2-732.000 | CV. Nabel Saputra | 81.396.118.2-732.000 | CV. Nabel Saputra | 18,601,905 | 1.27 % | Belum dinilai |
158 | 2021 | Dinas Pemberdayaan Perempuan dan Perlindungan Anak, Pengendalian Penduduk dan KeluargaBerencana | Belanja Modal Bangunan Gedung Kantor Gudang Alat dan Obat Kontrasepsi | Tender | Pekerjaan Konstruksi | 4049172 | 29258054 | APBD | 381,150,000 | 357,139,800 | 356,439,799 | 356,444,530 | 356,444,530 | 354,420,000 | 0 | 0 | 2021-06-24 | 2021-07-07 | 2021-07-14 | 86.495.751.9-732.000 | CV. ZAINA MADINA | 86.495.751.9-732.000 | CV. ZAINA MADINA | 24,710,201 | 6.48 % | Belum dinilai |
159 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembuatan Jembatan Gantung Kelurahan Pabahanan Kec. Pelaihari | Tender | Pekerjaan Konstruksi | 4053172 | 29659547 | APBD | 799,999,970 | 799,992,306 | 790,771,529 | 790,626,000 | 790,076,000 | 0 | 0 | 0 | 2021-06-24 | 2021-07-09 | 02.172.423.2-732.000 | CV. REVIAMI | 9,228,441 | 1.15 % | Belum dinilai | |||
160 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Rehabilitasi Tanggul Penahan Air Asin Daerah Irigasi Rawa Kecamatan Bumi Makmur | Tender | Pekerjaan Konstruksi | 4055172 | 29329783 | APBD | 1,082,249,379 | 1,082,020,995 | 1,060,295,159 | 1,060,295,159 | 1,060,295,159 | 0 | 0 | 0 | 2021-06-24 | 2021-07-09 | 02.521.809.0-732.000 | cv. andhika karya | 21,954,220 | 2.03 % | Belum dinilai | |||
161 | 2021 | Dinas Tenaga Kerja dan Perindustrian | Pembangunan Rumah Kemasan | Tender | Pekerjaan Konstruksi | 4057172 | 29108181 | APBD | 475,014,540 | 475,000,000 | 471,272,803 | 471,272,803 | 471,272,803 | 470,750,000 | 0 | 0 | 2021-06-25 | 2021-07-07 | 2021-07-27 | 02.709.123.0-732.000 | CV. MEDIA MULTI MITRA | 02.709.123.0-732.000 | CV. MEDIA MULTI MITRA | 3,741,737 | 0.79 % | Belum dinilai |
162 | 2021 | Dinas Pendidikan dan Kebudayaan | Konsolidasi Rehabilitasi Ruang Perpustakaan dengan tingkat kerusakan minimal sedang UPTD SMPN 4 Bati-Bati (DAK) dan Rehabilitasi Ruang Tata Usaha dengan tingkat kerusakan minimal sedang UPTD SMPN 4 Bati-Bati (DAK) | Tender | Pekerjaan Konstruksi | 4058172 | 29519227;29685950 | APBD | 442,050,138 | 441,948,000 | 436,647,836 | 436,647,836 | 436,647,836 | 436,647,836 | 436,647,836 | 0 | 2021-06-28 | 2021-07-08 | 2021-07-16 | 02.172.753.2-732.000 | CV. MULTI KREASI BORNEO | 02.172.753.2-732.000 | CV. MULTI KREASI BORNEO | 5,402,302 | 1.22 % | Belum dinilai |
163 | 2021 | Dinas Pendidikan dan Kebudayaan | Konsolidasi Rehabilitasi ruang perpustakaan dengan tingkat kerusakan minimal sedang UPTD SMPN 5 Bati-bati (DAK) dan Rehabilitasi Ruang kelas dengan tingkat kerusakan minimal sedang UPTD SMPN 5 Bati-Bati (DAK) | Tender | Pekerjaan Konstruksi | 4060172 | 29685979;29696742 | APBD | 578,025,330 | 577,468,000 | 572,325,000 | 572,325,000 | 572,325,000 | 572,325,000 | 572,325,000 | 0 | 2021-06-28 | 2021-07-08 | 2021-07-16 | 02.709.132.1-732.000 | CV. KIBUNG ABADI | 02.709.132.1-732.000 | CV. KIBUNG ABADI | 5,700,330 | 0.99 % | Belum dinilai |
164 | 2021 | Dinas Pendidikan dan Kebudayaan | Konsolidasi Pembangunan Laboratorium Komputer UPTD SD Negeri 4 Gunung Makmur (DAK),Pembangunan ruang guru UPTD SDN 4 GUNUNG MAKMUR (DAK dan Rehabilitasi ruang kelas dengan tingkat kerusakan minimal sedang UPTD SDN 4 GUNUNG MAKMUR (DAK) | Tender | Pekerjaan Konstruksi | 4061172 | 29441475;29450969;29684189 | APBD | 842,923,641 | 842,454,000 | 835,869,300 | 835,869,300 | 834,971,000 | 834,971,000 | 100 | 0 | 2021-06-28 | 2021-07-08 | 2021-07-16 | 72.032.397.1-732.000 | CV. PUTERI NUGRAHA | 72.032.397.1-732.000 | CV. PUTERI NUGRAHA | 7,054,341 | 0.84 % | Belum dinilai |
165 | 2021 | Dinas Pendidikan dan Kebudayaan | Konsolidasi Pembangunan ruang guru UPTD SDN GUNUNG MAS (DAK),Pembangunan ruang laboratorium komputer UPTD SDN GUNUNG MAS (DAK),Rehabilitasi ruang kelas dengan tingkat kerusakan minimal sedang UPTD SDN GUNUNG MAS (DAK) dan Rehabilitasi ruang perpustakaan dengan tingkat kerusakan minimal sedang UPTD SDN GUNUNG MAS (DAK) | Tender | Pekerjaan Konstruksi | 4062172 | 29448117;29528277;29685940;29689451 | APBD | 815,062,081 | 814,703,000 | 808,336,400 | 807,278,000 | 806,905,000 | 806,905,000 | 0 | 0 | 2021-06-28 | 2021-07-08 | 2021-07-16 | 01.124.719.4-732.000 | CV. IRAMA | 01.124.719.4-732.000 | CV. IRAMA | 6,725,681 | 0.83 % | Belum dinilai |
166 | 2021 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi Ruang kelas dengan tingkat kerusakan minimal sedang UPTD SDN JILATAN (DAK) | Tender | Pekerjaan Konstruksi | 4063172 | 29444095 | APBD | 391,755,048 | 391,629,000 | 387,085,749 | 387,085,749 | 387,085,749 | 386,346,000 | 386,346,000 | 0 | 2021-06-28 | 2021-07-08 | 2021-07-16 | 01.214.327.7-732.000 | CV. YUDHI JASA | 01.214.327.7-732.000 | CV. YUDHI JASA | 4,669,299 | 1.19 % | Belum dinilai |
167 | 2021 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi ruang perpustakaan dengan tingkat kerusakan minimal sedang UPTD SDN 2 KEBUN RAYA (DAK),Rehabilitasi ruang kelas dengan tingkat kerusakan minimal sedang UPTD SDN 2 KEBUNRAYA (DAK),Pembangunan ruang UKS UPTD SDN 2 KEBUN RAYA (DAK),Pembangunan ruang perpustakaan UPTD SDN 2 KEBUN RAYA (DAK),Pembangunan ruang laboratorium komputer UPTD SDN 2 KEBUN RAYA (DAK) | Tender | Pekerjaan Konstruksi | 4064172 | 29441429;29450899;29528240;29528318;29528333 | APBD | 1,223,738,620 | 1,200,252,000 | 1,188,038,000 | 1,188,038,000 | 1,188,038,000 | 1,188,038,000 | 1,188,038,000 | 0 | 2021-06-28 | 2021-07-08 | 2021-07-16 | 86.380.418.3-732.000 | CV BERSAMA KAWAN SEJAHTERA | 86.380.418.3-732.000 | CV BERSAMA KAWAN SEJAHTERA | 35,700,620 | 2.92 % | Belum dinilai |
168 | 2021 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi ruang kelas dengan tingkat kerusakan minimal sedang UPTD SDN 3 PANDANSARI (DAK) | Tender | Pekerjaan Konstruksi | 4065172 | 29441442 | APBD | 604,975,346 | 604,426,000 | 593,195,000 | 591,911,000 | 590,853,000 | 590,853,000 | 590,853,000 | 0 | 2021-06-28 | 2021-07-08 | 2021-07-16 | 86.386.465.8-732.000 | CV MITRA USAHA SUKSES | 86.386.465.8-732.000 | CV MITRA USAHA SUKSES | 11,780,346 | 1.95 % | Belum dinilai |
169 | 2021 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi ruang kelas dengan tingkat kerusakan minimal sedang UPTD SDN TELAGA LANGSAT (DAK) | Tender | Pekerjaan Konstruksi | 4066172 | 29449200 | APBD | 565,705,069 | 565,704,970 | 560,052,800 | 561,026,000 | 561,026,000 | 560,038,000 | 0 | 0 | 2021-06-28 | 2021-07-08 | 2021-07-16 | 90.695.223.9-732.000 | CV.AWI BATAKAN UTAMA | 90.695.223.9-732.000 | CV.AWI BATAKAN UTAMA | 5,652,269 | 1 % | Belum dinilai |
170 | 2021 | Dinas Kepemudaan dan Olah Raga | Konsolidasi Perbaikan/Rehab Ringan/Sedang/Berat Sarpras Olahraga (GOR, Lapangan Basket, Lapangan Tenis, dan Lapangan Volly) | Tender | Pekerjaan Konstruksi | 4072172 | 28931560 | APBD | 629,321,000 | 628,186,000 | 599,350,400 | 599,350,400 | 599,350,400 | 599,350,400 | 0 | 0 | 2021-07-21 | 2021-08-04 | 2021-08-16 | 95.386.887.4-732.000 | CV Kindai Artha Jaya | 95.386.887.4-732.000 | CV Kindai Artha Jaya | 29,970,600 | 4.76 % | Belum dinilai |
171 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Rehabilitasi Tanggul Penahan Air Asin Daerah Irigasi Rawa Kecamatan Kurau | Tender | Pekerjaan Konstruksi | 4077172 | 29330813 | APBD | 793,863,191 | 793,756,757 | 777,887,736 | 777,887,736 | 777,179,000 | 0 | 0 | 0 | 2021-07-08 | 2021-07-28 | 72.831.285.1-732.000 | CV. Anindya | 15,975,455 | 2.01 % | Belum dinilai | |||
172 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Rehabilitasi Bendung D.I. Sebamban Baru Kecamatan Kintap | Tender | Pekerjaan Konstruksi | 4079172 | 29330037 | APBD | 568,999,994 | 568,998,727 | 566,976,299 | 566,976,299 | 566,426,000 | 0 | 0 | 0 | 2021-07-08 | 2021-07-28 | 82.839.397.5-732.000 | CV. ASSYA | 2,023,695 | 0.36 % | Belum dinilai | |||
173 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Rehabilitasi Jaringan Irigasi D.I. Kunyit Kecamatan Bajuin | Tender | Pekerjaan Konstruksi | 4080172 | 29330312 | APBD | 612,799,893 | 612,589,589 | 608,285,891 | 608,285,891 | 607,363,200 | 0 | 0 | 0 | 2021-07-08 | 2021-07-28 | 72.657.370.2-732.000 | CV.KEMBAR UTAMA | 4,514,002 | 0.74 % | Belum dinilai | |||
174 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembuatan Bangunan Pengaman Pantai Desa Muara Kintap Kecamatan Kintap | Tender | Pekerjaan Konstruksi | 4081172 | 27454011 | APBD | 2,999,999,200 | 2,999,971,616 | 2,972,048,416 | 2,972,048,416 | 2,970,805,000 | 0 | 0 | 0 | 2021-07-08 | 2021-07-28 | 86.380.418.3-732.000 | CV BERSAMA KAWAN SEJAHTERA | 27,950,784 | 0.93 % | Belum dinilai | |||
175 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Perkerasan Jalan Lingkungan Rumah Sakit H. Boejasin | Tender | Pekerjaan Konstruksi | 4083172 | 29216792 | APBD | 872,000,016 | 837,320,909 | 819,678,891 | 819,678,891 | 819,019,000 | 0 | 0 | 0 | 2021-07-10 | 2021-07-23 | 02.521.809.0-732.000 | cv. andhika karya | 52,321,125 | 6 % | Belum dinilai | |||
176 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembuatan Drainase/ Saluran Perkotaan Rumah Sakit H.Boejasin | Tender | Pekerjaan Konstruksi | 4084172 | 29195627 | APBD | 2,800,000,000 | 2,714,510,921 | 2,658,904,715 | 2,658,904,715 | 2,656,050,000 | 0 | 0 | 0 | 2021-07-10 | 2021-07-23 | 72.831.285.1-732.000 | CV. Anindya | 141,095,285 | 5.04 % | Belum dinilai | |||
177 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Peningkatan Jalan Desa Sungai Cuka Kec. Kintap | Tender | Pekerjaan Konstruksi | 4085172 | 27619623 | APBD | 349,280,000 | 348,631,689 | 344,576,068 | 344,576,068 | 344,217,616 | 344,217,616 | 0 | 0 | 2021-07-12 | 2021-07-28 | 2021-08-04 | 03.282.508.5-732.000 | cv.tata laksana konstruksi | 03.282.508.5-732.000 | cv.tata laksana konstruksi | 4,703,932 | 1.35 % | Belum dinilai |
178 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Pembangunan TPS B3 | Tender | Pekerjaan Konstruksi | 4086172 | 28278500 | APBD | 528,000,000 | 528,000,000 | 522,598,533 | 522,598,533 | 522,598,533 | 522,598,533 | 522,598,533 | 0 | 2021-07-12 | 2021-07-23 | 2021-08-04 | 02.709.161.0-732.000 | CV. DELTA UTAMA | 02.709.161.0-732.000 | CV. DELTA UTAMA | 5,401,467 | 1.02 % | Belum dinilai |
179 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Penggantian Box Culvert Jalan Desa Pandan Sari RT 08/02 Kec. Kintap | Tender | Pekerjaan Konstruksi | 4089172 | 27546033 | APBD | 644,444,444 | 643,382,706 | 636,071,661 | 636,071,661 | 635,543,000 | 635,543,000 | 0 | 0 | 2021-07-13 | 2021-07-28 | 2021-08-04 | 76.853.698.9-732.000 | CV BERKAT USAHA MANDIRI | 76.853.698.9-732.000 | CV BERKAT USAHA MANDIRI | 8,372,783 | 1.3 % | Belum dinilai |
180 | 2021 | Dinas Kesehatan | Pengadaan Instalasi Pengolahan Air Limbah (IPAL) Puskesmas | Tender | Pengadaan Barang | 4098172 | 29735196 | APBD | 990,000,000 | 990,000,000 | 984,753,000 | 984,753,000 | 984,753,000 | 0 | 0 | 0 | 2021-08-03 | 2021-08-24 | 84.203.129.6-001.000 | CV. DETRILA KARYA | 5,247,000 | 0.53 % | Belum dinilai | |||
181 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Rehabilitasi Bendungan Desa Tebing Siring Kecamatan Bajuin | Tender | Pekerjaan Konstruksi | 4099172 | 27495839 | APBD | 1,279,960,000 | 1,279,948,634 | 1,274,156,998 | 1,274,156,998 | 1,274,156,998 | 0 | 0 | 0 | 2021-07-27 | 2021-08-07 | 90.506.445.7-732.000 | CV. AZIZA | 5,803,002 | 0.45 % | Belum dinilai | |||
182 | 2021 | Dinas Kesehatan | PENGADAAN SANITARIAN KIT (DAK), KONSOLIDASI : BELANJA OBAT-OBATAN- OBATAN LAINNYA (SANITARIAN KIT), BELANJA MODAL ALAT KANTOR LAINNYA, BELANJA MODAL ALAT KESEHATAN MATRA LAUT DAN BELANJA MODAL ALAT LABORATORIUN (SANITARIAN KIT) | Tender | Pengadaan Barang | 4100172 | 29772720;29772736;29772741;29773560 | APBD | 862,042,500 | 862,042,500 | 853,422,075 | 853,422,075 | 853,422,075 | 0 | 0 | 0 | 2021-07-29 | 2021-08-10 | 03.096.863.0-008.000 | CV. DOMASEEP PERMAY SURYA | 8,620,425 | 1 % | Belum dinilai | |||
183 | 2021 | Dinas Kepemudaan dan Olah Raga | Belanja Modal Pembangunan Gedung Futsal Desa Asam Jaya (Kec.Jorong) | Tender | Pekerjaan Konstruksi | 4105172 | 28534701 | APBD | 506,000,000 | 505,127,295 | 498,943,575 | 498,943,575 | 498,943,575 | 498,943,575 | 0 | 0 | 2021-08-10 | 2021-08-24 | 2021-09-03 | 76.853.698.9-732.000 | CV BERKAT USAHA MANDIRI | 76.853.698.9-732.000 | CV BERKAT USAHA MANDIRI | 7,056,425 | 1.39 % | Belum dinilai |
184 | 2021 | Dinas Peternakan Dan Kesehatan Hewan | BELANJA HIBAH BIBIT TERNAK ITIK: 1.Belanja hibah itik KT. Harapan Bersama Desa Kurau Utara Kec.Bumi Makmur, 2.Belanja Hibah (Bibit Itik KT. Usaha Bersama Desa Bumi Harapan Kec. Bumi Makmur), 3.Belanja Hibah Bibit Ternak Itik KT. Cinta Maju Desa Handil Labuan Amas Kec. Bumi Makmur, 4.Belanja Hibah Bibit Ternak Itik KT. Cinta Makmur desa Handil Birayang Atas Kec. Bumi Makmur | Tender | Pengadaan Barang | 4109172 | 29786983;29787057;29787103;29787139 | APBD | 270,000,000 | 243,772,200 | 237,600,000 | 237,600,000 | 237,600,000 | 0 | 0 | 0 | 2021-08-02 | 2021-08-19 | 02.342.717.2-733.000 | CV. ZULFA PERDANA | 32,400,000 | 12 % | Belum dinilai | |||
185 | 2021 | Dinas Kepemudaan dan Olah Raga | Belanja Modal Peralatan Olahraga Udara | Tender | Pengadaan Barang | 4117172 | 28547291 | APBD | 317,057,400 | 218,988,000 | 218,302,425 | 218,302,425 | 218,302,425 | 0 | 0 | 0 | 2021-08-13 | 2021-08-25 | 72.701.640.4-008.000 | PT.Anugerah Berkat Risen | 98,754,975 | 31.15 % | Belum dinilai | |||
186 | 2021 | Dinas Pendidikan dan Kebudayaan | Penambahan ruang kelas sekolah UPTD SDN 2 Kintapura | Tender | Pekerjaan Konstruksi | 4118172 | 28239864 | APBD | 588,176,714 | 588,161,000 | 582,064,430 | 582,064,430 | 582,064,430 | 0 | 0 | 0 | 2021-08-16 | 2021-09-01 | 02.709.161.0-732.000 | CV. DELTA UTAMA | 6,112,284 | 1.04 % | Belum dinilai | |||
187 | 2021 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi sedang/berat Ruang kelas sekolah UPTD SDN Handil Maluka | Tender | Pekerjaan Konstruksi | 4123172 | 28238538 | APBD | 404,250,050 | 404,240,000 | 402,821,153 | 402,821,000 | 402,821,000 | 0 | 0 | 0 | 2021-08-16 | 2021-09-01 | 80.652.777.6-732.000 | cv astra bina | 1,428,897 | 0.35 % | Belum dinilai | |||
188 | 2021 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi sedang/berat Ruang kelas sekolah UPTD SDN Pantai Harapan | Tender | Pekerjaan Konstruksi | 4124172 | 28238794 | APBD | 406,700,050 | 406,700,000 | 403,062,175 | 403,062,175 | 402,512,000 | 0 | 0 | 0 | 2021-08-16 | 2021-09-01 | 02.709.310.3-732.000 | CV. PUTRA BUMI MAKMUR | 3,637,875 | 0.89 % | Belum dinilai | |||
189 | 2021 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi sedang/berat Ruang kelas sekolah UPTD SDN Kali Besar | Tender | Pekerjaan Konstruksi | 4125172 | 28238686 | APBD | 404,250,050 | 404,225,000 | 399,792,140 | 399,692,000 | 399,692,000 | 0 | 0 | 0 | 2021-08-16 | 2021-09-01 | 01.214.327.7-732.000 | CV. YUDHI JASA | 4,457,910 | 1.1 % | Belum dinilai | |||
190 | 2021 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi sedang/berat Ruang kelas sekolah UPTD SDN 1 Handil Negara | Tender | Pekerjaan Konstruksi | 4126172 | 28234486 | APBD | 404,250,050 | 404,225,000 | 400,120,189 | 400,120,189 | 400,120,189 | 0 | 0 | 0 | 2021-08-16 | 2021-09-01 | 31.683.055.3-732.000 | CV.RINALDI | 4,129,861 | 1.02 % | Belum dinilai | |||
191 | 2021 | Dinas Pendidikan dan Kebudayaan | Pembangunan Ruang Guru/Kepala Sekolah/TU UPTD SDN Bentok Kampung | Tender | Pekerjaan Konstruksi | 4127172 | 29354197 | APBD | 250,727,415 | 250,638,000 | 249,515,876 | 249,515,876 | 249,515,876 | 0 | 0 | 0 | 2021-08-16 | 2021-09-01 | 72.032.397.1-732.000 | CV. PUTERI NUGRAHA | 1,211,539 | 0.48 % | Belum dinilai | |||
192 | 2021 | Dinas Pendidikan dan Kebudayaan | Penambahan ruang kelas sekolah UPTD SDN 1 Nusa Indah | Tender | Pekerjaan Konstruksi | 4129172 | 28277503 | APBD | 392,117,810 | 391,905,000 | 387,522,713 | 387,522,713 | 387,522,713 | 0 | 0 | 0 | 2021-08-16 | 2021-09-01 | 76.708.451.0-732.000 | CV Berkah Terang Rahmat | 4,595,097 | 1.17 % | Belum dinilai | |||
193 | 2021 | Dinas Pendidikan dan Kebudayaan | Pembangunan Ruang Guru/Kepala Sekolah/TU UPTD SMPN 4 Jorong | Tender | Pekerjaan Konstruksi | 4132172 | 29898023 | APBD | 263,752,216 | 263,740,000 | 260,860,719 | 260,860,719 | 260,860,719 | 0 | 0 | 0 | 2021-08-16 | 2021-09-01 | 02.172.753.2-732.000 | CV. MULTI KREASI BORNEO | 2,891,497 | 1.1 % | Belum dinilai | |||
194 | 2021 | Dinas Kesehatan | Pengadaan Mobil Bus donor Darah | Tender | Pengadaan Barang | 4136172 | 29641213 | APBD | 841,500,000 | 841,500,000 | 824,670,000 | 824,670,000 | 824,670,000 | 0 | 0 | 0 | 2021-08-25 | 2021-09-03 | 31.269.411.0-418.000 | CV. Cahaya Kurnia Mandiri | 16,830,000 | 2 % | Belum dinilai | |||
195 | 2021 | Dinas Kesehatan | Pengadaan Mobil Ambulance Double Gardan | Tender | Pengadaan Barang | 4137172 | 29917628 | APBD | 541,871,000 | 541,871,000 | 535,177,500 | 535,177,500 | 535,177,500 | 0 | 0 | 0 | 2021-08-25 | 2021-09-03 | 74.966.338.1-803.000 | CV. MULTI MITRA SEJAHTERA | 6,693,500 | 1.24 % | Belum dinilai | |||
196 | 2021 | Dinas Kesehatan | Pengadaan Tempat cuci tangan portable | Tender | Pengadaan Barang | 4148172 | 29841400 | APBD | 380,000,000 | 377,500,000 | 374,000,000 | 374,000,000 | 373,450,000 | 0 | 0 | 0 | 2021-09-01 | 2021-09-15 | 02.172.420.8-732.000 | CV. TELAGA MAS | 6,000,000 | 1.58 % | Belum dinilai | |||
197 | 2021 | Dinas Pendidikan dan Kebudayaan | Penambahan ruang kelas sekolah UPTD SDN 3 Batakan | Tender | Pekerjaan Konstruksi | 4149172 | 28240548 | APBD | 392,117,810 | 391,930,000 | 387,934,494 | 387,934,494 | 387,934,494 | 0 | 0 | 0 | 2021-08-30 | 2021-09-10 | 02.172.753.2-732.000 | CV. MULTI KREASI BORNEO | 4,183,316 | 1.07 % | Belum dinilai | |||
198 | 2021 | Dinas Pendidikan dan Kebudayaan | Pembangunan Ruang Guru/Kepala Sekolah/TU UPTD SMPN 4 Batu Ampar | Tender | Pekerjaan Konstruksi | 4151172 | 29897991 | APBD | 263,752,216 | 263,741,000 | 260,589,999 | 260,589,999 | 260,589,999 | 0 | 0 | 0 | 2021-08-30 | 2021-09-10 | 74.981.772.2-732.000 | rafa jaya abadi | 3,162,217 | 1.2 % | Belum dinilai | |||
199 | 2021 | Sekretariat Dewan Perwakilan Rakyat Daerah | Penyediaan Pakaian Dinas dan Atribut DPRD | Tender | Jasa Lainnya | 4153172 | 28581587 | APBD | 498,520,000 | 378,972,000 | 376,810,500 | 376,810,500 | 376,438,000 | 376,438,000 | 0 | 0 | 2021-09-14 | 2021-09-24 | 2021-10-04 | 02.660.127.8-732.000 | CV. MANDIRI BERSAMA | 02.660.127.8-732.000 | CV. MANDIRI BERSAMA | 121,709,500 | 24.41 % | Belum dinilai |
200 | 2021 | Dinas Ketahanan Pangan dan Perikanan | Belanja Hibah Barang kepada Badan dan Lembaga Nirlaba, Sukarela Bersifat Sosial Kemasyarakatan (Pembangunan Lumbung Pangan dan Lantai Jemur) | Tender | Pekerjaan Konstruksi | 4154172 | 29532237 | APBD | 431,362,800 | 431,144,618 | 415,677,947 | 415,677,947 | 415,677,947 | 0 | 0 | 0 | 2021-09-17 | 2021-09-30 | 02.709.119.8-732.000 | CV. PUTRI GEMILANG | 15,684,853 | 3.64 % | Belum dinilai | |||
201 | 2021 | Dinas Pendidikan dan Kebudayaan | Pembangunan Ruang Guru/Kepala Sekolah/TU UPTD SMPN 4 Takisung | Tender | Pekerjaan Konstruksi | 4156172 | 29901347 | APBD | 263,752,216 | 263,587,000 | 262,071,000 | 262,071,000 | 261,471,000 | 0 | 0 | 0 | 2021-09-16 | 2021-09-29 | 02.709.132.1-732.000 | CV. KIBUNG ABADI | 1,681,216 | 0.64 % | Belum dinilai | |||
202 | 2021 | Dinas Pendidikan dan Kebudayaan | Pembangunan Laboratorium UPTD SMPN 8 Pelaihari | Tender | Pekerjaan Konstruksi | 4157172 | 28221478 | APBD | 364,674,971 | 364,424,955 | 361,966,900 | 361,966,900 | 361,526,000 | 0 | 0 | 0 | 2021-09-16 | 2021-09-29 | 74.995.810.4-732.000 | CV. SARABA DUA | 2,708,071 | 0.74 % | Belum dinilai | |||
203 | 2021 | Dinas Pendidikan dan Kebudayaan | Pembangunan Ruang Guru/Kepala Sekolah/TU UPTD SDN 2 Ranggang | Tender | Pekerjaan Konstruksi | 4161172 | 29354107 | APBD | 250,727,415 | 250,721,000 | 248,812,700 | 247,000,000 | 248,268,600 | 0 | 0 | 0 | 2021-09-16 | 2021-09-29 | 02.172.423.2-732.000 | CV. REVIAMI | 1,914,715 | 0.76 % | Belum dinilai | |||
204 | 2021 | Dinas Pendidikan dan Kebudayaan | Pembangunan Lapangan Upacara UPTD SDN 1 Benua Raya | Tender | Pekerjaan Konstruksi | 4162172 | 28218234 | APBD | 248,227,408 | 248,095,000 | 245,837,400 | 245,837,400 | 245,837,400 | 0 | 0 | 0 | 2021-09-16 | 2021-09-29 | 70.623.092.7-732.000 | Syabilla azzahra | 2,390,008 | 0.96 % | Belum dinilai | |||
205 | 2021 | Dinas Pendidikan dan Kebudayaan | Pembangunan Pagar Sekolah UPTD SDN 1 Martadah | Tender | Pekerjaan Konstruksi | 4163172 | 28228150 | APBD | 342,576,080 | 342,526,000 | 341,209,100 | 341,244,138 | 340,914,000 | 0 | 0 | 0 | 2021-09-16 | 2021-09-29 | 02.521.867.8-732.000 | cv. tiga bersaudara | 1,366,980 | 0.4 % | Belum dinilai | |||
206 | 2021 | Dinas Pendidikan dan Kebudayaan | Penambahan ruang kelas sekolah UPTD SDN 3 Muara Kintap | Tender | Pekerjaan Konstruksi | 4164172 | 28275483 | APBD | 392,117,810 | 392,065,000 | 389,499,900 | 389,724,900 | 388,967,000 | 0 | 0 | 0 | 2021-09-16 | 2021-09-29 | 02.660.122.9-732.000 | CV. FAJAR PRATAMA | 2,617,910 | 0.67 % | Belum dinilai | |||
207 | 2021 | Dinas Kesehatan | Belanja makan minum pasien | Tender | Jasa Lainnya | 4166172 | 29239434 | APBD | 1,125,000,000 | 229,500,000 | 229,245,000 | 229,245,000 | 228,888,000 | 0 | 0 | 0 | 2021-09-15 | 2021-09-25 | 92.261.618.0-732.000 | CV. CAHAYA MITRA PERKASA | 895,755,000 | 79.62 % | Belum dinilai | |||
208 | 2021 | Dinas Pendidikan dan Kebudayaan | Pembangunan Ruang Guru/Kepala Sekolah/TU UPTD SDN 3 Pandansari | Tender | Pekerjaan Konstruksi | 4167172 | 29354174 | APBD | 250,727,415 | 250,700,000 | 249,668,079 | 249,668,079 | 249,160,000 | 0 | 0 | 0 | 2021-09-16 | 2021-09-29 | 02.709.132.1-732.000 | CV. KIBUNG ABADI | 1,059,336 | 0.42 % | Belum dinilai | |||
209 | 2021 | Dinas Pendidikan dan Kebudayaan | Konsolidasi Rehabilitasi sedang/berat Ruang kelas sekolah UPTD SDN 1 Kintap Kecil,Rehabilitasi sedang/berat Rumah Dinas Kepala Sekolah/Guru/Penjaga Sekolah UPTDSDN 1 Kintap Kecil | Tender | Pekerjaan Konstruksi | 4168172 | 28234574;28252024 | APBD | 575,750,071 | 575,646,000 | 571,327,716 | 571,292,000 | 571,292,000 | 0 | 0 | 0 | 2021-09-16 | 2021-09-29 | 02.709.161.0-732.000 | CV. DELTA UTAMA | 4,422,355 | 0.77 % | Belum dinilai | |||
210 | 2021 | Dinas Pendidikan dan Kebudayaan | Konsolidasi Pembangunan Ruang Guru/Kepala Sekolah/TU UPTD SDN Sumber Mulia dan Pembangunan Pagar Sekolah UPTD SDN Sumber Mulia | Tender | Pekerjaan Konstruksi | 4169172 | 29354195;30024438 | APBD | 390,657,652 | 390,600,000 | 386,673,088 | 386,613,000 | 386,613,000 | 0 | 0 | 0 | 2021-09-16 | 2021-09-29 | 76.708.451.0-732.000 | CV Berkah Terang Rahmat | 3,984,564 | 1.02 % | Belum dinilai | |||
211 | 2021 | Dinas Koperasi, Usaha Kecil dan Perdagangan | pembangunan Toko/Los pasar Batakan | Tender | Pekerjaan Konstruksi | 4171172 | 29751712 | APBD | 233,420,000 | 220,334,690 | 0 | 0 | 0 | 0 | 0 | 0 | 2021-09-21 | 2021-10-06 | 233,420,000 | 100 % | Belum dinilai | |||||
212 | 2021 | Dinas Pendidikan dan Kebudayaan | Rehabilitasi sedang/berat Gedung kantor | Tender | Pekerjaan Konstruksi | 4172172 | 28066128 | APBD | 421,400,052 | 421,293,000 | 419,920,000 | 419,920,000 | 419,370,000 | 0 | 0 | 0 | 2021-10-01 | 2021-10-13 | 92.898.532.4-732.000 | cv.amarta berkarya jaya | 1,480,052 | 0.35 % | Belum dinilai | |||
213 | 2021 | Dinas Tenaga Kerja dan Perindustrian | Pengadaan Mobil Angkutan Mobile Expo | Tender | Jasa Lainnya | 4173172 | 29937123 | APBD | 750,000,000 | 728,750,000 | 0 | 0 | 0 | 0 | 0 | 0 | 2021-10-01 | 2021-10-13 | 750,000,000 | 100 % | Belum dinilai | |||||
214 | 2021 | Dinas Tenaga Kerja dan Perindustrian | Belanja Hibah Barang kepada Badan dan Lembaga Nirlaba, Sukarela Dan Sosial yang Telah Memiliki Surat Keterangan Terdaftar (DID) | Tender | Pengadaan Barang | 4174172 | 30006967 | APBD | 290,000,000 | 281,580,020 | 254,309,202 | 254,309,202 | 232,600,200 | 232,600,200 | 232,600,200 | 0 | 2021-10-05 | 2021-10-20 | 2021-11-03 | 74.065.891.9-543.000 | CV RUMAH MESIN | 74.065.891.9-543.000 | CV RUMAH MESIN | 35,690,798 | 12.31 % | Belum dinilai |
215 | 2021 | Dinas Kesehatan | Rehabilitasi Bangunan Rumah Sakit (Ruang Operasi Terpadu/MOT) | Tender | Jasa Lainnya | 4177172 | 30007542 | APBDP | 5,199,996,876 | 5,199,996,876 | 5,049,988,830 | 5,049,988,830 | 5,049,988,830 | 5,049,988,830 | 4,039,991,064 | 0 | 2021-10-01 | 2021-10-13 | 2021-11-09 | 95.601.296.7-801.000 | PT. Murti Adyatama Cipta | 95.601.296.7-801.000 | PT. Murti Adyatama Cipta | 150,008,046 | 2.88 % | Belum dinilai |
216 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Modal Kendaraan Bermotor Khusus - Kendaraan Operasional PJU Skylift | Tender | Pengadaan Barang | 4201172 | 30328081 | APBDP | 1,710,500,000 | 1,705,000,000 | 1,693,000,000 | 1,693,000,000 | 1,693,000,000 | 1,691,000,000 | 423,250,000 | 0 | 2021-11-15 | 2021-11-26 | 2021-12-02 | 86.855.322.3-452.000 | Trijaya Multi Perkasa | 86.855.322.3-452.000 | Trijaya Multi Perkasa | 17,500,000 | 1.02 % | Belum dinilai |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Studi Komprehensif Pengendalian Banjir DAS Tabanio | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3756172 | 27445221 | APBD | 1,499,999,600 | 1,499,924,319 | 1,350,580,000 | 1,350,580,000 | 1,350,580,000 | 1,350,000,000 | 0 | 0 | 2021-03-01 | 2021-04-13 | 2021-05-03 | 02.241.591.3-424.000 | PT. WINAGUNA SARANA TEKNIK | 02.241.591.3-424.000 | PT. WINAGUNA SARANA TEKNIK | 149,419,600 | 9.96 % | Belum dinilai |
2 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembuatan Desain Pengembangan Daerah Irigasi Desa Benua Raya Kecamatan Bati-Bati | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3758172 | 27446357 | APBD | 349,999,100 | 349,949,294 | 346,280,000 | 346,280,000 | 346,280,000 | 344,720,000 | 0 | 0 | 2021-03-08 | 2021-04-21 | 2021-05-07 | 02.049.336.7-606.000 | CV. Intishar Karya | 02.049.336.7-606.000 | CV. Intishar Karya | 3,719,100 | 1.06 % | Belum dinilai |
3 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembuatan Desain Pengembangan Daerah Irigasi Kintap Kecil Kecamatan Kintap | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3759172 | 27446692 | APBD | 249,999,200 | 249,935,800 | 247,390,000 | 247,390,000 | 247,390,000 | 246,415,000 | 0 | 0 | 2021-03-08 | 2021-04-21 | 2021-05-07 | 02.778.681.3-423.000 | PT. Gumilang Sajati | 02.778.681.3-423.000 | PT. Gumilang Sajati | 2,609,200 | 1.04 % | Belum dinilai |
4 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembuatan Dokumen Lingkungan Pengembangan Irigasi Desa Banua Raya Kecamatan Bati-Bati | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3760172 | 27547776 | APBD | 199,999,800 | 199,980,000 | 197,450,000 | 197,450,000 | 197,450,000 | 196,256,500 | 0 | 0 | 2021-03-08 | 2021-04-21 | 2021-05-07 | 01.534.559.8-731.000 | PT TECTAMA KARYA | 01.534.559.8-731.000 | PT TECTAMA KARYA | 2,549,800 | 1.27 % | Belum dinilai |
5 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembuatan Desain Bangunan Pelindung Pantai Desa Swarangan Kecamatan Jorong | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3767172 | 27444642 | APBD | 249,999,200 | 249,993,133 | 245,135,000 | 245,135,000 | 244,035,000 | 244,035,000 | 0 | 0 | 2021-03-16 | 2021-05-07 | 2021-06-03 | 02.778.681.3-423.000 | PT. Gumilang Sajati | 02.778.681.3-423.000 | PT. Gumilang Sajati | 4,864,200 | 1.95 % | Belum dinilai |
6 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembuatan Desain Konstruksi Embung Dusun Riam Pinang Desa Tanjung Kecamatan Bajuin | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3769172 | 27434729 | APBD | 299,999,700 | 299,910,866 | 295,020,000 | 295,020,000 | 293,920,000 | 293,920,000 | 0 | 0 | 2021-03-16 | 2021-05-07 | 2021-07-03 | 02.778.681.3-423.000 | PT. Gumilang Sajati | 02.778.681.3-423.000 | PT. Gumilang Sajati | 4,979,700 | 1.66 % | Belum dinilai |
7 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembuatan Desain Bangunan Pelindung Pantai Desa Takisung Kecamatan Takisung | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3770172 | 27444803 | APBD | 249,999,200 | 249,993,133 | 245,178,000 | 245,178,000 | 244,073,000 | 244,073,000 | 0 | 0 | 2021-03-16 | 2021-05-07 | 2021-06-03 | 92.804.430.4-424.000 | PT. EKUILAPATTRA ENJINEERING KONSULTAN | 92.804.430.4-424.000 | PT. EKUILAPATTRA ENJINEERING KONSULTAN | 4,821,200 | 1.93 % | Belum dinilai |
8 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Pembuatan SID Peningkatan Jaringan Irigasi Rawa Kandangan Baru Kecamatan Panyipatan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3771172 | 27446014 | APBD | 499,999,500 | 499,899,778 | 475,200,000 | 475,200,000 | 474,375,000 | 474,375,000 | 474,375,000 | 0 | 2021-03-16 | 2021-05-07 | 2021-06-03 | 02.049.336.7-606.000 | CV. Intishar Karya | 02.049.336.7-606.000 | CV. Intishar Karya | 24,799,500 | 4.96 % | Belum dinilai |
9 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Survey Investigasi dan Desain Bangunan Pelindung Pantai Desa Tabanio Kecamatan Takisung | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 3772172 | 27444278 | APBD | 299,999,700 | 299,907,070 | 295,460,000 | 295,460,000 | 294,140,000 | 294,140,000 | 0 | 0 | 2021-03-16 | 2021-05-07 | 2021-06-03 | 02.043.129.2-731.000 | CV. GANESHA TEKNIK | 02.043.129.2-731.000 | CV. GANESHA TEKNIK | 4,539,700 | 1.51 % | Belum dinilai |
10 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Konsolidasi Konsultansi Pengawasan Rekonstruksi/Peningkatan Struktur Jalan Lingkungan Desa Sumber Jaya (Ruas No. 348) dan Konsultansi Pengawasan Rekonstruksi/Peningkatan Struktur Jalan Kintap - Bukit Mulya (Ruas Nomor 56) | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 3826172 | 29111169 | APBD | 200,000,000 | 199,977,800 | 196,391,360 | 196,391,360 | 196,336,360 | 196,336,360 | 196,336,360 | 0 | 2021-04-22 | 2021-06-02 | 2021-06-21 | 02.089.773.2-733.000 | PT. TECHNIKATAMA JASA KONSULTAN | 02.089.773.2-733.000 | PT. TECHNIKATAMA JASA KONSULTAN | 3,608,640 | 1.8 % | Belum dinilai |
11 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Belanja Jasa Pelaksanaan GCP dan Pembuatan Data dan Peta Dasar Kecamatan Tambang Ulang | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 3929172 | 28306808 | APBD | 247,500,000 | 247,105,100 | 222,336,400 | 222,336,400 | 222,181,000 | 0 | 0 | 0 | 2021-05-04 | 2021-06-17 | 02.390.537.5-429.000 | PT. PADURAKSA KONSULTAN | 25,163,600 | 10.17 % | Belum dinilai | |||
12 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Belanja Jasa Pelaksanaan GCP dan Pembuatan Data dan Peta Dasar Kecamatan Penyipatan | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 3930172 | 28256374 | APBD | 247,500,000 | 247,105,100 | 222,336,400 | 222,336,400 | 222,181,000 | 0 | 0 | 0 | 2021-05-04 | 2021-06-17 | 02.390.537.5-429.000 | PT. PADURAKSA KONSULTAN | 25,163,600 | 10.17 % | Belum dinilai | |||
13 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Penyusunan Grand Design Penataan Kota Pelaihari 2021 | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 3952172 | 28305249 | APBD | 1,237,500,000 | 1,235,627,800 | 0 | 0 | 0 | 0 | 0 | 0 | 2021-06-09 | 2021-07-22 | 1,237,500,000 | 100 % | Belum dinilai | |||||
14 | 2021 | Badan Perencanaan Pembangunan, Riset dan Inovasi Daerah | Kajian Kawasan Berpotensi Bencana Dan Mitigasinya di Kabupaten Tanah Laut | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 4001172 | 27922563 | APBD | 282,670,000 | 281,400,900 | 270,215,000 | 270,215,000 | 269,789,000 | 269,789,000 | 269,789,000 | 0 | 2021-06-07 | 2021-07-14 | 2021-07-29 | 02.241.591.3-424.000 | PT. WINAGUNA SARANA TEKNIK | 02.241.591.3-424.000 | PT. WINAGUNA SARANA TEKNIK | 12,455,000 | 4.41 % | Belum dinilai |
15 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Konsolidasi Konsultan Survey Kondisi Jalan Tahun 2021 (Paket 1,2,3,4, dan 5) | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 4021172 | 29176255 | APBD | 500,000,000 | 499,963,750 | 475,074,875 | 475,074,875 | 474,662,375 | 474,662,375 | 474,662,375 | 0 | 2021-06-11 | 2021-07-07 | 2021-07-14 | 02.390.537.5-429.000 | PT. PADURAKSA KONSULTAN | 02.390.537.5-429.000 | PT. PADURAKSA KONSULTAN | 24,925,125 | 4.99 % | Belum dinilai |
16 | 2021 | Dinas Pekerjaan Umum, Penataan Ruang dan Pertanahan | Konsultansi Perencanaan DED Ruas Jalan Asam-Asam - Riam Adungan | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 4059172 | 27650121 | APBD | 600,000,000 | 599,901,500 | 575,270,817 | 575,270,817 | 574,445,817 | 574,445,817 | 574,445,817 | 0 | 2021-07-08 | 2021-08-11 | 2021-08-23 | 02.390.537.5-429.000 | PT. PADURAKSA KONSULTAN | 02.390.537.5-429.000 | PT. PADURAKSA KONSULTAN | 24,729,183 | 4.12 % | Belum dinilai |
17 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Konsultansi MasterPlan Penerangan Jalan Umum Kota Pelaihari | Seleksi | Jasa Konsultansi Badan Usaha Konstruksi | 4107172 | 29704647 | APBD | 330,000,000 | 329,508,960 | 319,614,900 | 319,614,900 | 319,119,000 | 319,119,000 | 319,119,000 | 0 | 2021-08-02 | 2021-09-01 | 2021-09-09 | 01.236.248.9-651.000 | KOPKAR INTI KESEJAHTERAAN | 01.236.248.9-651.000 | KOPKAR INTI KESEJAHTERAAN | 10,385,100 | 3.15 % | Belum dinilai |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | 2021 | Dinas Komunikasi, Informatika, Statistik dan Persandian | Biaya berlangganan internet dan IP publik | Tender Cepat | Jasa Lainnya | 3755172 | 27410584 | APBD | 2,500,000,000 | 2,424,419,987 | 2,380,419,987 | 2,380,419,987 | 2,380,419,987 | 2,380,419,987 | 0 | 0 | 2021-02-26 | 2021-02-26 | 2021-03-02 | 01.000.013.1-093.000 | PT. Telekomunikasi Indonesia, Tbk. | 01.000.013.1-093.000 | PT. Telekomunikasi Indonesia, Tbk. | 119,580,013 | 4.78 % | Belum dinilai |
2 | 2021 | Dinas Kepemudaan dan Olah Raga | Pengadaan Pakaian Olahraga Untuk Kontingen POPDA | Tender Cepat | Jasa Lainnya | 3785172 | 28967509 | APBD | 255,835,800 | 255,835,800 | 217,800,000 | 217,800,000 | 217,800,000 | 217,800,000 | 100 | 0 | 2021-03-31 | 2021-04-05 | 2021-04-19 | 02.487.114.7-412.000 | PT. Pendopo Multi Karya | 02.487.114.7-412.000 | PT. Pendopo Multi Karya | 38,035,800 | 14.87 % | Belum dinilai |
3 | 2021 | Dinas Ketahanan Pangan dan Perikanan | Belanja Persediaan untuk Dijual/Diserahkan-Persediaan untuk Dijual/Diserahkan kepada Masyarakat (Pengadaan Alat Tangkap Ikan Ramah Lingkungan Trammel Net dan Gill Net) | Tender Cepat | Pengadaan Barang | 4016172 | 29562959 | APBD | 588,999,994 | 262,640,422 | 259,710,000 | 259,710,000 | 259,710,000 | 259,710,000 | 0 | 0 | 2021-06-24 | 2021-06-25 | 2021-07-22 | 72.781.403.0-805.000 | CV. SUKSES JAYA MANDIRI | 72.781.403.0-805.000 | CV. SUKSES JAYA MANDIRI | 329,289,994 | 55.91 % | Belum dinilai |
4 | 2021 | Dinas Koperasi, Usaha Kecil dan Perdagangan | Belanja Modal alat Angkutan | Tender Cepat | Pengadaan Barang | 4018172 | 28803227 | APBD | 599,500,000 | 597,579,200 | 592,000,001 | 592,000,001 | 592,000,001 | 592,000,001 | 592,000,001 | 0 | 2021-07-02 | 2021-07-05 | 2021-07-29 | 02.575.821.0-732.000 | PT. Mitra Profitamas Motor | 02.575.821.0-732.000 | PT. Mitra Profitamas Motor | 7,499,999 | 1.25 % | Belum dinilai |
5 | 2021 | Dinas Kesehatan | Pengadaan Mobil Promosi Kesehatan (Promkes) | Tender Cepat | Pengadaan Barang | 4038172 | 29627386 | APBD | 649,999,999 | 649,950,000 | 634,145,001 | 634,145,001 | 634,145,001 | 634,145,001 | 634,145,000 | 0 | 2021-06-18 | 2021-06-21 | 2021-06-29 | 01.474.170.6-732.000 | PT. WIRA MEGAH PROFITAMAS | 01.474.170.6-732.000 | PT. WIRA MEGAH PROFITAMAS | 15,854,999 | 2.44 % | Belum dinilai |
6 | 2021 | Dinas Kependudukan dan Pencatatan Sipil | Belanja Alat/Bahan untuk Kegiatan Kantor - Bahan Komputer | Tender Cepat | Pengadaan Barang | 4074172 | 29274135 | APBD | 510,268,000 | 501,750,047 | 394,152,000 | 394,152,000 | 394,152,000 | 394,152,000 | 0 | 0 | 2021-07-14 | 2021-07-16 | 2021-07-28 | 73.002.884.2-044.000 | PT. TRIKREASINDO MANDIRI SENTOSA | 73.002.884.2-044.000 | PT. TRIKREASINDO MANDIRI SENTOSA | 116,116,000 | 22.76 % | Belum dinilai |
7 | 2021 | Dinas Kesehatan | Pengadaan Mobil Pusling | Tender Cepat | Pengadaan Barang | 4144172 | 29933953 | APBD | 497,200,000 | 480,058,600 | 479,529,600 | 479,529,600 | 479,529,600 | 0 | 0 | 0 | 2021-09-01 | 2021-09-03 | 01.878.998.2-731.000 | PT. MITRA MEGAH PROFITAMAS | 17,670,400 | 3.55 % | Belum dinilai | |||
8 | 2021 | Dinas Kesehatan | Pengadaan Mobil Ambulance | Tender Cepat | Pengadaan Barang | 4145172 | 29934012 | APBD | 704,000,000 | 672,112,800 | 641,652,000 | 641,652,000 | 641,652,000 | 0 | 0 | 0 | 2021-09-01 | 2021-09-03 | 01.878.998.2-731.000 | PT. MITRA MEGAH PROFITAMAS | 62,348,000 | 8.86 % | Belum dinilai | |||
9 | 2021 | Dinas Kesehatan | Pengadaan genset beserta instalasinya | Tender Cepat | Pengadaan Barang | 4191172 | 30294568 | APBDP | 3,045,963,785 | 2,973,000,000 | 2,969,670,440 | 2,969,670,440 | 2,969,670,440 | 0 | 0 | 0 | 2021-10-27 | 2021-10-28 | 03.223.724.0-643.000 | CV Pratama Abadi Sejahtera | 76,293,345 | 2.5 % | Belum dinilai | |||
10 | 2021 | Dinas Kesehatan | Pengadaan genset beserta instalasinya | Tender Cepat | Pengadaan Barang | 4191172 | 30294568 | APBDP | 3,045,963,785 | 2,973,000,000 | 2,815,890,000 | 2,815,890,000 | 2,815,890,000 | 0 | 0 | 0 | 2021-10-27 | 2021-10-28 | 94.316.406.1-401.000 | PILAR PRATAMA. CV | 230,073,785 | 7.55 % | Belum dinilai | |||
11 | 2021 | Dinas Tenaga Kerja dan Perindustrian | Pengadaan Mobil Angkutan Mobile Expo | Tender Cepat | Pengadaan Barang | 4197172 | 30406802 | APBD | 750,000,000 | 583,000,000 | 582,000,000 | 582,000,000 | 582,000,000 | 582,000,000 | 0 | 0 | 2021-11-09 | 2021-11-10 | 2021-11-16 | 01.474.170.6-732.000 | PT. WIRA MEGAH PROFITAMAS | 01.474.170.6-732.000 | PT. WIRA MEGAH PROFITAMAS | 168,000,000 | 22.4 % | Belum dinilai |
12 | 2021 | Dinas Kesehatan | Pengadaan Mobil Ambulance RSUD KH Mansyur Kintap | Tender Cepat | Pengadaan Barang | 4218172 | 30574173 | APBD | 300,000,000 | 280,000,000 | 279,796,000 | 279,796,000 | 279,796,000 | 279,796,000 | 0 | 0 | 2021-11-25 | 2021-11-26 | 2021-12-01 | 01.878.998.2-731.000 | PT. MITRA MEGAH PROFITAMAS | 01.878.998.2-731.000 | PT. MITRA MEGAH PROFITAMAS | 20,204,000 | 6.73 % | Belum dinilai |
13 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Alat/Bahan untuk Kegiatan Kantor-Perabot Kantor - Kantong plastik limbah B3 medis | Tender Cepat | Pengadaan Barang | 4219172 | 30717806 | APBDP | 469,908,000 | 449,064,000 | 379,328,400 | 379,328,400 | 379,328,400 | 0 | 0 | 0 | 2021-12-01 | 2021-12-02 | 83.821.690.1-643.000 | CV. KUSUMA BERKAH | 90,579,600 | 19.28 % | Belum dinilai | |||
14 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Alat/Bahan untuk Kegiatan Kantor-Perabot Kantor - Kantong plastik limbah B3 medis | Tender Cepat | Pengadaan Barang | 4219172 | 30717806 | APBDP | 469,908,000 | 449,064,000 | 380,160,000 | 380,160,000 | 380,160,000 | 0 | 0 | 0 | 2021-12-01 | 2021-12-02 | 02.723.262.8-002.000 | CV MENTARI BUNGA LAISA | 89,748,000 | 19.1 % | Belum dinilai | |||
15 | 2021 | Dinas Perumahan Rakyat, Kawasan Permukiman dan Lingkungan Hidup | Belanja Modal Kendaraan Bermotor Khusus - Mobil Box Pendingin Pengangkutan Limbah B3 Medis ke Jasa Pengolahan | Tender Cepat | Pengadaan Barang | 4220172 | 30377322 | APBDP | 300,000,000 | 299,970,000 | 299,750,000 | 299,750,000 | 299,750,000 | 299,750,000 | 0 | 0 | 2021-12-01 | 2021-12-02 | 2021-12-06 | 01.878.998.2-731.000 | PT. MITRA MEGAH PROFITAMAS | 01.878.998.2-731.000 | PT. MITRA MEGAH PROFITAMAS | 250,000 | 0.08 % | Belum dinilai |
16 | 2021 | Badan Pengelolaan Keuangan dan Aset Daerah | Belanja Modal Kendaraan Bermotor Angkutan Barang | Tender Cepat | Pengadaan Barang | 4221172 | 30685032 | APBDP | 1,484,487,999 | 1,419,600,000 | 1,418,700,000 | 1,418,700,000 | 1,418,700,000 | 0 | 0 | 0 | 2021-12-01 | 2021-12-02 | 01.474.170.6-732.000 | PT. WIRA MEGAH PROFITAMAS | 65,787,999 | 4.43 % | Belum dinilai | |||
17 | 2021 | Dinas Komunikasi, Informatika, Statistik dan Persandian | Belanja Peralatan Jaringan | Tender Cepat | Pengadaan Barang | 4222172 | 30707211 | APBDP | 335,799,967 | 285,450,000 | 237,490,000 | 237,490,000 | 237,490,000 | 237,490,000 | 0 | 0 | 2021-12-03 | 2021-12-03 | 2021-12-13 | 02.934.309.2-804.000 | CV. ROXY | 02.934.309.2-804.000 | CV. ROXY | 98,309,967 | 29.28 % | Belum dinilai |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |